Subsoil Excavation (Item 0120 4): FDOT Unit Price History
35 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure CY
- Weighted average (12 mo)
- $12.74/CY
- Contracts (12 mo)
- 35
- Total quantity (12 mo)
- 490,683.2 CY
- Total amount (12 mo)
- $6,252,212
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 29 | $24.00 | 442,554.8 | $10,621,261 |
| 2025 | 2025-01-01 – 2025-12-31 | 45 | $22.80 | 416,791.2 | $9,503,636 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 35 | $12.74 | 490,683.2 | $6,252,212 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 02 | 3 | $35.60 | +179.4% | 623.7 |
| 03 | 7 | $40.22 | +215.7% | 5,313.5 |
| 04 | 2 | $16.80 | +31.9% | 1,434 |
| 05 | 2 | $25.96 | +103.8% | 2,121.2 |
| 06 | 4 | $8.59 | -32.6% | 163,192 |
| 07 | 6 | $13.36 | +4.9% | 102,549.7 |
| 08 | 4 | $18.62 | +46.2% | 12,891.5 |
| 12 | 6 | $14.36 | +12.7% | 201,013 |
| 13 | 1 | $25.00 | +96.2% | 1,544.6 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0120 4 (Subsoil Excavation) is measured in CY. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 35 contracts with a quantity-weighted average of $12.74 per CY, on 490,683.2 CY worth $6,252,212 in total.
The same report run for earlier periods shows $24.00 in 2024 (29 contracts, 442,554.8 CY), $22.80 in 2025 (45 contracts, 416,791.2 CY), $12.74 in the latest 12 months (35 contracts, 490,683.2 CY). From 2024 to the latest 12 months the weighted average fell 46.9%.
FDOT's market-area reports for the same 12 months show how location moves the price. Among the 6 market areas with at least three contracts, market area 06 had the lowest weighted average ($8.59 per CY, 4 contracts) and market area 03 the highest ($40.22, 7 contracts), 4.7 times as much. Market area 03 let the most contracts with this item (7). 9 of FDOT's 14 market areas reported the item in this window.
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0120: 0120 1 Regular Excavation ($7.20 per CY, 142 contracts); 0120 6 Embankment ($10.46 per CY, 127 contracts); 0120 2 2 Borrow Excavation, Truck Measure ($40.45 per CY, 55 contracts); 0120 71 Regular Excavation (3-R Projects Only) ($32,244.84 per LS, 38 contracts); 0120 5 Channel Excavation ($7.06 per CY, 3 contracts).
Related items in section 0120
- 0120 1 · Regular Excavation ($7.20/CY)
- 0120 6 · Embankment ($10.46/CY)
- 0120 2 2 · Borrow Excavation, Truck Measure ($40.45/CY)
- 0120 71 · Regular Excavation (3-R Projects Only) ($32,244.84/LS)
- 0120 5 · Channel Excavation ($7.06/CY)
- 0120 6 11 · Embankment, Supplied BY Department, Delivered BY Department ($4.15/CY)
- 0120 6 12 · Embankment, Supplied BY Department, Delivered BY Contractor ($9.35/CY)
- 0120 74 · Surcharge Embankment ($8.50/CY)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.