Traffic Controller Assembly, Modify Only - NO Components Added (Item 0670 5710): FDOT Unit Price History

14 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure AS

Weighted average (12 mo)
$2,877.82/AS
Contracts (12 mo)
14
Total quantity (12 mo)
32 AS
Total amount (12 mo)
$92,090

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-314$4,695.535$23,478
20252025-01-01 – 2025-12-317$2,863.2312$34,359
Latest 12 months2025-11-01 – 2026-10-3114$2,877.8232$92,090

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
052$613.75-78.7%4
073$1,907.00-33.7%6
083$2,499.53-13.1%8
091$3,522.18+22.4%1
101$4,802.06+66.9%1
111$2,108.34-26.7%4
122$5,479.80+90.4%3
131$5,000.00+73.7%5

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0670 5710 (Traffic Controller Assembly, Modify Only - NO Components Added) is measured in AS. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 14 contracts with a quantity-weighted average of $2,877.82 per AS, on 32 AS worth $92,090 in total.

The same report run for earlier periods shows $4,695.53 in 2024 (4 contracts, 5 AS), $2,863.23 in 2025 (7 contracts, 12 AS), $2,877.82 in the latest 12 months (14 contracts, 32 AS). From 2024 to the latest 12 months the weighted average fell 38.7%.

Quantity let statewide grew 540% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

In the same 12 months, 8 of FDOT's 14 market areas reported this item: area 05 at $613.75 (2 contracts), area 07 at $1,907.00 (3 contracts), area 08 at $2,499.53 (3 contracts), area 09 at $3,522.18 (1 contract), area 10 at $4,802.06 (1 contract), area 11 at $2,108.34 (1 contract), area 12 at $5,479.80 (2 contracts), area 13 at $5,000.00 (1 contract).

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0670: 0670 5600 Traffic Controller Assembly, Remove Controller With Cabinet ($1,436.45 per AS, 43 contracts); 0670 5161 Traffic Controller Assembly, F&I, Nema W/Standard Lock, 1 Preemption ($54,483.02 per AS, 18 contracts); 0670 5160 Traffic Controller Assembly, F&I, Nema W/Standard Lock ($54,826.51 per AS, 16 contracts); 0670 5180 Traffic Controller Assembly, F&I, Caltrans W/Standard Lock ($48,033.22 per AS, 9 contracts); 0670 5162 Traffic Controller Assembly, F&I, Nema W/Standard Lock, 2 Preemption ($52,477.19 per AS, 7 contracts).

Related items in section 0670

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.