Thermoplastic, Preformed, White With Black Contrast ON Concrete Pavement, Message OR Symbol (Item 0711 14560): FDOT Unit Price History

19 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA

Weighted average (12 mo)
$919.10/EA
Contracts (12 mo)
19
Total quantity (12 mo)
60 EA
Total amount (12 mo)
$55,146

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3115$1,181.44210$248,103
20252025-01-01 – 2025-12-3116$1,110.38273$303,135
Latest 12 months2025-11-01 – 2026-10-3119$919.1060$55,146

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
021$785.88-14.5%4
041$650.00-29.3%4
054$751.52-18.2%9
062$686.93-25.3%4
072$1,000.00+8.8%3
082$835.83-9.1%12
091$1,534.13+66.9%1
101$520.00-43.4%6
111$369.30-59.8%2
121$1,561.42+69.9%6
133$1,344.44+46.3%9

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0711 14560 (Thermoplastic, Preformed, White With Black Contrast ON Concrete Pavement, Message OR Symbol) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 19 contracts with a quantity-weighted average of $919.10 per EA, on 60 EA worth $55,146 in total.

The same report run for earlier periods shows $1,181.44 in 2024 (15 contracts, 210 EA), $1,110.38 in 2025 (16 contracts, 273 EA), $919.10 in the latest 12 months (19 contracts, 60 EA). From 2024 to the latest 12 months the weighted average fell 22.2%.

Quantity let statewide shrank 71% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

In the same 12 months, 11 of FDOT's 14 market areas reported this item: area 02 at $785.88 (1 contract), area 04 at $650.00 (1 contract), area 05 at $751.52 (4 contracts), area 06 at $686.93 (2 contracts), area 07 at $1,000.00 (2 contracts), area 08 at $835.83 (2 contracts), area 09 at $1,534.13 (1 contract), area 10 at $520.00 (1 contract), area 11 at $369.30 (1 contract), area 12 at $1,561.42 (1 contract), area 13 at $1,344.44 (3 contracts).

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0711: 0711 16201 Thermoplastic, Standard-Other Surfaces, Yellow, Solid, 6" ($5,264.57 per GM, 204 contracts); 0711 16101 Thermoplastic, Standard-Other Surfaces, White, Solid, 6" ($5,320.58 per GM, 202 contracts); 0711 11125 Thermoplastic, Standard, White, Solid, 24" FOR Stop Line AND Crosswalk ($7.00 per LF, 188 contracts); 0711 11170 Thermoplastic, Standard, White, Arrow ($86.63 per EA, 181 contracts); 0711 11124 Thermoplastic, Standard, White, Solid, 18" FOR Diagonals AND Chevrons ($5.52 per LF, 165 contracts).

Related items in section 0711

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.