PAV Surf Prep FOR MRK (8") (Item 678-7004): TxDOT Unit Price History
1,375 bids · 278 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure LF
TxDOT 678-7004 · PAV SURF PREP FOR MRK (8") · Unit: LF
- Low bid
- $0.050/LF
- Quantity-weighted median of winning unit prices
- Weighted median
- $0.060/LF
- Quantity-weighted median of every bid
- Engineer’s estimate
- $0.160/LF
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -18.37%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 678-7004 (PAV Surf Prep FOR MRK (8")) is measured in LF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,375 bids for it on 278 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 772 bids was $0.060 per LF, and the winning low bidders priced it at a weighted median of $0.050 per LF.
TxDOT's engineer's estimate for the same lines had a weighted median of $0.160 per LF, so winning bids came in 68.8% below the estimate.
By calendar year, the median bid moved from $0.250 in 2025 (595 bids) to $0.200 in 2026 (729 bids), down 20.0%. The middle half of 2026 bids fell between $0.080 and $0.500.
Comparing the last 12 months with the 12 months before, the median unit price fell 18.37%.
Quantity matters for this item. Lines of 10 to 891 LF had a weighted median of $0.350, while lines above 4,262 LF had $0.060, a 83% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 261 lines where both a winning and a second-place bid were published, the median winning unit price was $0.200 against $0.210 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 20 TxDOT districts with at least ten bids, Abilene had the lowest weighted median ($0.010) and San Angelo the highest ($2.00). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 4, 2026 in Collin County, where Mario Sinacola & Sons Excavating, Inc. was the low bidder at $0.180 per LF for 13,222 LF against an estimate of $0.180.
9 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 678-7002 PAV Surf Prep FOR MRK (6") (weighted median $0.020 per LF); 678-7008 PAV Surf Prep FOR MRK (24") (weighted median $0.500 per LF); 678-7009 PAV Surf Prep FOR MRK (Arrow) (weighted median $10.00 per EA); 678-7016 PAV Surf Prep FOR MRK (Word) (weighted median $13.00 per EA).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 51 | 12 | $0.250 | $0.070 | $0.200 | $0.060 | $1.10 |
| 2025 | 595 | 131 | $0.200 | $0.070 | $0.250 | $0.100 | $0.600 |
| 2026 | 729 | 135 | $0.150 | $0.060 | $0.200 | $0.080 | $0.500 |
Quantity bands
| Band | Quantity (LF) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 10–891 | 461 | $0.850 | $0.350 | $0.160–$1.00 |
| Medium | 895–4,205 | 463 | $0.490 | $0.200 | $0.100–$0.500 |
| Large | 4,262–362,282 | 451 | $0.130 | $0.060 | $0.050–$0.220 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $0.200
- Median second-low unit price
- $0.210
- Median engineer’s estimate
- $0.350
- Median gap, second vs. low
- +0%
261 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District
Line quantity 13,222 LF · Engineer’s estimate $0.180/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Mario Sinacola & Sons Excavating, Inc.LOW BID | $0.18/LF | $2,379.96 | — | 0% | $35,766,135 | $890,797 (2.49%) left on table |
| 2 | Ed Bell Construction Company | $0.39/LF | $5,156.58 | +$2,777 | +116.7% | $36,656,931 | +$890,797 |
| 3 | Tiseo Paving Company, LLC | $0.40/LF | $5,288.80 | +$2,909 | +122.2% | $38,169,956 | +$2,403,821 |
| 4 | Harper Brothers Construction LLC | $0.09/LF | $1,189.98 | -$1,190 | -50% | $40,441,503 | +$4,675,368 |
1. Mario Sinacola & Sons Excavating, Inc.
LOW BID · WINNER- Unit price
- $0.18/LF
- Extension
- $2,379.96
- Proposal total
- $35,766,135
- Money left on the table
- $890,797 (2.49%)
- vs. engineer’s estimate
- 0%
- Unit price
- $0.39/LF
- Extension
- $5,156.58
- Proposal total
- $36,656,931
- vs. low bid
- +$890,797
- vs. engineer’s estimate
- +116.7%
3. Tiseo Paving Company, LLC
- Unit price
- $0.40/LF
- Extension
- $5,288.80
- Proposal total
- $38,169,956
- vs. low bid
- +$2,403,821
- vs. engineer’s estimate
- +122.2%
4. Harper Brothers Construction LLC
- Unit price
- $0.09/LF
- Extension
- $1,189.98
- Proposal total
- $40,441,503
- vs. low bid
- +$4,675,368
- vs. engineer’s estimate
- -50%
Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District
Line quantity 12,510 LF · Engineer’s estimate $4.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc.LOW BID | $0.21/LF | $2,627.10 | — | -94.8% | $138,145,038 | $5,131,824 (3.71%) left on table |
| 2 | Rpm Xconstruction, LLC | $0.20/LF | $2,502.00 | -$125.10 | -95% | $143,276,861 | +$5,131,824 |
| 3 | Mario Sinacola & Sons Excavating, Inc. | $0.24/LF | $3,002.40 | +$375.30 | -94% | $152,579,077 | +$14,434,039 |
| 4 | Webber, LLC | $0.18/LF | $2,251.80 | -$375.30 | -95.5% | $153,499,152 | +$15,354,114 |
| 5 | Sema Construction, Inc. | $0.18/LF | $2,251.80 | -$375.30 | -95.5% | $154,136,028 | +$15,990,990 |
| 6 | Zachry Construction Corporation | $0.19/LF | $2,376.90 | -$250.20 | -95.3% | $154,873,429 | +$16,728,392 |
- LOW BID · WINNER
- Unit price
- $0.21/LF
- Extension
- $2,627.10
- Proposal total
- $138,145,038
- Money left on the table
- $5,131,824 (3.71%)
- vs. engineer’s estimate
- -94.8%
2. Rpm Xconstruction, LLC
- Unit price
- $0.20/LF
- Extension
- $2,502.00
- Proposal total
- $143,276,861
- vs. low bid
- +$5,131,824
- vs. engineer’s estimate
- -95%
- Unit price
- $0.24/LF
- Extension
- $3,002.40
- Proposal total
- $152,579,077
- vs. low bid
- +$14,434,039
- vs. engineer’s estimate
- -94%
4. Webber, LLC
- Unit price
- $0.18/LF
- Extension
- $2,251.80
- Proposal total
- $153,499,152
- vs. low bid
- +$15,354,114
- vs. engineer’s estimate
- -95.5%
5. Sema Construction, Inc.
- Unit price
- $0.18/LF
- Extension
- $2,251.80
- Proposal total
- $154,136,028
- vs. low bid
- +$15,990,990
- vs. engineer’s estimate
- -95.5%
6. Zachry Construction Corporation
- Unit price
- $0.19/LF
- Extension
- $2,376.90
- Proposal total
- $154,873,429
- vs. low bid
- +$16,728,392
- vs. engineer’s estimate
- -95.3%
Proposal 0353-01-031 · let Nov 4, 2026 · Wise County, Fort Worth District
Line quantity 1,400 LF · Engineer’s estimate $1.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Xit Paving and Construction Inc.LOW BID | $1.00/LF | $1,400.00 | — | 0% | $482,224 | $101,735 (21.1%) left on table |
| 2 | Ed Bell Construction Company | $1.04/LF | $1,456.00 | +$56.00 | +4% | $583,959 | +$101,735 |
| 3 | O. Trevino Construction, LLC | $0.55/LF | $770.00 | -$630.00 | -45% | $594,655 | +$112,431 |
| 4 | Jay Mills Contracting, Incorporated | $1.40/LF | $1,960.00 | +$560.00 | +40% | $607,976 | +$125,752 |
| 5 | Silver Creek Construction, Inc. | $0.50/LF | $700.00 | -$700.00 | -50% | $649,060 | +$166,836 |
| 6 | Jagoe-Public Company | $0.50/LF | $700.00 | -$700.00 | -50% | $701,946 | +$219,722 |
| 7 | Overland Corporation | $1.00/LF | $1,400.00 | $0.000 | 0% | $771,411 | +$289,187 |
1. Xit Paving and Construction Inc.
LOW BID · WINNER- Unit price
- $1.00/LF
- Extension
- $1,400.00
- Proposal total
- $482,224
- Money left on the table
- $101,735 (21.1%)
- vs. engineer’s estimate
- 0%
- Unit price
- $1.04/LF
- Extension
- $1,456.00
- Proposal total
- $583,959
- vs. low bid
- +$101,735
- vs. engineer’s estimate
- +4%
- Unit price
- $0.55/LF
- Extension
- $770.00
- Proposal total
- $594,655
- vs. low bid
- +$112,431
- vs. engineer’s estimate
- -45%
4. Jay Mills Contracting, Incorporated
- Unit price
- $1.40/LF
- Extension
- $1,960.00
- Proposal total
- $607,976
- vs. low bid
- +$125,752
- vs. engineer’s estimate
- +40%
5. Silver Creek Construction, Inc.
- Unit price
- $0.50/LF
- Extension
- $700.00
- Proposal total
- $649,060
- vs. low bid
- +$166,836
- vs. engineer’s estimate
- -50%
- Unit price
- $0.50/LF
- Extension
- $700.00
- Proposal total
- $701,946
- vs. low bid
- +$219,722
- vs. engineer’s estimate
- -50%
7. Overland Corporation
- Unit price
- $1.00/LF
- Extension
- $1,400.00
- Proposal total
- $771,411
- vs. low bid
- +$289,187
- vs. engineer’s estimate
- 0%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0047-04-032 | Collin | Dallas | 13,222 | 4 | Mario Sinacola & Sons Excavating, Inc. | $0.180 | $0.180 |
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 12,510 | 6 | Indus Road & Bridge, Inc. | $0.210 | $4.00 |
| 2026-11-04 | 0353-01-031 | Wise | Fort Worth | 1,400 | 7 | Xit Paving and Construction Inc. | $1.00 | $1.00 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 38,103 | 6 | Austin Bridge & Road Services, LP | $0.250 | $0.400 |
| 2026-11-03 | 2552-01-062 | El Paso | El Paso | 7,312 | 6 | Allen Concrete, LLC | $0.250 | $0.300 |
| 2026-11-03 | 3330-01-011 | McLennan | Waco | 592 | 9 | The Levy Company, LLC | $0.130 | $0.200 |
| 2026-10-14 | 6502-76-001 | Ellis | Dallas | 5,000 | 2 | Stripe-A-Zone, LLC | $0.010 | $0.150 |
| 2026-10-07 | 0092-05-058 | Ellis | Dallas | 644 | 1 | Clark Construction of Texas, Inc. | $0.200 | $0.140 |
| 2026-10-07 | 0196-03-288 | Dallas | Dallas | 50 | 9 | Garret Shields Infrastructure | $9.00 | $3.00 |
| 2026-10-06 | 0009-11-248 | Dallas | Dallas | 4,845 | 7 | Ragle Construction, Inc. | $0.360 | $0.500 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 11 | $0.010 | $0.010 | $0.340 | — |
| Amarillo | 19 | $0.600 | $0.580 | $0.300 | — |
| Atlanta | 20 | $0.010 | $0.060 | $0.100 | — |
| Austin | 102 | $0.250 | $0.400 | $0.400 | +12.5% |
| Beaumont | 46 | $0.010 | $0.050 | $0.100 | -44.74% |
| Brownwood | 10 | $0.110 | $0.130 | $0.750 | — |
| Bryan | 39 | $0.750 | $0.150 | $0.250 | -20% |
| Childress | 3 | $1.00 | $1.20 | $0.560 | — |
| Dallas | 349 | $0.120 | $0.100 | $0.160 | -33.33% |
| El Paso | 27 | $0.210 | $0.210 | $0.300 | -60.78% |
| Fort Worth | 135 | $0.110 | $0.050 | $0.300 | 0% |
| Houston | 261 | $0.020 | $0.040 | $0.100 | 0% |
| Laredo | 45 | $0.150 | $0.150 | $0.200 | +50% |
| Lubbock | 15 | $0.300 | $0.300 | $0.500 | — |
| Odessa | 19 | $0.430 | $0.380 | $0.150 | — |
| Paris | 19 | $0.210 | $0.200 | $0.500 | — |
| Pharr | 53 | $0.110 | $0.130 | $0.400 | -45.45% |
| San Angelo | 20 | $2.00 | $2.00 | $0.200 | — |
| San Antonio | 78 | $0.040 | $0.050 | $0.160 | +23.53% |
| Tyler | 47 | $0.100 | $0.100 | $0.100 | -80% |
| Waco | 41 | $1.75 | $0.780 | $0.150 | -10.34% |
| Wichita Falls | 8 | $0.150 | $0.150 | $0.500 | — |
| Yoakum | 8 | $0.120 | $0.120 | $0.300 | — |
Related items
- 678-7002 · PAV Surf Prep FOR MRK (6") ($0.020/LF)
- 678-7008 · PAV Surf Prep FOR MRK (24") ($0.500/LF)
- 678-7009 · PAV Surf Prep FOR MRK (Arrow) ($10.00/EA)
- 678-7016 · PAV Surf Prep FOR MRK (Word) ($13.00/EA)
- 677-7001 · Elim EXT PM & Mrks (4") ($0.150/LF)
- 677-7008 · Elim EXT PM & Mrks (24") ($2.80/LF)
- 677-7002 · Elim EXT PM & Mrks (6") ($0.290/LF)
- 677-7004 · Elim EXT PM & Mrks (8") ($0.550/LF)
Is your price for item 678-7004 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.