Concrete Sidewalk AND Driveways, 6" Thick (Item 0522 2): FDOT Unit Price History
168 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure SY
- Weighted average (12 mo)
- $95.64/SY
- Contracts (12 mo)
- 168
- Total quantity (12 mo)
- 133,399 SY
- Total amount (12 mo)
- $12,758,494
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 216 | $98.39 | 217,846 | $21,434,691 |
| 2025 | 2025-01-01 – 2025-12-31 | 194 | $104.10 | 175,426 | $18,262,592 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 168 | $95.64 | 133,399 | $12,758,494 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 9 | $108.59 | +13.5% | 8,735 |
| 02 | 5 | $124.05 | +29.7% | 865 |
| 03 | 9 | $117.54 | +22.9% | 6,329 |
| 04 | 5 | $95.53 | -0.1% | 1,705 |
| 05 | 14 | $81.15 | -15.2% | 7,912 |
| 06 | 15 | $87.43 | -8.6% | 14,729 |
| 07 | 20 | $93.57 | -2.2% | 9,611 |
| 08 | 39 | $92.56 | -3.2% | 44,440 |
| 09 | 3 | $96.69 | +1.1% | 1,840 |
| 10 | 10 | $89.73 | -6.2% | 7,724 |
| 11 | 5 | $118.08 | +23.5% | 3,821 |
| 12 | 17 | $103.56 | +8.3% | 6,397 |
| 13 | 15 | $95.52 | -0.1% | 18,804 |
| 14 | 1 | $190.07 | +98.7% | 280 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0522 2 (Concrete Sidewalk AND Driveways, 6" Thick) is measured in SY. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 168 contracts with a quantity-weighted average of $95.64 per SY, on 133,399 SY worth $12,758,494 in total.
The same report run for earlier periods shows $98.39 in 2024 (216 contracts, 217,846 SY), $104.10 in 2025 (194 contracts, 175,426 SY), $95.64 in the latest 12 months (168 contracts, 133,399 SY). Across those periods the weighted average stayed within three percent.
Quantity let statewide shrank 39% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
FDOT's market-area reports for the same 12 months show how location moves the price. Among the 13 market areas with at least three contracts, market area 05 had the lowest weighted average ($81.15 per SY, 14 contracts) and market area 02 the highest ($124.05, 5 contracts), 1.5 times as much. Market area 08 let the most contracts with this item (39). 14 of FDOT's 14 market areas reported the item in this window.
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0522: 0522 1 Concrete Sidewalk AND Driveways, 4" Thick ($66.35 per SY, 126 contracts); 0522 4 BUS Shelter PAD- Concrete ($127.36 per SY, 3 contracts); 0522 1108 Coquina Concrete Sidewalk AND Driveways, 4" Thick ($141.00 per SY, 1 contracts); 0522 2101 Coquina Concrete Sidewalk AND Driveways, 6" Thick ($108.00 per SY, 1 contracts); 0522 3 BUS Boarding PAD- Concrete ($223.56 per SY, 1 contracts).
Related items in section 0522
- 0522 1 · Concrete Sidewalk AND Driveways, 4" Thick ($66.35/SY)
- 0522 4 · BUS Shelter PAD- Concrete ($127.36/SY)
- 0522 1108 · Coquina Concrete Sidewalk AND Driveways, 4" Thick ($141.00/SY)
- 0522 2101 · Coquina Concrete Sidewalk AND Driveways, 6" Thick ($108.00/SY)
- 0522 3 · BUS Boarding PAD- Concrete ($223.56/SY)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.