Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Loop Assembly- F&I, Type A (Item 0660 2101): FDOT Unit Price History

19 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure AS

Weighted average (12 mo)
$1,635.50/AS
Contracts (12 mo)
19
Total quantity (12 mo)
353 AS
Total amount (12 mo)
$577,330

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3124$1,610.27237$381,633
20252025-01-01 – 2025-12-3119$1,913.01484$925,896
Latest 12 months2025-11-01 – 2026-10-3119$1,635.50353$577,330

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
015$1,595.62-2.4%78
024$1,688.94+3.3%22
034$1,364.60-16.6%99
086$1,822.21+11.4%154

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0660 2101 (Loop Assembly- F&I, Type A) is measured in AS. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 19 contracts with a quantity-weighted average of $1,635.50 per AS, on 353 AS worth $577,330 in total.

The same report run for earlier periods shows $1,610.27 in 2024 (24 contracts, 237 AS), $1,913.01 in 2025 (19 contracts, 484 AS), $1,635.50 in the latest 12 months (19 contracts, 353 AS). Across those periods the weighted average stayed within three percent.

Quantity let statewide grew 49% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 4 market areas with at least three contracts, market area 03 had the lowest weighted average ($1,364.60 per AS, 4 contracts) and market area 08 the highest ($1,822.21, 6 contracts), 1.3 times as much. Market area 08 let the most contracts with this item (6). 4 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0660: 0660 2106 Loop Assembly, F&I, Type F ($1,828.60 per AS, 84 contracts); 0660 2102 Loop Assembly, F&I, Type B ($1,545.86 per AS, 54 contracts); 0660 4 12 Vehicle Detection System- Video, Furnish & Install Above Ground Equipment ($7,890.18 per EA, 43 contracts); 0660 4 11 Vehicle Detection System- Video, Furnish & Install Cabinet Equipment ($14,779.31 per EA, 41 contracts); 0660 1110 Loop Detector Inductive, F&I, Type 10 ($590.20 per EA, 25 contracts).

Related items in section 0660

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.