Load Center, Rework, Secondary Voltage (Item 0715 7 21): FDOT Unit Price History
11 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA
- Weighted average (12 mo)
- $2,783.81/EA
- Contracts (12 mo)
- 11
- Total quantity (12 mo)
- 29 EA
- Total amount (12 mo)
- $80,731
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 19 | $4,006.36 | 28 | $112,178 |
| 2025 | 2025-01-01 – 2025-12-31 | 13 | $3,446.08 | 22 | $75,814 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 11 | $2,783.81 | 29 | $80,731 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 05 | 1 | $892.00 | -68% | 4 |
| 07 | 2 | $517.00 | -81.4% | 2 |
| 08 | 1 | $5,400.00 | +94% | 1 |
| 10 | 1 | $1,719.64 | -38.2% | 1 |
| 11 | 1 | $2,108.34 | -24.3% | 2 |
| 12 | 3 | $2,775.19 | -0.3% | 5 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0715 7 21 (Load Center, Rework, Secondary Voltage) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 11 contracts with a quantity-weighted average of $2,783.81 per EA, on 29 EA worth $80,731 in total.
The same report run for earlier periods shows $4,006.36 in 2024 (19 contracts, 28 EA), $3,446.08 in 2025 (13 contracts, 22 EA), $2,783.81 in the latest 12 months (11 contracts, 29 EA). From 2024 to the latest 12 months the weighted average fell 30.5%.
In the same 12 months, 6 of FDOT's 14 market areas reported this item: area 05 at $892.00 (1 contract), area 07 at $517.00 (2 contracts), area 08 at $5,400.00 (1 contract), area 10 at $1,719.64 (1 contract), area 11 at $2,108.34 (1 contract), area 12 at $2,775.19 (3 contracts).
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0715: 0715 1 12 Lighting Conductors, F&I, Insulated, NO.8 - 6 ($2.53 per LF, 79 contracts); 0715 1 60 Lighting Conductors, Remove & Dispose, Contractor Owns ($0.540 per LF, 53 contracts); 0715 69000 Light Pole Complete, Remove Pole AND Foundation ($835.22 per EA, 46 contracts); 0715 7 11 Load Center, F&I, Secondary Voltage ($20,487.97 per EA, 45 contracts); 0715 1 13 Lighting Conductors, F&I, Insulated, NO 4 TO NO 2 ($3.93 per LF, 40 contracts).
Related items in section 0715
- 0715 1 12 · Lighting Conductors, F&I, Insulated, NO.8 - 6 ($2.53/LF)
- 0715 1 60 · Lighting Conductors, Remove & Dispose, Contractor Owns ($0.540/LF)
- 0715 69000 · Light Pole Complete, Remove Pole AND Foundation ($835.22/EA)
- 0715 7 11 · Load Center, F&I, Secondary Voltage ($20,487.97/EA)
- 0715 1 13 · Lighting Conductors, F&I, Insulated, NO 4 TO NO 2 ($3.93/LF)
- 0715 11211 · Luminaire, F&I- Replace Existing Luminaire ON Existing Pole/ARM, Roadway, Cobra Head ($1,013.16/EA)
- 0715 7 41 · Load Center, Remove, Secondary Voltage ($1,036.38/EA)
- 0715 61300 · Light Pole Complete, F&I, Standard Pole Standard Foundation, 40' Mounting Height, 0' ARM Length ($8,528.16/EA)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.