Load Center, F&I, Secondary Voltage (Item 0715 7 11): FDOT Unit Price History
45 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA
- Weighted average (12 mo)
- $20,487.97/EA
- Contracts (12 mo)
- 45
- Total quantity (12 mo)
- 91 EA
- Total amount (12 mo)
- $1,864,405
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 61 | $21,837.05 | 121 | $2,642,283 |
| 2025 | 2025-01-01 – 2025-12-31 | 57 | $22,474.04 | 132 | $2,966,573 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 45 | $20,487.97 | 91 | $1,864,405 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 1 | $19,200.00 | -6.3% | 2 |
| 02 | 1 | $9,239.86 | -54.9% | 3 |
| 03 | 1 | $20,400.00 | -0.4% | 1 |
| 05 | 1 | $4,914.00 | -76% | 2 |
| 06 | 3 | $18,755.10 | -8.5% | 3 |
| 07 | 5 | $20,109.02 | -1.8% | 12 |
| 08 | 5 | $24,968.70 | +21.9% | 8 |
| 10 | 5 | $19,435.87 | -5.1% | 9 |
| 11 | 3 | $29,526.50 | +44.1% | 8 |
| 12 | 9 | $20,708.81 | +1.1% | 19 |
| 13 | 7 | $19,540.32 | -4.6% | 10 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0715 7 11 (Load Center, F&I, Secondary Voltage) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 45 contracts with a quantity-weighted average of $20,487.97 per EA, on 91 EA worth $1,864,405 in total.
The same report run for earlier periods shows $21,837.05 in 2024 (61 contracts, 121 EA), $22,474.04 in 2025 (57 contracts, 132 EA), $20,487.97 in the latest 12 months (45 contracts, 91 EA). From 2024 to the latest 12 months the weighted average fell 6.2%.
Quantity let statewide shrank 25% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
FDOT's market-area reports for the same 12 months show how location moves the price. Among the 7 market areas with at least three contracts, market area 06 had the lowest weighted average ($18,755.10 per EA, 3 contracts) and market area 11 the highest ($29,526.50, 3 contracts), 1.6 times as much. Market area 12 let the most contracts with this item (9). 11 of FDOT's 14 market areas reported the item in this window.
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0715: 0715 1 12 Lighting Conductors, F&I, Insulated, NO.8 - 6 ($2.53 per LF, 79 contracts); 0715 1 60 Lighting Conductors, Remove & Dispose, Contractor Owns ($0.540 per LF, 53 contracts); 0715 69000 Light Pole Complete, Remove Pole AND Foundation ($835.22 per EA, 46 contracts); 0715 1 13 Lighting Conductors, F&I, Insulated, NO 4 TO NO 2 ($3.93 per LF, 40 contracts); 0715 11211 Luminaire, F&I- Replace Existing Luminaire ON Existing Pole/ARM, Roadway, Cobra Head ($1,013.16 per EA, 38 contracts).
Related items in section 0715
- 0715 1 12 · Lighting Conductors, F&I, Insulated, NO.8 - 6 ($2.53/LF)
- 0715 1 60 · Lighting Conductors, Remove & Dispose, Contractor Owns ($0.540/LF)
- 0715 69000 · Light Pole Complete, Remove Pole AND Foundation ($835.22/EA)
- 0715 1 13 · Lighting Conductors, F&I, Insulated, NO 4 TO NO 2 ($3.93/LF)
- 0715 11211 · Luminaire, F&I- Replace Existing Luminaire ON Existing Pole/ARM, Roadway, Cobra Head ($1,013.16/EA)
- 0715 7 41 · Load Center, Remove, Secondary Voltage ($1,036.38/EA)
- 0715 61300 · Light Pole Complete, F&I, Standard Pole Standard Foundation, 40' Mounting Height, 0' ARM Length ($8,528.16/EA)
- 0715 11125 · Luminaire, F&I, Under Deck, Wall Mount ($1,556.82/EA)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.