Light Pole Complete, F&I, Standard Pole Standard Foundation, 40' Mounting Height, 0' ARM Length (Item 0715 61300): FDOT Unit Price History
14 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA
- Weighted average (12 mo)
- $8,528.16/EA
- Contracts (12 mo)
- 14
- Total quantity (12 mo)
- 341 EA
- Total amount (12 mo)
- $2,908,102
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 13 | $8,317.35 | 396 | $3,293,672 |
| 2025 | 2025-01-01 – 2025-12-31 | 14 | $8,743.79 | 689 | $6,024,473 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 14 | $8,528.16 | 341 | $2,908,102 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 06 | 2 | $12,024.14 | +41% | 21 |
| 07 | 1 | $7,315.00 | -14.2% | 149 |
| 08 | 3 | $9,905.70 | +16.2% | 87 |
| 10 | 1 | $11,464.26 | +34.4% | 2 |
| 12 | 3 | $7,520.39 | -11.8% | 33 |
| 13 | 1 | $8,000.00 | -6.2% | 14 |
| 14 | 1 | $12,325.41 | +44.5% | 4 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0715 61300 (Light Pole Complete, F&I, Standard Pole Standard Foundation, 40' Mounting Height, 0' ARM Length) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 14 contracts with a quantity-weighted average of $8,528.16 per EA, on 341 EA worth $2,908,102 in total.
The same report run for earlier periods shows $8,317.35 in 2024 (13 contracts, 396 EA), $8,743.79 in 2025 (14 contracts, 689 EA), $8,528.16 in the latest 12 months (14 contracts, 341 EA). Across those periods the weighted average stayed within three percent.
In the same 12 months, 7 of FDOT's 14 market areas reported this item: area 06 at $12,024.14 (2 contracts), area 07 at $7,315.00 (1 contract), area 08 at $9,905.70 (3 contracts), area 10 at $11,464.26 (1 contract), area 12 at $7,520.39 (3 contracts), area 13 at $8,000.00 (1 contract), area 14 at $12,325.41 (1 contract).
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0715: 0715 1 12 Lighting Conductors, F&I, Insulated, NO.8 - 6 ($2.53 per LF, 79 contracts); 0715 1 60 Lighting Conductors, Remove & Dispose, Contractor Owns ($0.540 per LF, 53 contracts); 0715 69000 Light Pole Complete, Remove Pole AND Foundation ($835.22 per EA, 46 contracts); 0715 7 11 Load Center, F&I, Secondary Voltage ($20,487.97 per EA, 45 contracts); 0715 1 13 Lighting Conductors, F&I, Insulated, NO 4 TO NO 2 ($3.93 per LF, 40 contracts).
Related items in section 0715
- 0715 1 12 · Lighting Conductors, F&I, Insulated, NO.8 - 6 ($2.53/LF)
- 0715 1 60 · Lighting Conductors, Remove & Dispose, Contractor Owns ($0.540/LF)
- 0715 69000 · Light Pole Complete, Remove Pole AND Foundation ($835.22/EA)
- 0715 7 11 · Load Center, F&I, Secondary Voltage ($20,487.97/EA)
- 0715 1 13 · Lighting Conductors, F&I, Insulated, NO 4 TO NO 2 ($3.93/LF)
- 0715 11211 · Luminaire, F&I- Replace Existing Luminaire ON Existing Pole/ARM, Roadway, Cobra Head ($1,013.16/EA)
- 0715 7 41 · Load Center, Remove, Secondary Voltage ($1,036.38/EA)
- 0715 11125 · Luminaire, F&I, Under Deck, Wall Mount ($1,556.82/EA)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.