Vehicular Traffic Signal, Furnish & Install Polycarbonate, 3 Section, 1 WAY (Item 0650 1 34): FDOT Unit Price History

16 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure AS

Weighted average (12 mo)
$1,668.92/AS
Contracts (12 mo)
16
Total quantity (12 mo)
362 AS
Total amount (12 mo)
$604,151

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3110$2,087.78151$315,255
20252025-01-01 – 2025-12-3116$1,983.70111$220,191
Latest 12 months2025-11-01 – 2026-10-3116$1,668.92362$604,151

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
015$1,810.28+8.5%137
032$1,826.67+9.5%3
051$1,435.00-14%1
063$1,511.06-9.5%109
071$1,400.00-16.1%36
082$2,032.96+21.8%31
111$1,638.58-1.8%26
121$1,499.83-10.1%19

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0650 1 34 (Vehicular Traffic Signal, Furnish & Install Polycarbonate, 3 Section, 1 WAY) is measured in AS. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 16 contracts with a quantity-weighted average of $1,668.92 per AS, on 362 AS worth $604,151 in total.

The same report run for earlier periods shows $2,087.78 in 2024 (10 contracts, 151 AS), $1,983.70 in 2025 (16 contracts, 111 AS), $1,668.92 in the latest 12 months (16 contracts, 362 AS). From 2024 to the latest 12 months the weighted average fell 20.1%.

Quantity let statewide grew 140% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

In the same 12 months, 8 of FDOT's 14 market areas reported this item: area 01 at $1,810.28 (5 contracts), area 03 at $1,826.67 (2 contracts), area 05 at $1,435.00 (1 contract), area 06 at $1,511.06 (3 contracts), area 07 at $1,400.00 (1 contract), area 08 at $2,032.96 (2 contracts), area 11 at $1,638.58 (1 contract), area 12 at $1,499.83 (1 contract).

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0650: 0650 1 14 Vehicular Traffic Signal, Furnish & Install Aluminum, 3 Section, 1 WAY ($1,851.29 per AS, 67 contracts); 0650 2109 Vehicular Signal Auxiliaries, Repair/Replace/Retrofit- Furnish & Install, Backplate- Flexible Required ($641.69 per EA, 42 contracts); 0650 1 16 Vehicular Traffic Signal, Furnish & Install Aluminum, 4 Section, 1 WAY ($2,345.98 per AS, 35 contracts); 0650 1 60 Vehicular Traffic Signal, Remove- Poles TO Remain ($283.67 per AS, 33 contracts); 0650 1 19 Vehicular Traffic Signal, Furnish & Install Aluminum, 5 Section Cluster, 1 WAY ($2,946.05 per AS, 19 contracts).

Related items in section 0650

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.