Vehicular Signal Auxiliaries, Repair/Replace/Retrofit- Furnish & Install, Backplate- Flexible Required (Item 0650 2109): FDOT Unit Price History

42 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA

Weighted average (12 mo)
$641.69/EA
Contracts (12 mo)
42
Total quantity (12 mo)
660 EA
Total amount (12 mo)
$423,513

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3172$718.561,740$1,250,294
20252025-01-01 – 2025-12-3140$734.331,026$753,421
Latest 12 months2025-11-01 – 2026-10-3142$641.69660$423,513

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
013$506.50-21.1%62
024$586.51-8.6%58
033$501.48-21.9%23
054$557.18-13.2%64
062$557.21-13.2%22
074$849.52+32.4%47
0810$695.46+8.4%186
111$843.44+31.4%32
126$737.35+14.9%72
135$524.24-18.3%94

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0650 2109 (Vehicular Signal Auxiliaries, Repair/Replace/Retrofit- Furnish & Install, Backplate- Flexible Required) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 42 contracts with a quantity-weighted average of $641.69 per EA, on 660 EA worth $423,513 in total.

The same report run for earlier periods shows $718.56 in 2024 (72 contracts, 1,740 EA), $734.33 in 2025 (40 contracts, 1,026 EA), $641.69 in the latest 12 months (42 contracts, 660 EA). From 2024 to the latest 12 months the weighted average fell 10.7%.

Quantity let statewide shrank 62% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 8 market areas with at least three contracts, market area 03 had the lowest weighted average ($501.48 per EA, 3 contracts) and market area 07 the highest ($849.52, 4 contracts), 1.7 times as much. Market area 08 let the most contracts with this item (10). 10 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0650: 0650 1 14 Vehicular Traffic Signal, Furnish & Install Aluminum, 3 Section, 1 WAY ($1,851.29 per AS, 67 contracts); 0650 1 16 Vehicular Traffic Signal, Furnish & Install Aluminum, 4 Section, 1 WAY ($2,345.98 per AS, 35 contracts); 0650 1 60 Vehicular Traffic Signal, Remove- Poles TO Remain ($283.67 per AS, 33 contracts); 0650 1 19 Vehicular Traffic Signal, Furnish & Install Aluminum, 5 Section Cluster, 1 WAY ($2,946.05 per AS, 19 contracts); 0650 1 34 Vehicular Traffic Signal, Furnish & Install Polycarbonate, 3 Section, 1 WAY ($1,668.92 per AS, 16 contracts).

Related items in section 0650

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.