Vehicular Traffic Signal, Furnish & Install Polycarbonate, 4 Section, 1 WAY (Item 0650 1 36): FDOT Unit Price History
12 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure AS
- Weighted average (12 mo)
- $2,263.65/AS
- Contracts (12 mo)
- 12
- Total quantity (12 mo)
- 50 AS
- Total amount (12 mo)
- $113,182
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 6 | $2,511.10 | 11 | $27,622 |
| 2025 | 2025-01-01 – 2025-12-31 | 9 | $2,873.57 | 23 | $66,092 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 12 | $2,263.65 | 50 | $113,182 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 5 | $2,287.40 | +1% | 32 |
| 03 | 1 | $1,900.00 | -16.1% | 1 |
| 06 | 3 | $2,203.82 | -2.6% | 8 |
| 07 | 1 | $1,800.00 | -20.5% | 1 |
| 08 | 1 | $2,548.15 | +12.6% | 6 |
| 12 | 1 | $1,682.99 | -25.7% | 2 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0650 1 36 (Vehicular Traffic Signal, Furnish & Install Polycarbonate, 4 Section, 1 WAY) is measured in AS. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 12 contracts with a quantity-weighted average of $2,263.65 per AS, on 50 AS worth $113,182 in total.
The same report run for earlier periods shows $2,511.10 in 2024 (6 contracts, 11 AS), $2,873.57 in 2025 (9 contracts, 23 AS), $2,263.65 in the latest 12 months (12 contracts, 50 AS). From 2024 to the latest 12 months the weighted average fell 9.9%.
Quantity let statewide grew 355% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
In the same 12 months, 6 of FDOT's 14 market areas reported this item: area 01 at $2,287.40 (5 contracts), area 03 at $1,900.00 (1 contract), area 06 at $2,203.82 (3 contracts), area 07 at $1,800.00 (1 contract), area 08 at $2,548.15 (1 contract), area 12 at $1,682.99 (1 contract).
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0650: 0650 1 14 Vehicular Traffic Signal, Furnish & Install Aluminum, 3 Section, 1 WAY ($1,851.29 per AS, 67 contracts); 0650 2109 Vehicular Signal Auxiliaries, Repair/Replace/Retrofit- Furnish & Install, Backplate- Flexible Required ($641.69 per EA, 42 contracts); 0650 1 16 Vehicular Traffic Signal, Furnish & Install Aluminum, 4 Section, 1 WAY ($2,345.98 per AS, 35 contracts); 0650 1 60 Vehicular Traffic Signal, Remove- Poles TO Remain ($283.67 per AS, 33 contracts); 0650 1 19 Vehicular Traffic Signal, Furnish & Install Aluminum, 5 Section Cluster, 1 WAY ($2,946.05 per AS, 19 contracts).
Related items in section 0650
- 0650 1 14 · Vehicular Traffic Signal, Furnish & Install Aluminum, 3 Section, 1 WAY ($1,851.29/AS)
- 0650 2109 · Vehicular Signal Auxiliaries, Repair/Replace/Retrofit- Furnish & Install, Backplate- Flexible Required ($641.69/EA)
- 0650 1 16 · Vehicular Traffic Signal, Furnish & Install Aluminum, 4 Section, 1 WAY ($2,345.98/AS)
- 0650 1 60 · Vehicular Traffic Signal, Remove- Poles TO Remain ($283.67/AS)
- 0650 1 19 · Vehicular Traffic Signal, Furnish & Install Aluminum, 5 Section Cluster, 1 WAY ($2,946.05/AS)
- 0650 1 34 · Vehicular Traffic Signal, Furnish & Install Polycarbonate, 3 Section, 1 WAY ($1,668.92/AS)
- 0650 1 70 · Vehicular Traffic Signal, Relocate- Includes Removal AND Reinstallation ($1,110.37/AS)
- 0650 1 18 · Vehicular Traffic Signal, Furnish & Install Aluminum, 5 Section Straight, 1 WAY ($2,352.96/AS)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.