Vehicular Traffic Signal, Remove- Poles TO Remain (Item 0650 1 60): FDOT Unit Price History

33 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure AS

Weighted average (12 mo)
$283.67/AS
Contracts (12 mo)
33
Total quantity (12 mo)
476 AS
Total amount (12 mo)
$135,028

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3148$263.02633$166,490
20252025-01-01 – 2025-12-3137$310.53258$80,117
Latest 12 months2025-11-01 – 2026-10-3133$283.67476$135,028

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
012$222.82-21.5%59
032$117.50-58.6%8
042$478.49+68.7%19
052$415.65+46.5%10
062$251.06-11.5%94
072$315.38+11.2%26
084$535.39+88.7%22
091$416.03+46.7%6
106$297.79+5%102
111$216.21-23.8%32
123$286.38+1%9
136$244.37-13.9%89

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0650 1 60 (Vehicular Traffic Signal, Remove- Poles TO Remain) is measured in AS. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 33 contracts with a quantity-weighted average of $283.67 per AS, on 476 AS worth $135,028 in total.

The same report run for earlier periods shows $263.02 in 2024 (48 contracts, 633 AS), $310.53 in 2025 (37 contracts, 258 AS), $283.67 in the latest 12 months (33 contracts, 476 AS). From 2024 to the latest 12 months the weighted average rose 7.9%.

Quantity let statewide shrank 25% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 4 market areas with at least three contracts, market area 13 had the lowest weighted average ($244.37 per AS, 6 contracts) and market area 08 the highest ($535.39, 4 contracts), 2.2 times as much. Market area 10 let the most contracts with this item (6). 12 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0650: 0650 1 14 Vehicular Traffic Signal, Furnish & Install Aluminum, 3 Section, 1 WAY ($1,851.29 per AS, 67 contracts); 0650 2109 Vehicular Signal Auxiliaries, Repair/Replace/Retrofit- Furnish & Install, Backplate- Flexible Required ($641.69 per EA, 42 contracts); 0650 1 16 Vehicular Traffic Signal, Furnish & Install Aluminum, 4 Section, 1 WAY ($2,345.98 per AS, 35 contracts); 0650 1 19 Vehicular Traffic Signal, Furnish & Install Aluminum, 5 Section Cluster, 1 WAY ($2,946.05 per AS, 19 contracts); 0650 1 34 Vehicular Traffic Signal, Furnish & Install Polycarbonate, 3 Section, 1 WAY ($1,668.92 per AS, 16 contracts).

Related items in section 0650

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.