Vehicular Traffic Signal, Relocate- Includes Removal AND Reinstallation (Item 0650 1 70): FDOT Unit Price History

15 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure AS

Weighted average (12 mo)
$1,110.37/AS
Contracts (12 mo)
15
Total quantity (12 mo)
123 AS
Total amount (12 mo)
$136,576

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3124$1,619.32105$170,028
20252025-01-01 – 2025-12-3115$1,346.07118$158,836
Latest 12 months2025-11-01 – 2026-10-3115$1,110.37123$136,576

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
012$937.95-15.5%21
033$1,289.17+16.1%12
051$1,465.00+31.9%4
061$1,011.91-8.9%4
072$1,070.29-3.6%7
084$1,136.58+2.4%71
121$906.11-18.4%2
131$750.00-32.5%2

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0650 1 70 (Vehicular Traffic Signal, Relocate- Includes Removal AND Reinstallation) is measured in AS. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 15 contracts with a quantity-weighted average of $1,110.37 per AS, on 123 AS worth $136,576 in total.

The same report run for earlier periods shows $1,619.32 in 2024 (24 contracts, 105 AS), $1,346.07 in 2025 (15 contracts, 118 AS), $1,110.37 in the latest 12 months (15 contracts, 123 AS). From 2024 to the latest 12 months the weighted average fell 31.4%.

Quantity let statewide grew 17% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

In the same 12 months, 8 of FDOT's 14 market areas reported this item: area 01 at $937.95 (2 contracts), area 03 at $1,289.17 (3 contracts), area 05 at $1,465.00 (1 contract), area 06 at $1,011.91 (1 contract), area 07 at $1,070.29 (2 contracts), area 08 at $1,136.58 (4 contracts), area 12 at $906.11 (1 contract), area 13 at $750.00 (1 contract).

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0650: 0650 1 14 Vehicular Traffic Signal, Furnish & Install Aluminum, 3 Section, 1 WAY ($1,851.29 per AS, 67 contracts); 0650 2109 Vehicular Signal Auxiliaries, Repair/Replace/Retrofit- Furnish & Install, Backplate- Flexible Required ($641.69 per EA, 42 contracts); 0650 1 16 Vehicular Traffic Signal, Furnish & Install Aluminum, 4 Section, 1 WAY ($2,345.98 per AS, 35 contracts); 0650 1 60 Vehicular Traffic Signal, Remove- Poles TO Remain ($283.67 per AS, 33 contracts); 0650 1 19 Vehicular Traffic Signal, Furnish & Install Aluminum, 5 Section Cluster, 1 WAY ($2,946.05 per AS, 19 contracts).

Related items in section 0650

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.