Plastic Erosion MAT, Turf Reinforced MAT, Type 1 (Item 0571 1 11): FDOT Unit Price History

10 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure SY

Weighted average (12 mo)
$10.05/SY
Contracts (12 mo)
10
Total quantity (12 mo)
15,251 SY
Total amount (12 mo)
$153,219

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3113$12.5133,133$414,568
20252025-01-01 – 2025-12-3112$9.0468,147$616,087
Latest 12 months2025-11-01 – 2026-10-3110$10.0515,251$153,219

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
062$8.85-11.9%2,760
073$8.98-10.6%5,837
081$6.96-30.7%675
091$15.50+54.2%1,594
101$14.00+39.3%376
111$7.25-27.9%1,000
121$11.45+13.9%3,009

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0571 1 11 (Plastic Erosion MAT, Turf Reinforced MAT, Type 1) is measured in SY. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 10 contracts with a quantity-weighted average of $10.05 per SY, on 15,251 SY worth $153,219 in total.

The same report run for earlier periods shows $12.51 in 2024 (13 contracts, 33,133 SY), $9.04 in 2025 (12 contracts, 68,147 SY), $10.05 in the latest 12 months (10 contracts, 15,251 SY). From 2024 to the latest 12 months the weighted average fell 19.7%.

Quantity let statewide shrank 54% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

In the same 12 months, 7 of FDOT's 14 market areas reported this item: area 06 at $8.85 (2 contracts), area 07 at $8.98 (3 contracts), area 08 at $6.96 (1 contract), area 09 at $15.50 (1 contract), area 10 at $14.00 (1 contract), area 11 at $7.25 (1 contract), area 12 at $11.45 (1 contract).

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0571: 0571 1 12 Plastic Erosion MAT, TRM, Type 2 ($6.07 per SY, 4 contracts); 0571 1 13 Plastic Erosion MAT, Turf Reinforced MAT, Type 3 ($4.72 per SY, 3 contracts).

Related items in section 0571