Signal Cable- Repair/Replace/Other, Furnish & Install (Item 0632 7 2): FDOT Unit Price History
16 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure LF
- Weighted average (12 mo)
- $7.22/LF
- Contracts (12 mo)
- 16
- Total quantity (12 mo)
- 10,798 LF
- Total amount (12 mo)
- $77,941
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 24 | $14.49 | 21,087 | $305,485 |
| 2025 | 2025-01-01 – 2025-12-31 | 21 | $7.41 | 20,088 | $148,919 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 16 | $7.22 | 10,798 | $77,941 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 1 | $3.50 | -51.5% | 1,671 |
| 04 | 2 | $19.20 | +165.9% | 822 |
| 05 | 1 | $5.24 | -27.4% | 235 |
| 06 | 2 | $6.14 | -15% | 120 |
| 07 | 1 | $6.70 | -7.2% | 2,354 |
| 08 | 3 | $8.14 | +12.7% | 343 |
| 09 | 1 | $5.00 | -30.7% | 4,082 |
| 10 | 1 | $50.30 | +596.7% | 14 |
| 12 | 1 | $7.80 | +8% | 467 |
| 13 | 3 | $15.97 | +121.2% | 690 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0632 7 2 (Signal Cable- Repair/Replace/Other, Furnish & Install) is measured in LF. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 16 contracts with a quantity-weighted average of $7.22 per LF, on 10,798 LF worth $77,941 in total.
The same report run for earlier periods shows $14.49 in 2024 (24 contracts, 21,087 LF), $7.41 in 2025 (21 contracts, 20,088 LF), $7.22 in the latest 12 months (16 contracts, 10,798 LF). From 2024 to the latest 12 months the weighted average fell 50.2%.
Quantity let statewide shrank 49% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
In the same 12 months, 10 of FDOT's 14 market areas reported this item: area 01 at $3.50 (1 contract), area 04 at $19.20 (2 contracts), area 05 at $5.24 (1 contract), area 06 at $6.14 (2 contracts), area 07 at $6.70 (1 contract), area 08 at $8.14 (3 contracts), area 09 at $5.00 (1 contract), area 10 at $50.30 (1 contract), area 12 at $7.80 (1 contract), area 13 at $15.97 (3 contracts).
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0632: 0632 7 1 Signal Cable- NEW OR Reconstructed Intersection, Furnish & Install ($11,586.82 per PI, 114 contracts); 0632 7 6 Signal Cable, Remove- Intersection ($1,445.02 per PI, 81 contracts); 0632 7 7 Signal Cable, Remove- Outside OF Intersection ($1.38 per LF, 9 contracts).
Related items in section 0632
- 0632 7 1 · Signal Cable- NEW OR Reconstructed Intersection, Furnish & Install ($11,586.82/PI)
- 0632 7 6 · Signal Cable, Remove- Intersection ($1,445.02/PI)
- 0632 7 7 · Signal Cable, Remove- Outside OF Intersection ($1.38/LF)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.