Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Signal Cable- Repair/Replace/Other, Furnish & Install (Item 0632 7 2): FDOT Unit Price History

16 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure LF

Weighted average (12 mo)
$7.22/LF
Contracts (12 mo)
16
Total quantity (12 mo)
10,798 LF
Total amount (12 mo)
$77,941

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3124$14.4921,087$305,485
20252025-01-01 – 2025-12-3121$7.4120,088$148,919
Latest 12 months2025-11-01 – 2026-10-3116$7.2210,798$77,941

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
011$3.50-51.5%1,671
042$19.20+165.9%822
051$5.24-27.4%235
062$6.14-15%120
071$6.70-7.2%2,354
083$8.14+12.7%343
091$5.00-30.7%4,082
101$50.30+596.7%14
121$7.80+8%467
133$15.97+121.2%690

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0632 7 2 (Signal Cable- Repair/Replace/Other, Furnish & Install) is measured in LF. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 16 contracts with a quantity-weighted average of $7.22 per LF, on 10,798 LF worth $77,941 in total.

The same report run for earlier periods shows $14.49 in 2024 (24 contracts, 21,087 LF), $7.41 in 2025 (21 contracts, 20,088 LF), $7.22 in the latest 12 months (16 contracts, 10,798 LF). From 2024 to the latest 12 months the weighted average fell 50.2%.

Quantity let statewide shrank 49% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

In the same 12 months, 10 of FDOT's 14 market areas reported this item: area 01 at $3.50 (1 contract), area 04 at $19.20 (2 contracts), area 05 at $5.24 (1 contract), area 06 at $6.14 (2 contracts), area 07 at $6.70 (1 contract), area 08 at $8.14 (3 contracts), area 09 at $5.00 (1 contract), area 10 at $50.30 (1 contract), area 12 at $7.80 (1 contract), area 13 at $15.97 (3 contracts).

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0632: 0632 7 1 Signal Cable- NEW OR Reconstructed Intersection, Furnish & Install ($11,586.82 per PI, 114 contracts); 0632 7 6 Signal Cable, Remove- Intersection ($1,445.02 per PI, 81 contracts); 0632 7 7 Signal Cable, Remove- Outside OF Intersection ($1.38 per LF, 9 contracts).

Related items in section 0632

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.