Signal Cable- NEW OR Reconstructed Intersection, Furnish & Install (Item 0632 7 1): FDOT Unit Price History
114 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure PI
- Weighted average (12 mo)
- $11,586.82/PI
- Contracts (12 mo)
- 114
- Total quantity (12 mo)
- 376 PI
- Total amount (12 mo)
- $4,356,643
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 159 | $12,700.32 | 578 | $7,340,783 |
| 2025 | 2025-01-01 – 2025-12-31 | 135 | $12,299.54 | 433 | $5,325,701 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 114 | $11,586.82 | 376 | $4,356,643 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 7 | $10,386.60 | -10.4% | 28 |
| 02 | 5 | $8,431.02 | -27.2% | 6 |
| 03 | 7 | $7,902.08 | -31.8% | 24 |
| 04 | 2 | $7,815.78 | -32.5% | 2 |
| 05 | 9 | $11,165.00 | -3.6% | 21 |
| 06 | 7 | $10,797.11 | -6.8% | 29 |
| 07 | 10 | $9,003.26 | -22.3% | 21 |
| 08 | 28 | $14,206.04 | +22.6% | 86 |
| 09 | 2 | $15,137.03 | +30.6% | 7 |
| 10 | 8 | $13,716.77 | +18.4% | 29 |
| 11 | 2 | $9,839.41 | -15.1% | 5 |
| 12 | 15 | $11,144.08 | -3.8% | 48 |
| 13 | 12 | $10,910.32 | -5.8% | 70 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0632 7 1 (Signal Cable- NEW OR Reconstructed Intersection, Furnish & Install) is measured in PI. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 114 contracts with a quantity-weighted average of $11,586.82 per PI, on 376 PI worth $4,356,643 in total.
The same report run for earlier periods shows $12,700.32 in 2024 (159 contracts, 578 PI), $12,299.54 in 2025 (135 contracts, 433 PI), $11,586.82 in the latest 12 months (114 contracts, 376 PI). From 2024 to the latest 12 months the weighted average fell 8.8%.
Quantity let statewide shrank 35% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
FDOT's market-area reports for the same 12 months show how location moves the price. Among the 10 market areas with at least three contracts, market area 03 had the lowest weighted average ($7,902.08 per PI, 7 contracts) and market area 08 the highest ($14,206.04, 28 contracts), 1.8 times as much. Market area 08 let the most contracts with this item (28). 13 of FDOT's 14 market areas reported the item in this window.
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0632: 0632 7 6 Signal Cable, Remove- Intersection ($1,445.02 per PI, 81 contracts); 0632 7 2 Signal Cable- Repair/Replace/Other, Furnish & Install ($7.22 per LF, 16 contracts); 0632 7 7 Signal Cable, Remove- Outside OF Intersection ($1.38 per LF, 9 contracts).
Related items in section 0632
- 0632 7 6 · Signal Cable, Remove- Intersection ($1,445.02/PI)
- 0632 7 2 · Signal Cable- Repair/Replace/Other, Furnish & Install ($7.22/LF)
- 0632 7 7 · Signal Cable, Remove- Outside OF Intersection ($1.38/LF)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.