141 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure LF

Weighted average (12 mo)
$2.24/LF
Contracts (12 mo)
141
Total quantity (12 mo)
218,852 LF
Total amount (12 mo)
$490,682

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-31201$2.73283,518$774,876
20252025-01-01 – 2025-12-31184$2.70257,321$695,717
Latest 12 months2025-11-01 – 2026-10-31141$2.24218,852$490,682

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
016$2.58+15.2%7,738
028$2.70+20.5%3,715
038$3.25+45.1%8,209
0414$3.03+35.3%8,683
0516$2.94+31.2%17,671
0612$2.36+5.4%26,273
0716$2.14-4.5%24,417
0828$1.86-17%61,679
094$1.88-16.1%6,252
1014$2.05-8.5%33,418
113$3.53+57.6%3,994
126$1.94-13.4%9,543
136$1.91-14.7%7,260

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0710 11125 (Painted Pavement Markings, Standard, White, Solid FOR Stop Line OR Crosswalk, 24") is measured in LF. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 141 contracts with a quantity-weighted average of $2.24 per LF, on 218,852 LF worth $490,682 in total.

The same report run for earlier periods shows $2.73 in 2024 (201 contracts, 283,518 LF), $2.70 in 2025 (184 contracts, 257,321 LF), $2.24 in the latest 12 months (141 contracts, 218,852 LF). From 2024 to the latest 12 months the weighted average fell 17.9%.

Quantity let statewide shrank 23% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 13 market areas with at least three contracts, market area 08 had the lowest weighted average ($1.86 per LF, 28 contracts) and market area 11 the highest ($3.53, 3 contracts), 1.9 times as much. Market area 08 let the most contracts with this item (28). 13 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0710: 0710 90 Painted Pavement Markings, Final Surface ($37,166.90 per LS, 223 contracts); 0710 11101 Painted Pavement Markings, Standard, White, Solid, 6" ($1,691.86 per GM, 177 contracts); 0710 11201 Painted Pavement Markings, Standard, Yellow, Solid, 6" ($1,745.98 per GM, 176 contracts); 0710 11170 Painted Pavement Markings, Standard, White, Arrows ($44.32 per EA, 131 contracts); 0710 11131 Painted Pavement Markings, Standard, White, Skip, 10-30 OR 3-9 Skip, 6" Wide ($786.94 per GM, 127 contracts).

Related items in section 0710

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.