Painted Pavement Markings, Standard, White, Message OR Symbol (Item 0710 11160): FDOT Unit Price History

104 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA

Weighted average (12 mo)
$59.03/EA
Contracts (12 mo)
104
Total quantity (12 mo)
3,088 EA
Total amount (12 mo)
$182,294

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-31149$71.895,439$391,035
20252025-01-01 – 2025-12-31130$68.913,883$267,573
Latest 12 months2025-11-01 – 2026-10-31104$59.033,088$182,294

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
015$65.21+10.5%100
024$21.28-64%42
036$61.62+4.4%141
049$89.28+51.2%126
0511$85.55+44.9%191
0611$76.58+29.7%245
0711$72.37+22.6%182
0823$50.11-15.1%1,013
093$64.39+9.1%22
1011$44.47-24.7%624
111$100.00+69.4%4
127$66.28+12.3%380
132$63.89+8.2%18

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0710 11160 (Painted Pavement Markings, Standard, White, Message OR Symbol) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 104 contracts with a quantity-weighted average of $59.03 per EA, on 3,088 EA worth $182,294 in total.

The same report run for earlier periods shows $71.89 in 2024 (149 contracts, 5,439 EA), $68.91 in 2025 (130 contracts, 3,883 EA), $59.03 in the latest 12 months (104 contracts, 3,088 EA). From 2024 to the latest 12 months the weighted average fell 17.9%.

Quantity let statewide shrank 43% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 11 market areas with at least three contracts, market area 02 had the lowest weighted average ($21.28 per EA, 4 contracts) and market area 04 the highest ($89.28, 9 contracts), 4.2 times as much. Market area 08 let the most contracts with this item (23). 13 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0710: 0710 90 Painted Pavement Markings, Final Surface ($37,166.90 per LS, 223 contracts); 0710 11101 Painted Pavement Markings, Standard, White, Solid, 6" ($1,691.86 per GM, 177 contracts); 0710 11201 Painted Pavement Markings, Standard, Yellow, Solid, 6" ($1,745.98 per GM, 176 contracts); 0710 11125 Painted Pavement Markings, Standard, White, Solid FOR Stop Line OR Crosswalk, 24" ($2.24 per LF, 141 contracts); 0710 11170 Painted Pavement Markings, Standard, White, Arrows ($44.32 per EA, 131 contracts).

Related items in section 0710

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.