Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Painted Pavement Markings, Standard, White, Arrows (Item 0710 11170): FDOT Unit Price History

131 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA

Weighted average (12 mo)
$44.32/EA
Contracts (12 mo)
131
Total quantity (12 mo)
14,171 EA
Total amount (12 mo)
$628,091

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-31189$45.0026,274$1,182,425
20252025-01-01 – 2025-12-31176$45.4818,431$838,194
Latest 12 months2025-11-01 – 2026-10-31131$44.3214,171$628,091

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
016$30.73-30.7%1,002
025$30.58-31%201
038$47.27+6.7%806
0410$54.90+23.9%858
0511$46.10+4%810
0612$49.46+11.6%1,057
0715$42.73-3.6%1,527
0831$41.85-5.6%3,306
094$38.24-13.7%768
1013$38.58-13%2,341
113$43.00-3%558
128$80.64+81.9%762
135$43.27-2.4%175

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0710 11170 (Painted Pavement Markings, Standard, White, Arrows) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 131 contracts with a quantity-weighted average of $44.32 per EA, on 14,171 EA worth $628,091 in total.

The same report run for earlier periods shows $45.00 in 2024 (189 contracts, 26,274 EA), $45.48 in 2025 (176 contracts, 18,431 EA), $44.32 in the latest 12 months (131 contracts, 14,171 EA). Across those periods the weighted average stayed within three percent.

Quantity let statewide shrank 46% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 13 market areas with at least three contracts, market area 02 had the lowest weighted average ($30.58 per EA, 5 contracts) and market area 12 the highest ($80.64, 8 contracts), 2.6 times as much. Market area 08 let the most contracts with this item (31). 13 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0710: 0710 90 Painted Pavement Markings, Final Surface ($37,166.90 per LS, 223 contracts); 0710 11101 Painted Pavement Markings, Standard, White, Solid, 6" ($1,691.86 per GM, 177 contracts); 0710 11201 Painted Pavement Markings, Standard, Yellow, Solid, 6" ($1,745.98 per GM, 176 contracts); 0710 11125 Painted Pavement Markings, Standard, White, Solid FOR Stop Line OR Crosswalk, 24" ($2.24 per LF, 141 contracts); 0710 11131 Painted Pavement Markings, Standard, White, Skip, 10-30 OR 3-9 Skip, 6" Wide ($786.94 per GM, 127 contracts).

Related items in section 0710

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.