Traffic Monitoring Site Cabinet, F&I, Type 3, 2 Pane Back, Pedestal Mount (Item 0695 7162): FDOT Unit Price History

21 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA

Weighted average (12 mo)
$7,798.86/EA
Contracts (12 mo)
21
Total quantity (12 mo)
36 EA
Total amount (12 mo)
$280,759

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3111$7,716.4823$177,479
20252025-01-01 – 2025-12-3125$8,347.7657$475,822
Latest 12 months2025-11-01 – 2026-10-3121$7,798.8636$280,759

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
064$8,269.14+6%7
076$7,827.66+0.4%11
0810$7,638.70-2.1%17
121$6,912.82-11.4%1

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0695 7162 (Traffic Monitoring Site Cabinet, F&I, Type 3, 2 Pane Back, Pedestal Mount) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 21 contracts with a quantity-weighted average of $7,798.86 per EA, on 36 EA worth $280,759 in total.

The same report run for earlier periods shows $7,716.48 in 2024 (11 contracts, 23 EA), $8,347.76 in 2025 (25 contracts, 57 EA), $7,798.86 in the latest 12 months (21 contracts, 36 EA). Across those periods the weighted average stayed within three percent.

Quantity let statewide grew 57% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 3 market areas with at least three contracts, market area 08 had the lowest weighted average ($7,638.70 per EA, 10 contracts) and market area 06 the highest ($8,269.14, 4 contracts), 1.1 times as much. Market area 08 let the most contracts with this item (10). 4 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0695: 0695 1 1 Traffic Monitoring Site Vehicle Sensor-NON-Weight, Furnish & Install ($2,882.93 per EA, 65 contracts); 0695 6 12 Traffic Monitoring Site Inductive Loop Assembly, Furnish & Install, 2 Loops ($2,517.36 per EA, 61 contracts); 0695 7600 Traffic Monitoring Site Cabinet, Remove Existing Cabinet ($1,044.39 per EA, 26 contracts); 0695 7132 Traffic Monitoring Site Cabinet, Furnish & Install, Type 3, Pedestal Mount ($7,828.04 per EA, 13 contracts); 0695 3 11 Traffic Monitoring Site Speed/Classification Unit, Furnish & Install, Volume Speed AND Classification ($13,586.21 per AS, 6 contracts).

Related items in section 0695

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.