Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Traffic Monitoring Site Cabinet, Remove Existing Cabinet (Item 0695 7600): FDOT Unit Price History

26 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA

Weighted average (12 mo)
$1,044.39/EA
Contracts (12 mo)
26
Total quantity (12 mo)
37 EA
Total amount (12 mo)
$38,642

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3134$1,396.5665$90,776
20252025-01-01 – 2025-12-3137$926.6276$70,423
Latest 12 months2025-11-01 – 2026-10-3126$1,044.3937$38,642

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
021$932.64-10.7%1
065$998.25-4.4%6
073$1,169.00+11.9%4
0814$988.25-5.4%21
111$1,150.00+10.1%1
122$1,285.27+23.1%4

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0695 7600 (Traffic Monitoring Site Cabinet, Remove Existing Cabinet) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 26 contracts with a quantity-weighted average of $1,044.39 per EA, on 37 EA worth $38,642 in total.

The same report run for earlier periods shows $1,396.56 in 2024 (34 contracts, 65 EA), $926.62 in 2025 (37 contracts, 76 EA), $1,044.39 in the latest 12 months (26 contracts, 37 EA). From 2024 to the latest 12 months the weighted average fell 25.2%.

Quantity let statewide shrank 43% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 3 market areas with at least three contracts, market area 08 had the lowest weighted average ($988.25 per EA, 14 contracts) and market area 07 the highest ($1,169.00, 3 contracts), 1.2 times as much. Market area 08 let the most contracts with this item (14). 6 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0695: 0695 1 1 Traffic Monitoring Site Vehicle Sensor-NON-Weight, Furnish & Install ($2,882.93 per EA, 65 contracts); 0695 6 12 Traffic Monitoring Site Inductive Loop Assembly, Furnish & Install, 2 Loops ($2,517.36 per EA, 61 contracts); 0695 7162 Traffic Monitoring Site Cabinet, F&I, Type 3, 2 Pane Back, Pedestal Mount ($7,798.86 per EA, 21 contracts); 0695 7132 Traffic Monitoring Site Cabinet, Furnish & Install, Type 3, Pedestal Mount ($7,828.04 per EA, 13 contracts); 0695 3 11 Traffic Monitoring Site Speed/Classification Unit, Furnish & Install, Volume Speed AND Classification ($13,586.21 per AS, 6 contracts).

Related items in section 0695

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.