Traffic Monitoring Site Cabinet, Furnish & Install, Type 3, Pedestal Mount (Item 0695 7132): FDOT Unit Price History
13 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA
- Weighted average (12 mo)
- $7,828.04/EA
- Contracts (12 mo)
- 13
- Total quantity (12 mo)
- 23 EA
- Total amount (12 mo)
- $180,045
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 27 | $9,143.08 | 48 | $438,868 |
| 2025 | 2025-01-01 – 2025-12-31 | 22 | $8,330.93 | 41 | $341,568 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 13 | $7,828.04 | 23 | $180,045 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 05 | 2 | $7,023.57 | -10.3% | 4 |
| 06 | 1 | $12,400.00 | +58.4% | 1 |
| 07 | 1 | $5,800.00 | -25.9% | 2 |
| 08 | 6 | $8,023.33 | +2.5% | 13 |
| 10 | 2 | $8,345.44 | +6.6% | 2 |
| 12 | 1 | $6,956.56 | -11.1% | 1 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0695 7132 (Traffic Monitoring Site Cabinet, Furnish & Install, Type 3, Pedestal Mount) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 13 contracts with a quantity-weighted average of $7,828.04 per EA, on 23 EA worth $180,045 in total.
The same report run for earlier periods shows $9,143.08 in 2024 (27 contracts, 48 EA), $8,330.93 in 2025 (22 contracts, 41 EA), $7,828.04 in the latest 12 months (13 contracts, 23 EA). From 2024 to the latest 12 months the weighted average fell 14.4%.
Quantity let statewide shrank 52% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
In the same 12 months, 6 of FDOT's 14 market areas reported this item: area 05 at $7,023.57 (2 contracts), area 06 at $12,400.00 (1 contract), area 07 at $5,800.00 (1 contract), area 08 at $8,023.33 (6 contracts), area 10 at $8,345.44 (2 contracts), area 12 at $6,956.56 (1 contract).
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0695: 0695 1 1 Traffic Monitoring Site Vehicle Sensor-NON-Weight, Furnish & Install ($2,882.93 per EA, 65 contracts); 0695 6 12 Traffic Monitoring Site Inductive Loop Assembly, Furnish & Install, 2 Loops ($2,517.36 per EA, 61 contracts); 0695 7600 Traffic Monitoring Site Cabinet, Remove Existing Cabinet ($1,044.39 per EA, 26 contracts); 0695 7162 Traffic Monitoring Site Cabinet, F&I, Type 3, 2 Pane Back, Pedestal Mount ($7,798.86 per EA, 21 contracts); 0695 3 11 Traffic Monitoring Site Speed/Classification Unit, Furnish & Install, Volume Speed AND Classification ($13,586.21 per AS, 6 contracts).
Related items in section 0695
- 0695 1 1 · Traffic Monitoring Site Vehicle Sensor-NON-Weight, Furnish & Install ($2,882.93/EA)
- 0695 6 12 · Traffic Monitoring Site Inductive Loop Assembly, Furnish & Install, 2 Loops ($2,517.36/EA)
- 0695 7600 · Traffic Monitoring Site Cabinet, Remove Existing Cabinet ($1,044.39/EA)
- 0695 7162 · Traffic Monitoring Site Cabinet, F&I, Type 3, 2 Pane Back, Pedestal Mount ($7,798.86/EA)
- 0695 3 11 · Traffic Monitoring Site Speed/Classification Unit, Furnish & Install, Volume Speed AND Classification ($13,586.21/AS)
- 0695 6 11 · Traffic Monitoring Site Inductive Loop Assembly, Furnish & Install, 1 Loop ($1,288.44/EA)
- 0695 16 1 · Traffic Monitoring Site Surge Suppressor, Furnish & Install ($1,192.00/EA)
- 0695 7141 · Traffic Monitoring Site Cabinet, Furnish & Install, Type 4, Base Mount ($8,967.03/EA)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.