Lime (COM OR QK)(Slurry) (Item 260-7005): TxDOT Unit Price History

437 bids · 66 bid lines · Dec 3, 2024 to Nov 4, 2026 · unit of measure TON · computed live from the TxDOT API

This item is outside our pre-built index, so its statistics were computed just now from the official TxDOT open-data API. The page is not indexed by search engines.

TxDOT 260-7005 · LIME (COM OR QK)(SLURRY) · Unit: TON

Low bid
$301.00/TON
Quantity-weighted median of winning unit prices
Weighted median
$316.72/TON
Quantity-weighted median of every bid
Engineer’s estimate
$290.00/TON
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-2.7%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$200.00$300.00$400.00$500.00101001K10K100KQuantity (TON), log scaleUnit price ($/TON)
Winning (low) bid Other bid Fitted price curve (ln price = 6.07 − 0.037·ln qty, R² 0.20)320 plotted bids, 3 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Dec 3, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 260-7005 (Lime (COM OR QK)(Slurry)) is measured in TON. Between Dec 3, 2024 and Nov 4, 2026, contractors entered 437 bids for it on 66 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 251 bids was $316.72 per TON, and the winning low bidders priced it at a weighted median of $301.00 per TON.

TxDOT's engineer's estimate for the same lines had a weighted median of $290.00 per TON, so winning bids came in 3.8% above the estimate.

By calendar year, the median bid moved from $347.32 in 2025 (199 bids) to $340.00 in 2026 (234 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $315.00 and $375.00.

Comparing the last 12 months with the 12 months before, the median unit price fell 2.7%.

Quantity matters for this item. Lines of 16.24 to 169 TON had a weighted median of $360.00, while lines above 2,028 TON had $314.68, a 13% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 65 lines where both a winning and a second-place bid were published, the median winning unit price was $335.00 against $335.00 from the second-lowest bidder, a median gap of 1.43% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 9 TxDOT districts with at least ten bids, Pharr had the lowest weighted median ($309.00) and Yoakum the highest ($392.50). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 4, 2026 in Denton County, where Indus Road & Bridge, Inc. was the low bidder at $360.00 per TON for 8,788 TON against an estimate of $290.00.

2 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 260-7001 Lime (COM OR QK)(Slurry) OR QK(DRY) (weighted median $345.92 per TON).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
202441$330.25$327.50$327.50$325.00$332.75
202519933$313.31$312.00$347.32$311.00$375.00
202623432$320.41$318.00$340.00$315.00$375.00

Quantity bands

BandQuantity (TON)BidsWeighted avgWeighted median25th–75th pct
Small16.24–169149$373.57$360.00$335.00–$400.00
Medium176–1,950145$336.22$341.00$315.00–$375.00
Large2,028–19,452143$313.11$314.68$297.50–$346.02

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$335.00
Median second-low unit price
$335.00
Median engineer’s estimate
$320.00
Median gap, second vs. low
+1.43%

65 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District

Line quantity 8,788 TON · Engineer’s estimate $290.00/TON

  • 1. Indus Road & Bridge, Inc.

    LOW BID · WINNER
    Unit price
    $360.00/TON
    Extension
    $3,163,680.00
    Proposal total
    $138,145,038
    Money left on the table
    $5,131,824 (3.71%)
    vs. engineer’s estimate
    +24.1%
  • 2. Rpm Xconstruction, LLC

    Unit price
    $292.00/TON
    Extension
    $2,566,096.00
    Proposal total
    $143,276,861
    vs. low bid
    +$5,131,824
    vs. engineer’s estimate
    +0.7%
  • Unit price
    $320.00/TON
    Extension
    $2,812,160.00
    Proposal total
    $152,579,077
    vs. low bid
    +$14,434,039
    vs. engineer’s estimate
    +10.3%
  • Unit price
    $318.84/TON
    Extension
    $2,801,965.92
    Proposal total
    $153,499,152
    vs. low bid
    +$15,354,114
    vs. engineer’s estimate
    +9.9%
  • 5. Sema Construction, Inc.

    Unit price
    $289.00/TON
    Extension
    $2,539,732.00
    Proposal total
    $154,136,028
    vs. low bid
    +$15,990,990
    vs. engineer’s estimate
    -0.3%
  • 6. Zachry Construction Corporation

    Unit price
    $326.52/TON
    Extension
    $2,869,457.76
    Proposal total
    $154,873,429
    vs. low bid
    +$16,728,392
    vs. engineer’s estimate
    +12.6%

Proposal 1052-02-098 · let Nov 4, 2026 · Nueces County, Corpus Christi District

Line quantity 400 TON · Engineer’s estimate $350.00/TON

  • 1. J E Construction Services, LLC

    LOW BID · WINNER
    Unit price
    $314.00/TON
    Extension
    $125,600.00
    Proposal total
    $3,833,265
    Money left on the table
    $3,958 (0.1%)
    vs. engineer’s estimate
    -10.3%
  • Unit price
    $395.00/TON
    Extension
    $158,000.00
    Proposal total
    $3,837,222
    vs. low bid
    +$3,958
    vs. engineer’s estimate
    +12.9%
  • Unit price
    $350.00/TON
    Extension
    $140,000.00
    Proposal total
    $4,616,801
    vs. low bid
    +$783,537
    vs. engineer’s estimate
    0%
  • 4. Stx Civil

    Unit price
    $405.82/TON
    Extension
    $162,328.00
    Proposal total
    $4,817,402
    vs. low bid
    +$984,137
    vs. engineer’s estimate
    +15.9%
  • Unit price
    $410.00/TON
    Extension
    $164,000.00
    Proposal total
    $4,943,316
    vs. low bid
    +$1,110,051
    vs. engineer’s estimate
    +17.1%

Proposal 0009-11-248 · let Oct 6, 2026 · Dallas County, Dallas District

Line quantity 3,918 TON · Engineer’s estimate $300.00/TON

  • 1. Ragle Construction, Inc.

    LOW BID · WINNER
    Unit price
    $320.00/TON
    Extension
    $1,253,760.00
    Proposal total
    $54,378,798
    Money left on the table
    $3,607,302 (6.63%)
    vs. engineer’s estimate
    +6.7%
  • Unit price
    $313.00/TON
    Extension
    $1,226,334.00
    Proposal total
    $57,986,100
    vs. low bid
    +$3,607,302
    vs. engineer’s estimate
    +4.3%
  • 3. Pulice Construction, Inc.

    Unit price
    $345.00/TON
    Extension
    $1,351,710.00
    Proposal total
    $59,712,296
    vs. low bid
    +$5,333,497
    vs. engineer’s estimate
    +15%
  • 4. Reyes TX, Inc.

    Unit price
    $325.00/TON
    Extension
    $1,273,350.00
    Proposal total
    $59,000,000
    vs. low bid
    +$4,621,202
    vs. engineer’s estimate
    +8.3%
  • Unit price
    $354.21/TON
    Extension
    $1,387,794.78
    Proposal total
    $58,969,550
    vs. low bid
    +$4,590,752
    vs. engineer’s estimate
    +18.1%
  • 6. Balfour Beatty Infrastructure, Inc.

    Unit price
    $326.20/TON
    Extension
    $1,278,051.60
    Proposal total
    $71,960,515
    vs. low bid
    +$17,581,716
    vs. engineer’s estimate
    +8.7%
  • Unit price
    $340.00/TON
    Extension
    $1,332,120.00
    Proposal total
    $80,575,143
    vs. low bid
    +$26,196,345
    vs. engineer’s estimate
    +13.3%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040195-02-092DentonDallas8,7886Indus Road & Bridge, Inc.$360.00$290.00
2026-11-041052-02-098NuecesCorpus Christi4005J E Construction Services, LLC$314.00$350.00
2026-10-070921-02-527HidalgoPharr321Digg Commercial, LLC$300.00$215.00
2026-10-060009-11-248DallasDallas3,9187Ragle Construction, Inc.$320.00$300.00
2026-10-060095-03-100KaufmanDallas1,13410Highway 19 Construction LLC$350.00$325.00
2026-10-062502-01-024BellWaco1,6006Big Creek Construction, Ltd.$350.00$310.00
2026-09-031505-01-016CameronPharr1,6035Reim Construction, Inc.$315.00$260.00
2026-09-023632-01-002StarrPharr9,358.37Ioc Company LLC$215.00$250.00
2026-08-060314-07-070ParkerFort Worth1407Indus Road & Bridge, Inc.$360.00$350.00
2026-08-050014-15-034TarrantFort Worth3,44311Indus Road & Bridge, Inc.$344.00$360.00

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene3$350.00$332.99$320.00—
Austin35$333.99$350.00$300.00—
Beaumont3$400.00$400.00$352.00—
Corpus Christi57$260.00$375.12$300.00+2.67%
Dallas137$320.00$320.00$295.00+1.54%
Fort Worth58$344.00$316.72$360.00-5.71%
Houston7$367.59$350.00$240.00—
Paris11$401.00$375.00$300.00—
Pharr82$215.00$309.00$250.00-5.82%
San Antonio17$330.00$340.00$250.00—
Waco16$350.00$365.00$310.00—
Yoakum11$385.00$392.50$325.00—

Related items

Is your price for item 260-7005 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.