21 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA
- Weighted average (12 mo)
- $7,033.13/EA
- Contracts (12 mo)
- 21
- Total quantity (12 mo)
- 67 EA
- Total amount (12 mo)
- $471,220
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 17 | $8,355.25 | 60 | $501,315 |
| 2025 | 2025-01-01 – 2025-12-31 | 18 | $8,531.76 | 70 | $597,223 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 21 | $7,033.13 | 67 | $471,220 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 03 | 2 | $11,000.00 | +56.4% | 3 |
| 06 | 4 | $6,823.60 | -3% | 15 |
| 07 | 1 | $8,698.28 | +23.7% | 1 |
| 08 | 6 | $6,718.92 | -4.5% | 16 |
| 09 | 1 | $8,443.37 | +20.1% | 2 |
| 10 | 1 | $9,945.00 | +41.4% | 2 |
| 12 | 4 | $6,481.33 | -7.8% | 6 |
| 13 | 2 | $6,545.45 | -6.9% | 22 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0700141360 (Enhanced Highway Sign Assembly, AC Powered, F&I Overhead Mount, Blank OUT Sign <12 SF) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 21 contracts with a quantity-weighted average of $7,033.13 per EA, on 67 EA worth $471,220 in total.
The same report run for earlier periods shows $8,355.25 in 2024 (17 contracts, 60 EA), $8,531.76 in 2025 (18 contracts, 70 EA), $7,033.13 in the latest 12 months (21 contracts, 67 EA). From 2024 to the latest 12 months the weighted average fell 15.8%.
FDOT's market-area reports for the same 12 months show how location moves the price. Among the 3 market areas with at least three contracts, market area 12 had the lowest weighted average ($6,481.33 per EA, 4 contracts) and market area 06 the highest ($6,823.60, 4 contracts), 1.1 times as much. Market area 08 let the most contracts with this item (6). 8 of FDOT's 14 market areas reported the item in this window.
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.