Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Signal Priority AND Preemption System, Furnish AND Install, GPS, Detector (Item 0663 1122): FDOT Unit Price History

13 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA

Weighted average (12 mo)
$9,188.67/EA
Contracts (12 mo)
13
Total quantity (12 mo)
39 EA
Total amount (12 mo)
$358,358

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3123$8,960.2761$546,577
20252025-01-01 – 2025-12-3118$8,708.9045$391,901
Latest 12 months2025-11-01 – 2026-10-3113$9,188.6739$358,358

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
011$10,798.00+17.5%1
031$12,650.00+37.7%1
051$7,610.00-17.2%2
063$9,507.76+3.5%13
072$8,704.39-5.3%4
084$9,859.50+7.3%4
101$8,702.42-5.3%14

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0663 1122 (Signal Priority AND Preemption System, Furnish AND Install, GPS, Detector) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 13 contracts with a quantity-weighted average of $9,188.67 per EA, on 39 EA worth $358,358 in total.

The same report run for earlier periods shows $8,960.27 in 2024 (23 contracts, 61 EA), $8,708.90 in 2025 (18 contracts, 45 EA), $9,188.67 in the latest 12 months (13 contracts, 39 EA). Across those periods the weighted average stayed within three percent.

Quantity let statewide shrank 36% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

In the same 12 months, 7 of FDOT's 14 market areas reported this item: area 01 at $10,798.00 (1 contract), area 03 at $12,650.00 (1 contract), area 05 at $7,610.00 (1 contract), area 06 at $9,507.76 (3 contracts), area 07 at $8,704.39 (2 contracts), area 08 at $9,859.50 (4 contracts), area 10 at $8,702.42 (1 contract).

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0663: 0663 1123 Signal Priority AND Preemption System, Furnish AND Install, GPS, Cabinet Electronics ($9,218.28 per EA, 12 contracts); 0663 1112 Signal Priority AND Preemption System, F&I, Optical, Detector ($3,880.00 per EA, 10 contracts); 0663 1111 Signal Priority AND Preemption System, F&I, Optical, Cabinet Electronics ($10,215.10 per EA, 8 contracts); 0663 1400 Signal Priority & Preemption System, Relocate ($1,562.14 per EA, 4 contracts); 0663 1500 Signal Priority & Preemption System, Adjust/Modify ($2,113.02 per EA, 3 contracts).

Related items in section 0663

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.