Painted Pavement Markings, Standard, White, Yield Line (Item 0710 11180): FDOT Unit Price History
15 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure LF
- Weighted average (12 mo)
- $8.52/LF
- Contracts (12 mo)
- 15
- Total quantity (12 mo)
- 574 LF
- Total amount (12 mo)
- $4,888
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 15 | $7.18 | 1,795 | $12,888 |
| 2025 | 2025-01-01 – 2025-12-31 | 25 | $7.84 | 2,053 | $16,097 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 15 | $8.52 | 574 | $4,888 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 1 | $11.22 | +31.7% | 88 |
| 02 | 1 | $1.12 | -86.9% | 60 |
| 03 | 2 | $5.29 | -37.9% | 80 |
| 05 | 4 | $12.17 | +42.8% | 149 |
| 06 | 1 | $19.50 | +128.9% | 27 |
| 07 | 1 | $11.00 | +29.1% | 27 |
| 08 | 2 | $3.00 | -64.8% | 75 |
| 10 | 2 | $9.49 | +11.4% | 46 |
| 12 | 1 | $5.08 | -40.4% | 22 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0710 11180 (Painted Pavement Markings, Standard, White, Yield Line) is measured in LF. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 15 contracts with a quantity-weighted average of $8.52 per LF, on 574 LF worth $4,888 in total.
The same report run for earlier periods shows $7.18 in 2024 (15 contracts, 1,795 LF), $7.84 in 2025 (25 contracts, 2,053 LF), $8.52 in the latest 12 months (15 contracts, 574 LF). From 2024 to the latest 12 months the weighted average rose 18.7%.
Quantity let statewide shrank 68% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
In the same 12 months, 9 of FDOT's 14 market areas reported this item: area 01 at $11.22 (1 contract), area 02 at $1.12 (1 contract), area 03 at $5.29 (2 contracts), area 05 at $12.17 (4 contracts), area 06 at $19.50 (1 contract), area 07 at $11.00 (1 contract), area 08 at $3.00 (2 contracts), area 10 at $9.49 (2 contracts), area 12 at $5.08 (1 contract).
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0710: 0710 90 Painted Pavement Markings, Final Surface ($37,166.90 per LS, 223 contracts); 0710 11101 Painted Pavement Markings, Standard, White, Solid, 6" ($1,691.86 per GM, 177 contracts); 0710 11201 Painted Pavement Markings, Standard, Yellow, Solid, 6" ($1,745.98 per GM, 176 contracts); 0710 11125 Painted Pavement Markings, Standard, White, Solid FOR Stop Line OR Crosswalk, 24" ($2.24 per LF, 141 contracts); 0710 11170 Painted Pavement Markings, Standard, White, Arrows ($44.32 per EA, 131 contracts).
Related items in section 0710
- 0710 90 · Painted Pavement Markings, Final Surface ($37,166.90/LS)
- 0710 11101 · Painted Pavement Markings, Standard, White, Solid, 6" ($1,691.86/GM)
- 0710 11201 · Painted Pavement Markings, Standard, Yellow, Solid, 6" ($1,745.98/GM)
- 0710 11125 · Painted Pavement Markings, Standard, White, Solid FOR Stop Line OR Crosswalk, 24" ($2.24/LF)
- 0710 11170 · Painted Pavement Markings, Standard, White, Arrows ($44.32/EA)
- 0710 11131 · Painted Pavement Markings, Standard, White, Skip, 10-30 OR 3-9 Skip, 6" Wide ($786.94/GM)
- 0710 11123 · Painted Pavement Markings, Standard, White, Solid FOR Crosswalk AND Roundabout, 12" ($1.48/LF)
- 0710 11141 · Painted Pavement Markings, Standard, White, 2-4 Dotted Guideline/ 6-10 Dotted Extension, 6" ($817.89/GM)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.