Steel Mast ARM Assembly, Remove, Deep Foundation- Bolt ON Attachment (Item 0649 26 5): FDOT Unit Price History

14 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA

Weighted average (12 mo)
$17,189.95/EA
Contracts (12 mo)
14
Total quantity (12 mo)
67 EA
Total amount (12 mo)
$1,151,726

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3116$14,359.0954$775,391
20252025-01-01 – 2025-12-3112$13,136.0350$656,802
Latest 12 months2025-11-01 – 2026-10-3114$17,189.9567$1,151,726

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
011$12,000.00-30.2%9
071$18,221.76+6%3
084$18,557.71+8%19
104$33,950.45+97.5%15
123$5,958.31-65.3%19
131$7,000.00-59.3%2

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0649 26 5 (Steel Mast ARM Assembly, Remove, Deep Foundation- Bolt ON Attachment) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 14 contracts with a quantity-weighted average of $17,189.95 per EA, on 67 EA worth $1,151,726 in total.

The same report run for earlier periods shows $14,359.09 in 2024 (16 contracts, 54 EA), $13,136.03 in 2025 (12 contracts, 50 EA), $17,189.95 in the latest 12 months (14 contracts, 67 EA). From 2024 to the latest 12 months the weighted average rose 19.7%.

Quantity let statewide grew 24% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 3 market areas with at least three contracts, market area 12 had the lowest weighted average ($5,958.31 per EA, 3 contracts) and market area 10 the highest ($33,950.45, 4 contracts), 5.7 times as much. Market area 08 let the most contracts with this item (4). 6 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0649: 0649 21 10 Steel Mast ARM Assembly, Furnish AND Install, Single ARM 60' ($77,764.09 per EA, 25 contracts); 0649 26 3 Steel Mast ARM Assembly, Remove, Shallow Foundation- Bolt ON Attachment ($5,932.28 per EA, 24 contracts); 0649 21 6 Steel Mast ARM Assembly, Furnish AND Install, Single ARM 50' ($70,510.19 per EA, 23 contracts); 0649 21 15 Steel Mast ARM Assembly, Furnish AND Install, Single ARM 70' ($100,157.41 per EA, 22 contracts); 0649 21 21 Steel Mast ARM Assembly, Furnish AND Install, Single ARM 78' ($114,548.85 per EA, 17 contracts).

Related items in section 0649

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.