Steel Mast ARM Assembly, Remove, Shallow Foundation- Bolt ON Attachment (Item 0649 26 3): FDOT Unit Price History
24 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA
- Weighted average (12 mo)
- $5,932.28/EA
- Contracts (12 mo)
- 24
- Total quantity (12 mo)
- 89 EA
- Total amount (12 mo)
- $527,973
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 23 | $10,133.31 | 81 | $820,798 |
| 2025 | 2025-01-01 – 2025-12-31 | 20 | $6,117.30 | 54 | $330,334 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 24 | $5,932.28 | 89 | $527,973 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 1 | $12,100.00 | +104% | 1 |
| 03 | 3 | $6,997.22 | +18% | 9 |
| 05 | 3 | $7,716.38 | +30.1% | 8 |
| 07 | 1 | $9,781.32 | +64.9% | 1 |
| 08 | 5 | $6,289.93 | +6% | 17 |
| 10 | 1 | $5,523.69 | -6.9% | 11 |
| 11 | 1 | $14,486.72 | +144.2% | 2 |
| 12 | 5 | $6,387.61 | +7.7% | 18 |
| 13 | 4 | $3,170.28 | -46.6% | 22 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0649 26 3 (Steel Mast ARM Assembly, Remove, Shallow Foundation- Bolt ON Attachment) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 24 contracts with a quantity-weighted average of $5,932.28 per EA, on 89 EA worth $527,973 in total.
The same report run for earlier periods shows $10,133.31 in 2024 (23 contracts, 81 EA), $6,117.30 in 2025 (20 contracts, 54 EA), $5,932.28 in the latest 12 months (24 contracts, 89 EA). From 2024 to the latest 12 months the weighted average fell 41.5%.
FDOT's market-area reports for the same 12 months show how location moves the price. Among the 5 market areas with at least three contracts, market area 13 had the lowest weighted average ($3,170.28 per EA, 4 contracts) and market area 05 the highest ($7,716.38, 3 contracts), 2.4 times as much. Market area 08 let the most contracts with this item (5). 9 of FDOT's 14 market areas reported the item in this window.
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0649: 0649 21 10 Steel Mast ARM Assembly, Furnish AND Install, Single ARM 60' ($77,764.09 per EA, 25 contracts); 0649 21 6 Steel Mast ARM Assembly, Furnish AND Install, Single ARM 50' ($70,510.19 per EA, 23 contracts); 0649 21 15 Steel Mast ARM Assembly, Furnish AND Install, Single ARM 70' ($100,157.41 per EA, 22 contracts); 0649 21 21 Steel Mast ARM Assembly, Furnish AND Install, Single ARM 78' ($114,548.85 per EA, 17 contracts); 0649 21 3 Steel Mast ARM Assembly, Furnish AND Install, Single ARM 40' ($63,014.58 per EA, 17 contracts).
Related items in section 0649
- 0649 21 10 · Steel Mast ARM Assembly, Furnish AND Install, Single ARM 60' ($77,764.09/EA)
- 0649 21 6 · Steel Mast ARM Assembly, Furnish AND Install, Single ARM 50' ($70,510.19/EA)
- 0649 21 15 · Steel Mast ARM Assembly, Furnish AND Install, Single ARM 70' ($100,157.41/EA)
- 0649 21 21 · Steel Mast ARM Assembly, Furnish AND Install, Single ARM 78' ($114,548.85/EA)
- 0649 21 3 · Steel Mast ARM Assembly, Furnish AND Install, Single ARM 40' ($63,014.58/EA)
- 0649 26 5 · Steel Mast ARM Assembly, Remove, Deep Foundation- Bolt ON Attachment ($17,189.95/EA)
- 0649 21 1 · Steel Mast ARM Assembly, Furnish AND Install, Single ARM 30' ($57,899.54/EA)
- 0649 21 13 · Steel Mast ARM Assembly, Furnish AND Install, Double ARM 60'-50' ($107,239.95/EA)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.