Thermoplastic, Standard-Other Surfaces, Yellow, Skip, 6" (Item 0711 16231): FDOT Unit Price History
69 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure GM
- Weighted average (12 mo)
- $2,091.82/GM
- Contracts (12 mo)
- 69
- Total quantity (12 mo)
- 145.33 GM
- Total amount (12 mo)
- $304,010
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 89 | $1,918.03 | 400.04 | $767,295 |
| 2025 | 2025-01-01 – 2025-12-31 | 77 | $2,306.64 | 219.83 | $507,064 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 69 | $2,091.82 | 145.33 | $304,010 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 9 | $2,041.08 | -2.4% | 23.34 |
| 02 | 7 | $2,662.98 | +27.3% | 20.91 |
| 03 | 5 | $3,495.33 | +67.1% | 9.32 |
| 04 | 6 | $2,046.15 | -2.2% | 28.78 |
| 05 | 4 | $2,216.89 | +6% | 7.5 |
| 06 | 9 | $1,806.56 | -13.6% | 29.7 |
| 07 | 3 | $2,260.67 | +8.1% | 2.58 |
| 08 | 12 | $1,982.59 | -5.2% | 3.66 |
| 09 | 2 | $1,198.18 | -42.7% | 1.33 |
| 10 | 6 | $742.37 | -64.5% | 11.81 |
| 11 | 1 | $2,534.30 | +21.2% | 2.69 |
| 12 | 2 | $5,717.32 | +173.3% | 0.93 |
| 13 | 3 | $1,209.54 | -42.2% | 2.79 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0711 16231 (Thermoplastic, Standard-Other Surfaces, Yellow, Skip, 6") is measured in GM. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 69 contracts with a quantity-weighted average of $2,091.82 per GM, on 145.33 GM worth $304,010 in total.
The same report run for earlier periods shows $1,918.03 in 2024 (89 contracts, 400.04 GM), $2,306.64 in 2025 (77 contracts, 219.83 GM), $2,091.82 in the latest 12 months (69 contracts, 145.33 GM). From 2024 to the latest 12 months the weighted average rose 9.1%.
Quantity let statewide shrank 64% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
FDOT's market-area reports for the same 12 months show how location moves the price. Among the 10 market areas with at least three contracts, market area 10 had the lowest weighted average ($742.37 per GM, 6 contracts) and market area 03 the highest ($3,495.33, 5 contracts), 4.7 times as much. Market area 08 let the most contracts with this item (12). 13 of FDOT's 14 market areas reported the item in this window.
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0711: 0711 16201 Thermoplastic, Standard-Other Surfaces, Yellow, Solid, 6" ($5,264.57 per GM, 204 contracts); 0711 16101 Thermoplastic, Standard-Other Surfaces, White, Solid, 6" ($5,320.58 per GM, 202 contracts); 0711 11125 Thermoplastic, Standard, White, Solid, 24" FOR Stop Line AND Crosswalk ($7.00 per LF, 188 contracts); 0711 11170 Thermoplastic, Standard, White, Arrow ($86.63 per EA, 181 contracts); 0711 11124 Thermoplastic, Standard, White, Solid, 18" FOR Diagonals AND Chevrons ($5.52 per LF, 165 contracts).
Related items in section 0711
- 0711 16201 · Thermoplastic, Standard-Other Surfaces, Yellow, Solid, 6" ($5,264.57/GM)
- 0711 16101 · Thermoplastic, Standard-Other Surfaces, White, Solid, 6" ($5,320.58/GM)
- 0711 11125 · Thermoplastic, Standard, White, Solid, 24" FOR Stop Line AND Crosswalk ($7.00/LF)
- 0711 11170 · Thermoplastic, Standard, White, Arrow ($86.63/EA)
- 0711 11124 · Thermoplastic, Standard, White, Solid, 18" FOR Diagonals AND Chevrons ($5.52/LF)
- 0711 11123 · Thermoplastic, Standard, White, Solid, 12" FOR Crosswalk AND Roundabout ($3.76/LF)
- 0711 11224 · Thermoplastic, Standard, Yellow, Solid, 18" FOR Diagonal OR Chevron ($5.06/LF)
- 0711 11160 · Thermoplastic, Standard, White, Message OR Symbol ($177.80/EA)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.