Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

RE Profile PM TY I(Y)6"(SLD)(100MIL) (Item 666-7270): TxDOT Unit Price History

1,191 bids · 214 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure LF

TxDOT 666-7270 · RE PROFILE PM TY I(Y)6"(SLD)(100MIL) · Unit: LF

Low bid
$0.600/LF
Quantity-weighted median of winning unit prices
Weighted median
$0.680/LF
Quantity-weighted median of every bid
Engineer’s estimate
$0.700/LF
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-5%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$2.00$4.00$6.00$8.00101001K10K100K1M10MQuantity (LF), log scaleUnit price ($/LF)
Winning (low) bid Other bid Fitted price curve (ln price = 2.18 − 0.204·ln qty, R² 0.51)320 plotted bids, 6 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 666-7270 (RE Profile PM TY I(Y)6"(SLD)(100MIL)) is measured in LF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,191 bids for it on 214 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 586 bids was $0.680 per LF, and the winning low bidders priced it at a weighted median of $0.600 per LF.

TxDOT's engineer's estimate for the same lines had a weighted median of $0.700 per LF, so winning bids came in 14.3% below the estimate.

By calendar year, the median bid moved from $1.00 in 2025 (636 bids) to $0.930 in 2026 (507 bids), down 7.0%. The middle half of 2026 bids fell between $0.750 and $1.40.

Comparing the last 12 months with the 12 months before, the median unit price fell 5%.

Quantity matters for this item. Lines of 12 to 5,986 LF had a weighted median of $1.90, while lines above 61,395 LF had $0.670, a 65% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 211 lines where both a winning and a second-place bid were published, the median winning unit price was $0.920 against $0.950 from the second-lowest bidder, a median gap of 1.11% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 20 TxDOT districts with at least ten bids, Fort Worth had the lowest weighted median ($0.380) and Lufkin the highest ($1.00). The busiest district for this item was Austin.

The most recent letting with this item was on Nov 4, 2026 in Hays County, where Bobcat Services, Inc. was the low bidder at $0.890 per LF for 34,312 LF against an estimate of $0.770.

12 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 666-7024 Refl PAV MRK TY I (W)8"(SLD)(100MIL) (weighted median $0.850 per LF); 666-7423 Refl PAV MRK TY I (Y)6"(SLD)(100MIL) (weighted median $0.450 per LF); 666-7036 Refl PAV MRK TY I (W)24"(SLD)(100MIL) (weighted median $7.00 per LF); 666-7411 Refl PAV MRK TY I (W)6"(SLD)(100MIL) (weighted median $0.450 per LF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
20244810$0.700$0.700$0.870$0.710$1.79
2025636111$0.740$0.680$1.00$0.800$1.75
202650794$0.700$0.680$0.930$0.750$1.40

Quantity bands

BandQuantity (LF)BidsWeighted avgWeighted median25th–75th pct
Small12–5,986397$2.27$1.90$1.38–$4.00
Medium6,406–58,382403$0.970$0.900$0.800–$1.15
Large61,395–1,637,513391$0.700$0.670$0.650–$0.900

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$0.920
Median second-low unit price
$0.950
Median engineer’s estimate
$0.950
Median gap, second vs. low
+1.11%

211 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0016-03-125 · let Nov 4, 2026 · Hays County, Austin District

Line quantity 34,312 LF · Engineer’s estimate $0.770/LF

  • 1. Bobcat Services, Inc.

    LOW BID · WINNER
    Unit price
    $0.89/LF
    Extension
    $30,537.68
    Proposal total
    $2,797,454
    Money left on the table
    $386,828 (13.83%)
    vs. engineer’s estimate
    +15.6%
  • Unit price
    $0.85/LF
    Extension
    $29,165.20
    Proposal total
    $3,184,282
    vs. low bid
    +$386,828
    vs. engineer’s estimate
    +10.4%
  • Unit price
    $1.00/LF
    Extension
    $34,312.00
    Proposal total
    $3,495,937
    vs. low bid
    +$698,482
    vs. engineer’s estimate
    +29.9%
  • Unit price
    $0.75/LF
    Extension
    $25,734.00
    Proposal total
    $3,586,449
    vs. low bid
    +$788,995
    vs. engineer’s estimate
    -2.6%
  • Unit price
    $0.85/LF
    Extension
    $29,165.20
    Proposal total
    $3,801,261
    vs. low bid
    +$1,003,807
    vs. engineer’s estimate
    +10.4%
  • Unit price
    $0.85/LF
    Extension
    $29,165.20
    Proposal total
    $3,825,058
    vs. low bid
    +$1,027,604
    vs. engineer’s estimate
    +10.4%

Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District

Line quantity 41,725 LF · Engineer’s estimate $1.00/LF

  • 1. Fluor Enterprises, Inc.

    LOW BID · WINNER
    Unit price
    $1.05/LF
    Extension
    $43,811.25
    Proposal total
    $30,209,876
    Money left on the table
    $2,977,718 (9.86%)
    vs. engineer’s estimate
    +5%
  • Unit price
    $0.90/LF
    Extension
    $37,552.50
    Proposal total
    $33,187,594
    vs. low bid
    +$2,977,718
    vs. engineer’s estimate
    -10%
  • Unit price
    $1.34/LF
    Extension
    $55,911.50
    Proposal total
    $33,911,798
    vs. low bid
    +$3,701,922
    vs. engineer’s estimate
    +34%
  • Unit price
    $1.10/LF
    Extension
    $45,897.50
    Proposal total
    $34,862,676
    vs. low bid
    +$4,652,800
    vs. engineer’s estimate
    +10%
  • Unit price
    $0.80/LF
    Extension
    $33,380.00
    Proposal total
    $39,237,828
    vs. low bid
    +$9,027,952
    vs. engineer’s estimate
    -20%
  • Unit price
    $0.86/LF
    Extension
    $35,883.50
    Proposal total
    $39,562,405
    vs. low bid
    +$9,352,529
    vs. engineer’s estimate
    -14%
  • Unit price
    $0.84/LF
    Extension
    $35,049.00
    Proposal total
    $39,630,699
    vs. low bid
    +$9,420,823
    vs. engineer’s estimate
    -16%
  • Unit price
    $1.10/LF
    Extension
    $45,897.50
    Proposal total
    $39,994,995
    vs. low bid
    +$9,785,119
    vs. engineer’s estimate
    +10%
  • 9. Zachry Construction Corporation

    Unit price
    $1.35/LF
    Extension
    $56,328.75
    Proposal total
    $42,444,061
    vs. low bid
    +$12,234,185
    vs. engineer’s estimate
    +35%
  • 10. Brizo Construction, LLC

    Unit price
    $1.16/LF
    Extension
    $48,401.00
    Proposal total
    $43,708,350
    vs. low bid
    +$13,498,474
    vs. engineer’s estimate
    +16%
  • Unit price
    $1.25/LF
    Extension
    $52,156.25
    Proposal total
    $44,387,970
    vs. low bid
    +$14,178,094
    vs. engineer’s estimate
    +25%
  • Unit price
    $1.44/LF
    Extension
    $60,084.00
    Proposal total
    $48,396,973
    vs. low bid
    +$18,187,097
    vs. engineer’s estimate
    +44%

Proposal 0015-13-432 · let Nov 3, 2026 · Travis County, Austin District

Line quantity 2,149 LF · Engineer’s estimate $0.590/LF

  • Unit price
    $1.00/LF
    Extension
    $2,149.00
    Proposal total
    $412,233,374
    Money left on the table
    $3,506,193 (0.85%)
    vs. engineer’s estimate
    +69.5%
  • 2. Pulice Construction, Inc.

    Unit price
    $1.63/LF
    Extension
    $3,502.87
    Proposal total
    $415,739,567
    vs. low bid
    +$3,506,193
    vs. engineer’s estimate
    +176.3%
  • 3. Fluor Enterprises, Inc.

    Unit price
    $1.71/LF
    Extension
    $3,674.79
    Proposal total
    $473,353,333
    vs. low bid
    +$61,119,959
    vs. engineer’s estimate
    +189.8%
  • 4. Harper Brothers Construction LLC

    Unit price
    $2.00/LF
    Extension
    $4,298.00
    Proposal total
    $477,550,553
    vs. low bid
    +$65,317,180
    vs. engineer’s estimate
    +239%
  • Unit price
    $1.60/LF
    Extension
    $3,438.40
    Proposal total
    $477,564,067
    vs. low bid
    +$65,330,694
    vs. engineer’s estimate
    +171.2%
  • 6. Balfour Beatty Infrastructure, Inc.

    Unit price
    $1.00/LF
    Extension
    $2,149.00
    Proposal total
    $492,134,823
    vs. low bid
    +$79,901,450
    vs. engineer’s estimate
    +69.5%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040016-03-125HaysAustin34,3126Bobcat Services, Inc.$0.890$0.770
2026-11-040212-03-058BrazosBryan41,72512Fluor Enterprises, Inc.$1.05$1.00
2026-11-030015-13-432TravisAustin2,1496Austin Bridge & Road Services, LP$1.00$0.590
2026-11-030044-06-079MontagueWichita Falls610,6776Breedon Investments USA Inc.$0.670$0.550
2026-11-030901-00-066LamarParis992,4454Striping Technology, L.P.$0.600$0.600
2026-11-032552-01-062El PasoEl Paso39,2816Allen Concrete, LLC$1.45$1.20
2026-10-146502-76-001EllisDallas26,4002Stripe-A-Zone, LLC$0.960$0.870
2026-10-070022-01-034TerrellOdessa5,8057Relmco, Inc.$2.20$1.00
2026-10-070907-00-217Tom GreenSan Angelo1,109,5957Flat Line, Inc.$0.570$0.680
2026-10-076507-19-001MedinaSan Antonio347,6123Ronald R. Wagner & Co., LP$0.640$0.500

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene31$0.650$0.650$0.700—
Atlanta7$1.20$1.30$0.700—
Austin182$0.660$0.760$0.800-13%
Beaumont17$0.850$0.900$0.300—
Brownwood18$0.750$0.750$0.690—
Bryan43$0.570$0.650$0.550—
Childress11$1.09$0.680$0.700—
Corpus Christi7$8.25$8.00$3.30—
Dallas17$0.890$0.810$0.870—
El Paso46$0.610$0.800$0.550-8.75%
Fort Worth21$0.150$0.380$0.700—
Houston91$0.800$0.810$1.50-40%
Laredo34$0.600$0.650$0.750-31.67%
Lubbock2$1.40$1.35$2.50—
Lufkin29$0.970$1.00$1.75-43.1%
Odessa74$0.700$0.710$0.660+7.53%
Paris64$0.600$0.680$0.6000%
Pharr59$0.840$0.850$1.00+69.57%
San Angelo36$0.570$0.700$0.680+11.25%
San Antonio179$0.540$0.670$0.700-8.57%
Tyler56$0.800$0.830$0.950—
Waco32$0.470$0.650$0.850—
Wichita Falls6$0.670$0.670$0.550—
Yoakum129$0.730$0.950$0.750+72.68%

Related items

Is your price for item 666-7270 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.