Pile Inspection, Driven Pile (Item 0455 20 1): FDOT Unit Price History
24 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA
- Weighted average (12 mo)
- $736.94/EA
- Contracts (12 mo)
- 24
- Total quantity (12 mo)
- 2,244 EA
- Total amount (12 mo)
- $1,653,701
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 5 | $1,043.20 | 439 | $457,963 |
| 2025 | 2025-01-01 – 2025-12-31 | 29 | $653.92 | 3,980 | $2,602,592 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 24 | $736.94 | 2,244 | $1,653,701 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 5 | $1,160.46 | +57.5% | 152 |
| 02 | 1 | $966.00 | +31.1% | 35 |
| 03 | 3 | $1,213.55 | +64.7% | 179 |
| 04 | 2 | $539.50 | -26.8% | 121 |
| 07 | 4 | $1,183.14 | +60.5% | 465 |
| 08 | 2 | $621.67 | -15.6% | 54 |
| 09 | 1 | $401.99 | -45.5% | 10 |
| 10 | 1 | $200.00 | -72.9% | 334 |
| 11 | 1 | $500.00 | -32.2% | 468 |
| 12 | 4 | $639.54 | -13.2% | 426 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0455 20 1 (Pile Inspection, Driven Pile) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 24 contracts with a quantity-weighted average of $736.94 per EA, on 2,244 EA worth $1,653,701 in total.
The same report run for earlier periods shows $1,043.20 in 2024 (5 contracts, 439 EA), $653.92 in 2025 (29 contracts, 3,980 EA), $736.94 in the latest 12 months (24 contracts, 2,244 EA). From 2024 to the latest 12 months the weighted average fell 29.4%.
Quantity let statewide grew 411% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
FDOT's market-area reports for the same 12 months show how location moves the price. Among the 4 market areas with at least three contracts, market area 12 had the lowest weighted average ($639.54 per EA, 4 contracts) and market area 03 the highest ($1,213.55, 3 contracts), 1.9 times as much. Market area 01 let the most contracts with this item (5). 10 of FDOT's 14 market areas reported the item in this window.
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0455: 0455 34 5 Prestressed Concrete Piling, 24" SQ ($175.74 per LF, 9 contracts); 0455 34 3 Prestressed Concrete Piling, 18" SQ ($154.76 per LF, 8 contracts); 0455 15 13 Preformed Pile Holes, 22" TO 26" Drill/Punch Size ($82.46 per LF, 7 contracts); 0455 15 14 Preformed Pile Holes, 24" TO 29" Drill/Punch Size ($69.26 per LF, 6 contracts); 0455 15 15 Preformed Pile Holes, 30" TO 34" Drill/Punch Size ($65.59 per LF, 5 contracts).
Related items in section 0455
- 0455 34 5 · Prestressed Concrete Piling, 24" SQ ($175.74/LF)
- 0455 34 3 · Prestressed Concrete Piling, 18" SQ ($154.76/LF)
- 0455 15 13 · Preformed Pile Holes, 22" TO 26" Drill/Punch Size ($82.46/LF)
- 0455 15 14 · Preformed Pile Holes, 24" TO 29" Drill/Punch Size ($69.26/LF)
- 0455 15 15 · Preformed Pile Holes, 30" TO 34" Drill/Punch Size ($65.59/LF)
- 0455 35 22 · Steel Piling, 24" Dia. Pipe ($204.49/LF)
- 0455 15 16 · Preformed Pile Holes, 36" TO 43" Drill/Punch Size ($135.71/LF)
- 0455 17118 · PRE-Planned Pile Splice, Concrete Square, 18" ($4,024.29/EA)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.