Midblock Crosswalk: Pedestrian Hybrid Beacon Assembly, Furnish & Install Complete Assembly (Item 0654 3 10): FDOT Unit Price History

10 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure AS

Weighted average (12 mo)
$2,432.45/AS
Contracts (12 mo)
10
Total quantity (12 mo)
70 AS
Total amount (12 mo)
$170,271

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3116$2,197.42166$364,771
20252025-01-01 – 2025-12-317$2,170.0278$169,261
Latest 12 months2025-11-01 – 2026-10-3110$2,432.4570$170,271

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
052$2,325.71-4.4%6
062$2,446.66+0.6%28
084$2,602.24+7%26
102$2,015.22-17.2%10

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0654 3 10 (Midblock Crosswalk: Pedestrian Hybrid Beacon Assembly, Furnish & Install Complete Assembly) is measured in AS. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 10 contracts with a quantity-weighted average of $2,432.45 per AS, on 70 AS worth $170,271 in total.

The same report run for earlier periods shows $2,197.42 in 2024 (16 contracts, 166 AS), $2,170.02 in 2025 (7 contracts, 78 AS), $2,432.45 in the latest 12 months (10 contracts, 70 AS). From 2024 to the latest 12 months the weighted average rose 10.7%.

Quantity let statewide shrank 58% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

In the same 12 months, 4 of FDOT's 14 market areas reported this item: area 05 at $2,325.71 (2 contracts), area 06 at $2,446.66 (2 contracts), area 08 at $2,602.24 (4 contracts), area 10 at $2,015.22 (2 contracts).

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0654: 0654 2 11 Midblock Crosswalk: Rectangular Rapid Flashing Beacon, Furnish & Install- AC, Complete Sign Assembly- Single Direction ($11,772.38 per AS, 3 contracts); 0654 2 21 Midblock Crosswalk: Rectangular Rapid Flashing Beacon, Furnish & Install- Solar, Complete Sign Assy- Single Direction ($14,288.83 per AS, 3 contracts); 0654 2 22 Midblock Crosswalk: Rectangular Rapid Flashing Beacon, Furnish & Install- Solar, Complete Sign Assembly- Back TO Back ($11,654.55 per AS, 3 contracts); 0654 2 60 Midblock Crosswalk: Rectangular Rapid Flashing Beacon, Remove Complete Sign Assembly ($743.78 per AS, 2 contracts); 0654 1 10 Midblock Crosswalk: IN Roadway Light Assembly, Furnish & Install- AC Powered, Complete Crossing ($57,000.00 per AS, 1 contracts).

Related items in section 0654

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.