Removable Tape, Yellow, Solid, 6" (Item 0102913 31): FDOT Unit Price History
29 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure GM
- Weighted average (12 mo)
- $11,708.40/GM
- Contracts (12 mo)
- 29
- Total quantity (12 mo)
- 15.71 GM
- Total amount (12 mo)
- $183,986
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 37 | $11,390.28 | 68.74 | $782,979 |
| 2025 | 2025-01-01 – 2025-12-31 | 45 | $13,265.49 | 46.17 | $612,441 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 29 | $11,708.40 | 15.71 | $183,986 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 2 | $9,492.63 | -18.9% | 0.73 |
| 03 | 1 | $17,400.36 | +48.6% | 0.06 |
| 04 | 1 | $8,000.00 | -31.7% | 0.29 |
| 05 | 2 | $17,424.24 | +48.8% | 0.4 |
| 06 | 3 | $13,464.82 | +15% | 2.72 |
| 07 | 3 | $14,726.06 | +25.8% | 2.63 |
| 08 | 3 | $13,030.81 | +11.3% | 0.66 |
| 09 | 1 | $19,285.02 | +64.7% | 0.28 |
| 10 | 2 | $8,939.86 | -23.6% | 2.55 |
| 11 | 1 | $19,000.00 | +62.3% | 0.58 |
| 12 | 5 | $12,029.78 | +2.7% | 2.03 |
| 13 | 4 | $17,214.78 | +47% | 1.12 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0102913 31 (Removable Tape, Yellow, Solid, 6") is measured in GM. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 29 contracts with a quantity-weighted average of $11,708.40 per GM, on 15.71 GM worth $183,986 in total.
The same report run for earlier periods shows $11,390.28 in 2024 (37 contracts, 68.74 GM), $13,265.49 in 2025 (45 contracts, 46.17 GM), $11,708.40 in the latest 12 months (29 contracts, 15.71 GM). Across those periods the weighted average stayed within three percent.
Quantity let statewide shrank 77% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
FDOT's market-area reports for the same 12 months show how location moves the price. Among the 5 market areas with at least three contracts, market area 12 had the lowest weighted average ($12,029.78 per GM, 5 contracts) and market area 13 the highest ($17,214.78, 4 contracts), 1.4 times as much. Market area 12 let the most contracts with this item (5). 12 of FDOT's 14 market areas reported the item in this window.
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0102913: 0102913 21 Removable Tape, White, Solid 6" ($11,630.04 per GM, 36 contracts); 0102913 22 Removable Tape, White, 10'-30', 3'-9', 6'-10', OR 2'-4' Skip, 6" Wide ($4,881.64 per GM, 24 contracts); 0102913 23 Removable Tape, White, 24" Stop BAR ($9.54 per LF, 13 contracts); 0102913 24 Removable Tape, White, 12" Crosswalk ($5.85 per LF, 13 contracts); 0102913 12 Removable Tape, Black, 10'-30', 3'-9', 6'-10', OR 2'-4' Skip ($5,415.23 per GM, 12 contracts).
Related items in section 0102913
- 0102913 21 · Removable Tape, White, Solid 6" ($11,630.04/GM)
- 0102913 22 · Removable Tape, White, 10'-30', 3'-9', 6'-10', OR 2'-4' Skip, 6" Wide ($4,881.64/GM)
- 0102913 23 · Removable Tape, White, 24" Stop BAR ($9.54/LF)
- 0102913 24 · Removable Tape, White, 12" Crosswalk ($5.85/LF)
- 0102913 12 · Removable Tape, Black, 10'-30', 3'-9', 6'-10', OR 2'-4' Skip ($5,415.23/GM)
- 0102913 29 · Removable Tape, White, Message, Symbol OR Arrow ($462.45/EA)
- 0102913 32 · Removable Tape, Yellow, 10'-30', 3'-9', 6'-10', OR 2'-4' Skip ($7,916.73/GM)
- 0102913 11 · Removable Tape, Black, Solid 6" ($13,453.52/GM)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.