RC Pipe (CL III)(18 IN) (Item 464-7003): TxDOT Unit Price History

1,982 bids · 325 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure LF

TxDOT 464-7003 · RC PIPE (CL III)(18 IN) · Unit: LF

Low bid
$74.05/LF
Quantity-weighted median of winning unit prices
Weighted median
$75.00/LF
Quantity-weighted median of every bid
Engineer’s estimate
$85.00/LF
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-2.61%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$50.00$100.00$150.00$200.00$250.001101001K10K100KQuantity (LF), log scaleUnit price ($/LF)
Winning (low) bid Other bid Fitted price curve (ln price = 5.14 − 0.107·ln qty, R² 0.16)320 plotted bids, 5 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 464-7003 (RC Pipe (CL III)(18 IN)) is measured in LF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,982 bids for it on 325 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,057 bids was $75.00 per LF, and the winning low bidders priced it at a weighted median of $74.05 per LF.

TxDOT's engineer's estimate for the same lines had a weighted median of $85.00 per LF, so winning bids came in 12.9% below the estimate.

By calendar year, the median bid moved from $91.45 in 2025 (964 bids) to $88.00 in 2026 (980 bids), down 3.8%. The middle half of 2026 bids fell between $68.59 and $120.00.

Comparing the last 12 months with the 12 months before, the median unit price fell 2.61%.

Quantity matters for this item. Lines of 2 to 112 LF had a weighted median of $105.00, while lines above 716 LF had $75.00, a 29% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 311 lines where both a winning and a second-place bid were published, the median winning unit price was $85.00 against $88.00 from the second-lowest bidder, a median gap of 1.18% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 21 TxDOT districts with at least ten bids, Tyler had the lowest weighted median ($58.00) and San Angelo the highest ($210.22). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 4, 2026 in Collin County, where Mario Sinacola & Sons Excavating, Inc. was the low bidder at $90.00 per LF for 748 LF against an estimate of $65.00.

13 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 464-7005 RC Pipe (CL III)(24 IN) (weighted median $97.64 per LF); 464-7007 RC Pipe (CL III)(30 IN) (weighted median $123.90 per LF); 464-7009 RC Pipe (CL III)(36 IN) (weighted median $161.00 per LF); 467-7308 SET (TY II) (18 IN) (RCP) (6: 1) (P) (weighted median $1,115.55 per EA).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
2024387$111.03$105.00$105.50$95.25$146.50
2025964163$88.59$80.00$91.45$72.00$120.00
2026980156$84.95$75.00$88.00$68.59$120.00

Quantity bands

BandQuantity (LF)BidsWeighted avgWeighted median25th–75th pct
Small2–112663$124.91$105.00$85.00–$150.00
Medium115–713659$100.21$87.00$70.00–$120.00
Large716–12,426660$84.01$75.00$63.00–$97.70

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$85.00
Median second-low unit price
$88.00
Median engineer’s estimate
$95.00
Median gap, second vs. low
+1.18%

311 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District

Line quantity 748 LF · Engineer’s estimate $65.00/LF

  • Unit price
    $90.00/LF
    Extension
    $67,320.00
    Proposal total
    $35,766,135
    Money left on the table
    $890,797 (2.49%)
    vs. engineer’s estimate
    +38.5%
  • Unit price
    $60.00/LF
    Extension
    $44,880.00
    Proposal total
    $36,656,931
    vs. low bid
    +$890,797
    vs. engineer’s estimate
    -7.7%
  • 3. Tiseo Paving Company, LLC

    Unit price
    $95.00/LF
    Extension
    $71,060.00
    Proposal total
    $38,169,956
    vs. low bid
    +$2,403,821
    vs. engineer’s estimate
    +46.2%
  • 4. Harper Brothers Construction LLC

    Unit price
    $125.00/LF
    Extension
    $93,500.00
    Proposal total
    $40,441,503
    vs. low bid
    +$4,675,368
    vs. engineer’s estimate
    +92.3%

Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District

Line quantity 464 LF · Engineer’s estimate $70.00/LF

  • 1. Fluor Enterprises, Inc.

    LOW BID · WINNER
    Unit price
    $80.50/LF
    Extension
    $37,352.00
    Proposal total
    $30,209,876
    Money left on the table
    $2,977,718 (9.86%)
    vs. engineer’s estimate
    +15%
  • Unit price
    $72.00/LF
    Extension
    $33,408.00
    Proposal total
    $33,187,594
    vs. low bid
    +$2,977,718
    vs. engineer’s estimate
    +2.9%
  • Unit price
    $50.00/LF
    Extension
    $23,200.00
    Proposal total
    $33,911,798
    vs. low bid
    +$3,701,922
    vs. engineer’s estimate
    -28.6%
  • Unit price
    $70.00/LF
    Extension
    $32,480.00
    Proposal total
    $34,862,676
    vs. low bid
    +$4,652,800
    vs. engineer’s estimate
    0%
  • Unit price
    $98.22/LF
    Extension
    $45,574.08
    Proposal total
    $39,237,828
    vs. low bid
    +$9,027,952
    vs. engineer’s estimate
    +40.3%
  • Unit price
    $80.00/LF
    Extension
    $37,120.00
    Proposal total
    $39,562,405
    vs. low bid
    +$9,352,529
    vs. engineer’s estimate
    +14.3%
  • Unit price
    $83.00/LF
    Extension
    $38,512.00
    Proposal total
    $39,630,699
    vs. low bid
    +$9,420,823
    vs. engineer’s estimate
    +18.6%
  • Unit price
    $90.00/LF
    Extension
    $41,760.00
    Proposal total
    $39,994,995
    vs. low bid
    +$9,785,119
    vs. engineer’s estimate
    +28.6%
  • 9. Zachry Construction Corporation

    Unit price
    $94.09/LF
    Extension
    $43,657.76
    Proposal total
    $42,444,061
    vs. low bid
    +$12,234,185
    vs. engineer’s estimate
    +34.4%
  • 10. Brizo Construction, LLC

    Unit price
    $88.00/LF
    Extension
    $40,832.00
    Proposal total
    $43,708,350
    vs. low bid
    +$13,498,474
    vs. engineer’s estimate
    +25.7%
  • Unit price
    $100.15/LF
    Extension
    $46,469.60
    Proposal total
    $44,387,970
    vs. low bid
    +$14,178,094
    vs. engineer’s estimate
    +43.1%
  • Unit price
    $162.00/LF
    Extension
    $75,168.00
    Proposal total
    $48,396,973
    vs. low bid
    +$18,187,097
    vs. engineer’s estimate
    +131.4%

Proposal 0262-01-034 · let Nov 4, 2026 · Milam County, Bryan District

Line quantity 1,060 LF · Engineer’s estimate $72.00/LF

  • 1. Big Creek Construction, Ltd.

    LOW BID · WINNER
    Unit price
    $55.00/LF
    Extension
    $58,300.00
    Proposal total
    $9,787,627
    Money left on the table
    $395,153 (4.04%)
    vs. engineer’s estimate
    -23.6%
  • Unit price
    $71.00/LF
    Extension
    $75,260.00
    Proposal total
    $10,182,780
    vs. low bid
    +$395,153
    vs. engineer’s estimate
    -1.4%
  • Unit price
    $49.00/LF
    Extension
    $51,940.00
    Proposal total
    $10,424,591
    vs. low bid
    +$636,964
    vs. engineer’s estimate
    -31.9%
  • Unit price
    $50.00/LF
    Extension
    $53,000.00
    Proposal total
    $12,020,138
    vs. low bid
    +$2,232,511
    vs. engineer’s estimate
    -30.6%
  • Unit price
    $72.00/LF
    Extension
    $76,320.00
    Proposal total
    $12,374,454
    vs. low bid
    +$2,586,827
    vs. engineer’s estimate
    0%
  • 6. Patin Construction LLC

    Unit price
    $75.00/LF
    Extension
    $79,500.00
    Proposal total
    $15,629,317
    vs. low bid
    +$5,841,690
    vs. engineer’s estimate
    +4.2%
  • 7. Joe Bland Construction LLC

    Unit price
    $115.00/LF
    Extension
    $121,900.00
    Proposal total
    $18,492,861
    vs. low bid
    +$8,705,235
    vs. engineer’s estimate
    +59.7%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040047-04-032CollinDallas7484Mario Sinacola & Sons Excavating, Inc.$90.00$65.00
2026-11-040212-03-058BrazosBryan46412Fluor Enterprises, Inc.$80.50$70.00
2026-11-040262-01-034MilamBryan1,0607Big Creek Construction, Ltd.$55.00$72.00
2026-11-040947-03-034JasperBeaumont2682Texas Materials Group, Inc.$71.50$60.00
2026-11-041017-03-040HuntParis2,5729Highway 19 Construction LLC$53.00$42.00
2026-11-041052-02-098NuecesCorpus Christi885J E Construction Services, LLC$84.00$100.00
2026-11-030015-13-432TravisAustin10,8756Austin Bridge & Road Services, LP$216.40$85.00
2026-10-070143-03-049WilsonSan Antonio1,5878Hunter Industries, Ltd.$76.24$100.00
2026-10-070200-01-093AngelinaLufkin4657Longview Bridge and Road, Ltd.$57.00$59.00
2026-10-070510-06-024FanninParis3,8946A. K. Gillis & Sons, LLC$50.00$50.00

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene15$106.40$80.00$88.00—
Amarillo18$145.00$130.00$130.00—
Atlanta90$53.75$60.00$58.00-4.92%
Austin174$216.40$118.47$85.00-6.28%
Beaumont46$84.00$132.00$95.00+50%
Brownwood7$200.00$161.25$144.00—
Bryan158$80.00$75.00$72.00-5.29%
Corpus Christi65$80.00$78.00$85.00-4.37%
Dallas305$64.00$75.00$70.00+7.25%
El Paso2$175.00$187.50$90.00—
Fort Worth65$100.00$90.00$110.00+10.98%
Houston62$95.00$95.00$95.00-17.04%
Laredo22$144.40$95.74$100.00—
Lubbock6—$135.00——
Lufkin101$80.00$69.00$75.00-20.87%
Odessa19$110.00$100.72$150.00—
Paris151$53.00$60.00$50.00-11.26%
Pharr122$80.00$85.00$100.00-20.04%
San Angelo11$210.22$210.22$105.00—
San Antonio97$100.00$105.00$90.00-28.91%
Tyler121$50.00$58.00$55.00-15.03%
Waco47$75.00$83.50$100.00—
Wichita Falls59$79.00$79.00$81.74-5.2%
Yoakum219$80.00$98.45$100.00+2.49%

Related items

Is your price for item 464-7003 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.