SET (TY II) (18 IN) (RCP) (6: 1) (P) (Item 467-7308): TxDOT Unit Price History
1,566 bids · 250 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure EA
TxDOT 467-7308 · SET (TY II) (18 IN) (RCP) (6: 1) (P) · Unit: EA
- Low bid
- $1,050.00/EA
- Quantity-weighted median of winning unit prices
- Weighted median
- $1,115.55/EA
- Quantity-weighted median of every bid
- Engineer’s estimate
- $1,200.00/EA
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -2.45%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 467-7308 (SET (TY II) (18 IN) (RCP) (6: 1) (P)) is measured in EA. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,566 bids for it on 250 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 808 bids was $1,115.55 per EA, and the winning low bidders priced it at a weighted median of $1,050.00 per EA.
TxDOT's engineer's estimate for the same lines had a weighted median of $1,200.00 per EA, so winning bids came in 12.5% below the estimate.
By calendar year, the median bid moved from $1,500.00 in 2025 (784 bids) to $1,470.75 in 2026 (754 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $1,017.76 and $2,100.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 2.45%.
Quantity matters for this item. Lines of 1 to 6 EA had a weighted median of $1,850.00, while lines above 40 EA had $1,060.00, a 43% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 248 lines where both a winning and a second-place bid were published, the median winning unit price was $1,352.84 against $1,365.00 from the second-lowest bidder, a median gap of 3.96% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 20 TxDOT districts with at least ten bids, Paris had the lowest weighted median ($800.00) and Amarillo the highest ($3,000.60). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 4, 2026 in Brazos County, where Fluor Enterprises, Inc. was the low bidder at $2,117.00 per EA for 20 EA against an estimate of $1,300.00.
Related items: 467-7328 SET (TY II) (24 IN) (RCP) (6: 1) (P) (weighted median $1,900.00 per EA); 464-7005 RC Pipe (CL III)(24 IN) (weighted median $97.64 per LF); 464-7003 RC Pipe (CL III)(18 IN) (weighted median $75.00 per LF); 464-7007 RC Pipe (CL III)(30 IN) (weighted median $123.90 per LF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 28 | 5 | $1,586.41 | $1,500.00 | $1,750.00 | $1,355.00 | $2,170.44 |
| 2025 | 784 | 127 | $1,300.99 | $1,100.00 | $1,500.00 | $1,090.63 | $2,075.74 |
| 2026 | 754 | 118 | $1,308.42 | $1,115.00 | $1,470.75 | $1,017.76 | $2,100.00 |
Quantity bands
| Band | Quantity (EA) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 1–6 | 558 | $2,065.23 | $1,850.00 | $1,400.00–$2,571.25 |
| Medium | 7–38 | 489 | $1,563.28 | $1,370.00 | $1,050.00–$2,000.00 |
| Large | 40–504 | 519 | $1,248.68 | $1,060.00 | $950.00–$1,540.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $1,352.84
- Median second-low unit price
- $1,365.00
- Median engineer’s estimate
- $1,400.00
- Median gap, second vs. low
- +3.96%
248 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District
Line quantity 20 EA · Engineer’s estimate $1,300/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Fluor Enterprises, Inc.LOW BID | $2,117.00/EA | $42,340.00 | — | +62.8% | $30,209,876 | $2,977,718 (9.86%) left on table |
| 2 | Big Creek Construction, Ltd. | $1,650.00/EA | $33,000.00 | -$9,340 | +26.9% | $33,187,594 | +$2,977,718 |
| 3 | Knife River Corporation - South | $1,485.00/EA | $29,700.00 | -$12,640 | +14.2% | $33,911,798 | +$3,701,922 |
| 4 | R Construction Civil, LLC | $2,000.00/EA | $40,000.00 | -$2,340 | +53.8% | $34,862,676 | +$4,652,800 |
| 5 | James Construction Group, LLC | $2,324.98/EA | $46,499.60 | +$4,160 | +78.8% | $39,237,828 | +$9,027,952 |
| 6 | Texas Materials Group, Inc. | $2,500.00/EA | $50,000.00 | +$7,660 | +92.3% | $39,562,405 | +$9,352,529 |
| 7 | A. L. Helmcamp, Inc. | $800.00/EA | $16,000.00 | -$26,340 | -38.5% | $39,630,699 | +$9,420,823 |
| 8 | Posillico Civil, Inc. | $885.00/EA | $17,700.00 | -$24,640 | -31.9% | $39,994,995 | +$9,785,119 |
| 9 | Zachry Construction Corporation | $2,415.17/EA | $48,303.40 | +$5,963 | +85.8% | $42,444,061 | +$12,234,185 |
| 10 | Brizo Construction, LLC | $2,200.00/EA | $44,000.00 | +$1,660 | +69.2% | $43,708,350 | +$13,498,474 |
| 11 | Granite Construction Company | $1,255.00/EA | $25,100.00 | -$17,240 | -3.5% | $44,387,970 | +$14,178,094 |
| 12 | Isi Contracting, Inc. | $3,350.00/EA | $67,000.00 | +$24,660 | +157.7% | $48,396,973 | +$18,187,097 |
1. Fluor Enterprises, Inc.
LOW BID · WINNER- Unit price
- $2,117.00/EA
- Extension
- $42,340.00
- Proposal total
- $30,209,876
- Money left on the table
- $2,977,718 (9.86%)
- vs. engineer’s estimate
- +62.8%
- Unit price
- $1,650.00/EA
- Extension
- $33,000.00
- Proposal total
- $33,187,594
- vs. low bid
- +$2,977,718
- vs. engineer’s estimate
- +26.9%
- Unit price
- $1,485.00/EA
- Extension
- $29,700.00
- Proposal total
- $33,911,798
- vs. low bid
- +$3,701,922
- vs. engineer’s estimate
- +14.2%
- Unit price
- $2,000.00/EA
- Extension
- $40,000.00
- Proposal total
- $34,862,676
- vs. low bid
- +$4,652,800
- vs. engineer’s estimate
- +53.8%
- Unit price
- $2,324.98/EA
- Extension
- $46,499.60
- Proposal total
- $39,237,828
- vs. low bid
- +$9,027,952
- vs. engineer’s estimate
- +78.8%
- Unit price
- $2,500.00/EA
- Extension
- $50,000.00
- Proposal total
- $39,562,405
- vs. low bid
- +$9,352,529
- vs. engineer’s estimate
- +92.3%
- Unit price
- $800.00/EA
- Extension
- $16,000.00
- Proposal total
- $39,630,699
- vs. low bid
- +$9,420,823
- vs. engineer’s estimate
- -38.5%
- Unit price
- $885.00/EA
- Extension
- $17,700.00
- Proposal total
- $39,994,995
- vs. low bid
- +$9,785,119
- vs. engineer’s estimate
- -31.9%
9. Zachry Construction Corporation
- Unit price
- $2,415.17/EA
- Extension
- $48,303.40
- Proposal total
- $42,444,061
- vs. low bid
- +$12,234,185
- vs. engineer’s estimate
- +85.8%
10. Brizo Construction, LLC
- Unit price
- $2,200.00/EA
- Extension
- $44,000.00
- Proposal total
- $43,708,350
- vs. low bid
- +$13,498,474
- vs. engineer’s estimate
- +69.2%
- Unit price
- $1,255.00/EA
- Extension
- $25,100.00
- Proposal total
- $44,387,970
- vs. low bid
- +$14,178,094
- vs. engineer’s estimate
- -3.5%
- Unit price
- $3,350.00/EA
- Extension
- $67,000.00
- Proposal total
- $48,396,973
- vs. low bid
- +$18,187,097
- vs. engineer’s estimate
- +157.7%
Proposal 0262-01-034 · let Nov 4, 2026 · Milam County, Bryan District
Line quantity 64 EA · Engineer’s estimate $1,150/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Big Creek Construction, Ltd.LOW BID | $1,000.00/EA | $64,000.00 | — | -13% | $9,787,627 | $395,153 (4.04%) left on table |
| 2 | Larry Young Paving, Inc. | $1,300.00/EA | $83,200.00 | +$19,200 | +13% | $10,182,780 | +$395,153 |
| 3 | Knife River Corporation - South | $1,971.00/EA | $126,144.00 | +$62,144 | +71.4% | $10,424,591 | +$636,964 |
| 4 | Texas Materials Group, Inc. | $850.00/EA | $54,400.00 | -$9,600 | -26.1% | $12,020,138 | +$2,232,511 |
| 5 | A. L. Helmcamp, Inc. | $2,000.00/EA | $128,000.00 | +$64,000 | +73.9% | $12,374,454 | +$2,586,827 |
| 6 | Patin Construction LLC | $2,000.00/EA | $128,000.00 | +$64,000 | +73.9% | $15,629,317 | +$5,841,690 |
| 7 | Joe Bland Construction LLC | $2,750.00/EA | $176,000.00 | +$112,000 | +139.1% | $18,492,861 | +$8,705,235 |
1. Big Creek Construction, Ltd.
LOW BID · WINNER- Unit price
- $1,000.00/EA
- Extension
- $64,000.00
- Proposal total
- $9,787,627
- Money left on the table
- $395,153 (4.04%)
- vs. engineer’s estimate
- -13%
- Unit price
- $1,300.00/EA
- Extension
- $83,200.00
- Proposal total
- $10,182,780
- vs. low bid
- +$395,153
- vs. engineer’s estimate
- +13%
- Unit price
- $1,971.00/EA
- Extension
- $126,144.00
- Proposal total
- $10,424,591
- vs. low bid
- +$636,964
- vs. engineer’s estimate
- +71.4%
- Unit price
- $850.00/EA
- Extension
- $54,400.00
- Proposal total
- $12,020,138
- vs. low bid
- +$2,232,511
- vs. engineer’s estimate
- -26.1%
- Unit price
- $2,000.00/EA
- Extension
- $128,000.00
- Proposal total
- $12,374,454
- vs. low bid
- +$2,586,827
- vs. engineer’s estimate
- +73.9%
6. Patin Construction LLC
- Unit price
- $2,000.00/EA
- Extension
- $128,000.00
- Proposal total
- $15,629,317
- vs. low bid
- +$5,841,690
- vs. engineer’s estimate
- +73.9%
7. Joe Bland Construction LLC
- Unit price
- $2,750.00/EA
- Extension
- $176,000.00
- Proposal total
- $18,492,861
- vs. low bid
- +$8,705,235
- vs. engineer’s estimate
- +139.1%
Proposal 0353-01-031 · let Nov 4, 2026 · Wise County, Fort Worth District
Line quantity 1 EA · Engineer’s estimate $3,100/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Xit Paving and Construction Inc.LOW BID | $2,105.00/EA | $2,105.00 | — | -32.1% | $482,224 | $101,735 (21.1%) left on table |
| 2 | Ed Bell Construction Company | $2,000.00/EA | $2,000.00 | -$105.00 | -35.5% | $583,959 | +$101,735 |
| 3 | O. Trevino Construction, LLC | $2,800.00/EA | $2,800.00 | +$695.00 | -9.7% | $594,655 | +$112,431 |
| 4 | Jay Mills Contracting, Incorporated | $1,800.00/EA | $1,800.00 | -$305.00 | -41.9% | $607,976 | +$125,752 |
| 5 | Silver Creek Construction, Inc. | $3,500.00/EA | $3,500.00 | +$1,395 | +12.9% | $649,060 | +$166,836 |
| 6 | Jagoe-Public Company | $2,100.00/EA | $2,100.00 | -$5.00 | -32.3% | $701,946 | +$219,722 |
| 7 | Overland Corporation | $1,230.00/EA | $1,230.00 | -$875.00 | -60.3% | $771,411 | +$289,187 |
1. Xit Paving and Construction Inc.
LOW BID · WINNER- Unit price
- $2,105.00/EA
- Extension
- $2,105.00
- Proposal total
- $482,224
- Money left on the table
- $101,735 (21.1%)
- vs. engineer’s estimate
- -32.1%
- Unit price
- $2,000.00/EA
- Extension
- $2,000.00
- Proposal total
- $583,959
- vs. low bid
- +$101,735
- vs. engineer’s estimate
- -35.5%
- Unit price
- $2,800.00/EA
- Extension
- $2,800.00
- Proposal total
- $594,655
- vs. low bid
- +$112,431
- vs. engineer’s estimate
- -9.7%
4. Jay Mills Contracting, Incorporated
- Unit price
- $1,800.00/EA
- Extension
- $1,800.00
- Proposal total
- $607,976
- vs. low bid
- +$125,752
- vs. engineer’s estimate
- -41.9%
5. Silver Creek Construction, Inc.
- Unit price
- $3,500.00/EA
- Extension
- $3,500.00
- Proposal total
- $649,060
- vs. low bid
- +$166,836
- vs. engineer’s estimate
- +12.9%
- Unit price
- $2,100.00/EA
- Extension
- $2,100.00
- Proposal total
- $701,946
- vs. low bid
- +$219,722
- vs. engineer’s estimate
- -32.3%
7. Overland Corporation
- Unit price
- $1,230.00/EA
- Extension
- $1,230.00
- Proposal total
- $771,411
- vs. low bid
- +$289,187
- vs. engineer’s estimate
- -60.3%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0212-03-058 | Brazos | Bryan | 20 | 12 | Fluor Enterprises, Inc. | $2,117.00 | $1,300.00 |
| 2026-11-04 | 0262-01-034 | Milam | Bryan | 64 | 7 | Big Creek Construction, Ltd. | $1,000.00 | $1,150.00 |
| 2026-11-04 | 0353-01-031 | Wise | Fort Worth | 1 | 7 | Xit Paving and Construction Inc. | $2,105.00 | $3,100.00 |
| 2026-11-04 | 0947-03-034 | Jasper | Beaumont | 78 | 2 | Texas Materials Group, Inc. | $990.00 | $1,200.00 |
| 2026-11-04 | 1017-03-040 | Hunt | Paris | 191 | 9 | Highway 19 Construction LLC | $795.00 | $650.00 |
| 2026-10-07 | 0143-03-049 | Wilson | San Antonio | 70 | 8 | Hunter Industries, Ltd. | $1,681.87 | $1,500.00 |
| 2026-10-07 | 0200-01-093 | Angelina | Lufkin | 24 | 7 | Longview Bridge and Road, Ltd. | $950.00 | $1,200.00 |
| 2026-10-07 | 0510-06-024 | Fannin | Paris | 265 | 6 | A. K. Gillis & Sons, LLC | $750.00 | $750.00 |
| 2026-10-07 | 6506-33-001 | Jasper | Beaumont | 6 | 2 | Texas Drainage Inc. | $1,999.00 | $1,300.00 |
| 2026-10-06 | 0387-01-016 | Collin | Dallas | 44 | 8 | A. K. Gillis & Sons, LLC | $750.00 | $1,000.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 18 | $1,325.00 | $1,500.00 | $1,500.00 | — |
| Amarillo | 10 | $6,675.00 | $3,000.60 | $1,630.00 | — |
| Atlanta | 80 | $700.00 | $940.00 | $1,100.00 | -2.15% |
| Austin | 136 | $1,050.00 | $1,742.33 | $1,700.00 | -12.34% |
| Beaumont | 36 | $990.00 | $1,180.00 | $1,200.00 | +8.8% |
| Bryan | 124 | $1,500.00 | $1,500.00 | $1,150.00 | +0.84% |
| Corpus Christi | 50 | $1,500.00 | $1,500.00 | $1,500.00 | -18.14% |
| Dallas | 217 | $775.00 | $957.45 | $1,150.00 | +3.35% |
| El Paso | 2 | $3,000.00 | $5,500.00 | $1,450.00 | — |
| Fort Worth | 61 | $1,430.00 | $1,400.00 | $1,750.00 | — |
| Houston | 44 | $1,500.00 | $2,500.00 | $3,558.33 | — |
| Laredo | 13 | $3,250.08 | $2,400.00 | $1,500.00 | — |
| Lubbock | 5 | $1,700.00 | $1,969.69 | $1,700.00 | — |
| Lufkin | 94 | $1,015.00 | $927.00 | $1,100.00 | -23.14% |
| Odessa | 28 | $2,079.76 | $1,973.41 | $2,600.00 | +17.12% |
| Paris | 129 | $795.00 | $800.00 | $750.00 | 0% |
| Pharr | 76 | $1,120.00 | $1,300.00 | $1,200.00 | -14.31% |
| San Antonio | 67 | $1,681.87 | $1,681.87 | $1,500.00 | -26.29% |
| Tyler | 118 | $997.50 | $1,000.00 | $1,000.00 | -5.45% |
| Waco | 53 | $1,530.00 | $1,350.00 | $1,250.00 | +32.36% |
| Wichita Falls | 48 | $1,400.00 | $1,295.00 | $1,200.00 | +16.74% |
| Yoakum | 157 | $1,800.00 | $2,100.00 | $2,000.00 | +3.13% |
Related items
- 467-7328 · SET (TY II) (24 IN) (RCP) (6: 1) (P) ($1,900.00/EA)
- 464-7005 · RC Pipe (CL III)(24 IN) ($97.64/LF)
- 464-7003 · RC Pipe (CL III)(18 IN) ($75.00/LF)
- 464-7007 · RC Pipe (CL III)(30 IN) ($123.90/LF)
- 464-7009 · RC Pipe (CL III)(36 IN) ($161.00/LF)
- 480-7001 · Clean Exist Culverts ($2,000.00/EA)
- 496-7007 · Remov STR (Pipe) ($21.40/LF)
- 496-7004 · Remov STR (SET) ($450.00/EA)