SET (TY II) (18 IN) (RCP) (6: 1) (P) (Item 467-7308): TxDOT Unit Price History

1,566 bids · 250 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure EA

TxDOT 467-7308 · SET (TY II) (18 IN) (RCP) (6: 1) (P) · Unit: EA

Low bid
$1,050.00/EA
Quantity-weighted median of winning unit prices
Weighted median
$1,115.55/EA
Quantity-weighted median of every bid
Engineer’s estimate
$1,200.00/EA
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-2.45%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$1,000.00$2,000.00$3,000.001101001KQuantity (EA), log scaleUnit price ($/EA)
Winning (low) bid Other bid Fitted price curve (ln price = 7.58 − 0.108·ln qty, R² 0.16)320 plotted bids, 2 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 467-7308 (SET (TY II) (18 IN) (RCP) (6: 1) (P)) is measured in EA. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,566 bids for it on 250 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 808 bids was $1,115.55 per EA, and the winning low bidders priced it at a weighted median of $1,050.00 per EA.

TxDOT's engineer's estimate for the same lines had a weighted median of $1,200.00 per EA, so winning bids came in 12.5% below the estimate.

By calendar year, the median bid moved from $1,500.00 in 2025 (784 bids) to $1,470.75 in 2026 (754 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $1,017.76 and $2,100.00.

Comparing the last 12 months with the 12 months before, the median unit price fell 2.45%.

Quantity matters for this item. Lines of 1 to 6 EA had a weighted median of $1,850.00, while lines above 40 EA had $1,060.00, a 43% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 248 lines where both a winning and a second-place bid were published, the median winning unit price was $1,352.84 against $1,365.00 from the second-lowest bidder, a median gap of 3.96% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 20 TxDOT districts with at least ten bids, Paris had the lowest weighted median ($800.00) and Amarillo the highest ($3,000.60). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 4, 2026 in Brazos County, where Fluor Enterprises, Inc. was the low bidder at $2,117.00 per EA for 20 EA against an estimate of $1,300.00.

Related items: 467-7328 SET (TY II) (24 IN) (RCP) (6: 1) (P) (weighted median $1,900.00 per EA); 464-7005 RC Pipe (CL III)(24 IN) (weighted median $97.64 per LF); 464-7003 RC Pipe (CL III)(18 IN) (weighted median $75.00 per LF); 464-7007 RC Pipe (CL III)(30 IN) (weighted median $123.90 per LF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
2024285$1,586.41$1,500.00$1,750.00$1,355.00$2,170.44
2025784127$1,300.99$1,100.00$1,500.00$1,090.63$2,075.74
2026754118$1,308.42$1,115.00$1,470.75$1,017.76$2,100.00

Quantity bands

BandQuantity (EA)BidsWeighted avgWeighted median25th–75th pct
Small1–6558$2,065.23$1,850.00$1,400.00–$2,571.25
Medium7–38489$1,563.28$1,370.00$1,050.00–$2,000.00
Large40–504519$1,248.68$1,060.00$950.00–$1,540.00

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$1,352.84
Median second-low unit price
$1,365.00
Median engineer’s estimate
$1,400.00
Median gap, second vs. low
+3.96%

248 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District

Line quantity 20 EA · Engineer’s estimate $1,300/EA

  • 1. Fluor Enterprises, Inc.

    LOW BID · WINNER
    Unit price
    $2,117.00/EA
    Extension
    $42,340.00
    Proposal total
    $30,209,876
    Money left on the table
    $2,977,718 (9.86%)
    vs. engineer’s estimate
    +62.8%
  • Unit price
    $1,650.00/EA
    Extension
    $33,000.00
    Proposal total
    $33,187,594
    vs. low bid
    +$2,977,718
    vs. engineer’s estimate
    +26.9%
  • Unit price
    $1,485.00/EA
    Extension
    $29,700.00
    Proposal total
    $33,911,798
    vs. low bid
    +$3,701,922
    vs. engineer’s estimate
    +14.2%
  • Unit price
    $2,000.00/EA
    Extension
    $40,000.00
    Proposal total
    $34,862,676
    vs. low bid
    +$4,652,800
    vs. engineer’s estimate
    +53.8%
  • Unit price
    $2,324.98/EA
    Extension
    $46,499.60
    Proposal total
    $39,237,828
    vs. low bid
    +$9,027,952
    vs. engineer’s estimate
    +78.8%
  • Unit price
    $2,500.00/EA
    Extension
    $50,000.00
    Proposal total
    $39,562,405
    vs. low bid
    +$9,352,529
    vs. engineer’s estimate
    +92.3%
  • Unit price
    $800.00/EA
    Extension
    $16,000.00
    Proposal total
    $39,630,699
    vs. low bid
    +$9,420,823
    vs. engineer’s estimate
    -38.5%
  • Unit price
    $885.00/EA
    Extension
    $17,700.00
    Proposal total
    $39,994,995
    vs. low bid
    +$9,785,119
    vs. engineer’s estimate
    -31.9%
  • 9. Zachry Construction Corporation

    Unit price
    $2,415.17/EA
    Extension
    $48,303.40
    Proposal total
    $42,444,061
    vs. low bid
    +$12,234,185
    vs. engineer’s estimate
    +85.8%
  • 10. Brizo Construction, LLC

    Unit price
    $2,200.00/EA
    Extension
    $44,000.00
    Proposal total
    $43,708,350
    vs. low bid
    +$13,498,474
    vs. engineer’s estimate
    +69.2%
  • Unit price
    $1,255.00/EA
    Extension
    $25,100.00
    Proposal total
    $44,387,970
    vs. low bid
    +$14,178,094
    vs. engineer’s estimate
    -3.5%
  • Unit price
    $3,350.00/EA
    Extension
    $67,000.00
    Proposal total
    $48,396,973
    vs. low bid
    +$18,187,097
    vs. engineer’s estimate
    +157.7%

Proposal 0262-01-034 · let Nov 4, 2026 · Milam County, Bryan District

Line quantity 64 EA · Engineer’s estimate $1,150/EA

  • 1. Big Creek Construction, Ltd.

    LOW BID · WINNER
    Unit price
    $1,000.00/EA
    Extension
    $64,000.00
    Proposal total
    $9,787,627
    Money left on the table
    $395,153 (4.04%)
    vs. engineer’s estimate
    -13%
  • Unit price
    $1,300.00/EA
    Extension
    $83,200.00
    Proposal total
    $10,182,780
    vs. low bid
    +$395,153
    vs. engineer’s estimate
    +13%
  • Unit price
    $1,971.00/EA
    Extension
    $126,144.00
    Proposal total
    $10,424,591
    vs. low bid
    +$636,964
    vs. engineer’s estimate
    +71.4%
  • Unit price
    $850.00/EA
    Extension
    $54,400.00
    Proposal total
    $12,020,138
    vs. low bid
    +$2,232,511
    vs. engineer’s estimate
    -26.1%
  • Unit price
    $2,000.00/EA
    Extension
    $128,000.00
    Proposal total
    $12,374,454
    vs. low bid
    +$2,586,827
    vs. engineer’s estimate
    +73.9%
  • 6. Patin Construction LLC

    Unit price
    $2,000.00/EA
    Extension
    $128,000.00
    Proposal total
    $15,629,317
    vs. low bid
    +$5,841,690
    vs. engineer’s estimate
    +73.9%
  • 7. Joe Bland Construction LLC

    Unit price
    $2,750.00/EA
    Extension
    $176,000.00
    Proposal total
    $18,492,861
    vs. low bid
    +$8,705,235
    vs. engineer’s estimate
    +139.1%

Proposal 0353-01-031 · let Nov 4, 2026 · Wise County, Fort Worth District

Line quantity 1 EA · Engineer’s estimate $3,100/EA

  • Unit price
    $2,105.00/EA
    Extension
    $2,105.00
    Proposal total
    $482,224
    Money left on the table
    $101,735 (21.1%)
    vs. engineer’s estimate
    -32.1%
  • Unit price
    $2,000.00/EA
    Extension
    $2,000.00
    Proposal total
    $583,959
    vs. low bid
    +$101,735
    vs. engineer’s estimate
    -35.5%
  • Unit price
    $2,800.00/EA
    Extension
    $2,800.00
    Proposal total
    $594,655
    vs. low bid
    +$112,431
    vs. engineer’s estimate
    -9.7%
  • 4. Jay Mills Contracting, Incorporated

    Unit price
    $1,800.00/EA
    Extension
    $1,800.00
    Proposal total
    $607,976
    vs. low bid
    +$125,752
    vs. engineer’s estimate
    -41.9%
  • 5. Silver Creek Construction, Inc.

    Unit price
    $3,500.00/EA
    Extension
    $3,500.00
    Proposal total
    $649,060
    vs. low bid
    +$166,836
    vs. engineer’s estimate
    +12.9%
  • Unit price
    $2,100.00/EA
    Extension
    $2,100.00
    Proposal total
    $701,946
    vs. low bid
    +$219,722
    vs. engineer’s estimate
    -32.3%
  • 7. Overland Corporation

    Unit price
    $1,230.00/EA
    Extension
    $1,230.00
    Proposal total
    $771,411
    vs. low bid
    +$289,187
    vs. engineer’s estimate
    -60.3%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040212-03-058BrazosBryan2012Fluor Enterprises, Inc.$2,117.00$1,300.00
2026-11-040262-01-034MilamBryan647Big Creek Construction, Ltd.$1,000.00$1,150.00
2026-11-040353-01-031WiseFort Worth17Xit Paving and Construction Inc.$2,105.00$3,100.00
2026-11-040947-03-034JasperBeaumont782Texas Materials Group, Inc.$990.00$1,200.00
2026-11-041017-03-040HuntParis1919Highway 19 Construction LLC$795.00$650.00
2026-10-070143-03-049WilsonSan Antonio708Hunter Industries, Ltd.$1,681.87$1,500.00
2026-10-070200-01-093AngelinaLufkin247Longview Bridge and Road, Ltd.$950.00$1,200.00
2026-10-070510-06-024FanninParis2656A. K. Gillis & Sons, LLC$750.00$750.00
2026-10-076506-33-001JasperBeaumont62Texas Drainage Inc.$1,999.00$1,300.00
2026-10-060387-01-016CollinDallas448A. K. Gillis & Sons, LLC$750.00$1,000.00

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene18$1,325.00$1,500.00$1,500.00—
Amarillo10$6,675.00$3,000.60$1,630.00—
Atlanta80$700.00$940.00$1,100.00-2.15%
Austin136$1,050.00$1,742.33$1,700.00-12.34%
Beaumont36$990.00$1,180.00$1,200.00+8.8%
Bryan124$1,500.00$1,500.00$1,150.00+0.84%
Corpus Christi50$1,500.00$1,500.00$1,500.00-18.14%
Dallas217$775.00$957.45$1,150.00+3.35%
El Paso2$3,000.00$5,500.00$1,450.00—
Fort Worth61$1,430.00$1,400.00$1,750.00—
Houston44$1,500.00$2,500.00$3,558.33—
Laredo13$3,250.08$2,400.00$1,500.00—
Lubbock5$1,700.00$1,969.69$1,700.00—
Lufkin94$1,015.00$927.00$1,100.00-23.14%
Odessa28$2,079.76$1,973.41$2,600.00+17.12%
Paris129$795.00$800.00$750.000%
Pharr76$1,120.00$1,300.00$1,200.00-14.31%
San Antonio67$1,681.87$1,681.87$1,500.00-26.29%
Tyler118$997.50$1,000.00$1,000.00-5.45%
Waco53$1,530.00$1,350.00$1,250.00+32.36%
Wichita Falls48$1,400.00$1,295.00$1,200.00+16.74%
Yoakum157$1,800.00$2,100.00$2,000.00+3.13%

Related items

Is your price for item 467-7308 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.