Clean Exist Culverts (Item 480-7001): TxDOT Unit Price History
1,607 bids · 265 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure EA
TxDOT 480-7001 · CLEAN EXIST CULVERTS · Unit: EA
- Low bid
- $250.00/EA
- Quantity-weighted median of winning unit prices
- Weighted median
- $2,000.00/EA
- Quantity-weighted median of every bid
- Engineer’s estimate
- $1,700.00/EA
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- 0%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 480-7001 (Clean Exist Culverts) is measured in EA. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,607 bids for it on 265 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 765 bids was $2,000.00 per EA, and the winning low bidders priced it at a weighted median of $250.00 per EA.
TxDOT's engineer's estimate for the same lines had a weighted median of $1,700.00 per EA, so winning bids came in 85.3% below the estimate.
By calendar year, the median bid moved from $3,000.00 in 2025 (843 bids) to $2,905.00 in 2026 (727 bids), down 3.2%. The middle half of 2026 bids fell between $1,800.00 and $5,000.00.
Comparing the last 12 months with the 12 months before, the median unit price did not change.
Quantity matters for this item. Lines of 1 to 2 EA had a weighted median of $4,000.00, while lines above 9 EA had $1,500.00, a 63% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 261 lines where both a winning and a second-place bid were published, the median winning unit price was $2,700.00 against $2,750.00 from the second-lowest bidder, a median gap of 6.98% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 24 TxDOT districts with at least ten bids, Paris had the lowest weighted median ($225.00) and El Paso the highest ($12,500.00). The busiest district for this item was San Antonio.
The most recent letting with this item was on Nov 4, 2026 in Milam County, where Big Creek Construction, Ltd. was the low bidder at $1,500.00 per EA for 12 EA against an estimate of $2,000.00.
8 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 467-7308 SET (TY II) (18 IN) (RCP) (6: 1) (P) (weighted median $1,115.55 per EA); 467-7328 SET (TY II) (24 IN) (RCP) (6: 1) (P) (weighted median $1,900.00 per EA); 496-7007 Remov STR (Pipe) (weighted median $21.40 per LF); 464-7005 RC Pipe (CL III)(24 IN) (weighted median $97.64 per LF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 37 | 7 | $1,921.47 | $700.00 | $5,000.00 | $2,100.00 | $10,000.00 |
| 2025 | 843 | 142 | $2,444.76 | $1,500.00 | $3,000.00 | $1,800.00 | $5,000.00 |
| 2026 | 727 | 116 | $3,100.36 | $2,000.00 | $2,905.00 | $1,800.00 | $5,000.00 |
Quantity bands
| Band | Quantity (EA) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 1–2 | 574 | $5,906.74 | $4,000.00 | $2,300.00–$6,000.00 |
| Medium | 3–8 | 515 | $4,260.94 | $3,000.00 | $2,000.00–$5,000.00 |
| Large | 9–300 | 518 | $2,364.46 | $1,500.00 | $1,300.00–$3,500.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $2,700.00
- Median second-low unit price
- $2,750.00
- Median engineer’s estimate
- $3,000.00
- Median gap, second vs. low
- +6.98%
261 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0262-01-034 · let Nov 4, 2026 · Milam County, Bryan District
Line quantity 12 EA · Engineer’s estimate $2,000/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Big Creek Construction, Ltd.LOW BID | $1,500.00/EA | $18,000.00 | — | -25% | $9,787,627 | $395,153 (4.04%) left on table |
| 2 | Larry Young Paving, Inc. | $2,000.00/EA | $24,000.00 | +$6,000 | 0% | $10,182,780 | +$395,153 |
| 3 | Knife River Corporation - South | $2,817.00/EA | $33,804.00 | +$15,804 | +40.8% | $10,424,591 | +$636,964 |
| 4 | Texas Materials Group, Inc. | $1,350.00/EA | $16,200.00 | -$1,800 | -32.5% | $12,020,138 | +$2,232,511 |
| 5 | A. L. Helmcamp, Inc. | $1,900.00/EA | $22,800.00 | +$4,800 | -5% | $12,374,454 | +$2,586,827 |
| 6 | Patin Construction LLC | $500.00/EA | $6,000.00 | -$12,000 | -75% | $15,629,317 | +$5,841,690 |
| 7 | Joe Bland Construction LLC | $2,150.00/EA | $25,800.00 | +$7,800 | +7.5% | $18,492,861 | +$8,705,235 |
1. Big Creek Construction, Ltd.
LOW BID · WINNER- Unit price
- $1,500.00/EA
- Extension
- $18,000.00
- Proposal total
- $9,787,627
- Money left on the table
- $395,153 (4.04%)
- vs. engineer’s estimate
- -25%
- Unit price
- $2,000.00/EA
- Extension
- $24,000.00
- Proposal total
- $10,182,780
- vs. low bid
- +$395,153
- vs. engineer’s estimate
- 0%
- Unit price
- $2,817.00/EA
- Extension
- $33,804.00
- Proposal total
- $10,424,591
- vs. low bid
- +$636,964
- vs. engineer’s estimate
- +40.8%
- Unit price
- $1,350.00/EA
- Extension
- $16,200.00
- Proposal total
- $12,020,138
- vs. low bid
- +$2,232,511
- vs. engineer’s estimate
- -32.5%
- Unit price
- $1,900.00/EA
- Extension
- $22,800.00
- Proposal total
- $12,374,454
- vs. low bid
- +$2,586,827
- vs. engineer’s estimate
- -5%
6. Patin Construction LLC
- Unit price
- $500.00/EA
- Extension
- $6,000.00
- Proposal total
- $15,629,317
- vs. low bid
- +$5,841,690
- vs. engineer’s estimate
- -75%
7. Joe Bland Construction LLC
- Unit price
- $2,150.00/EA
- Extension
- $25,800.00
- Proposal total
- $18,492,861
- vs. low bid
- +$8,705,235
- vs. engineer’s estimate
- +7.5%
Proposal 1017-03-040 · let Nov 4, 2026 · Hunt County, Paris District
Line quantity 1 EA · Engineer’s estimate $800.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Highway 19 Construction LLCLOW BID | $5,000.00/EA | $5,000.00 | — | +525% | $6,803,596 | $438,151 (6.44%) left on table |
| 2 | Thk Construction LLC | $2,000.00/EA | $2,000.00 | -$3,000 | +150% | $7,241,746 | +$438,151 |
| 3 | East Texas Bridge, Inc. | $3,500.00/EA | $3,500.00 | -$1,500 | +337.5% | $7,366,754 | +$563,159 |
| 4 | D. L. Lennon Incorporated - Contractor | $1,200.00/EA | $1,200.00 | -$3,800 | +50% | $7,400,348 | +$596,752 |
| 5 | Rk Hall, LLC | $1,260.00/EA | $1,260.00 | -$3,740 | +57.5% | $7,514,717 | +$711,122 |
| 6 | Austin Bridge & Road Services, LP | $4,000.00/EA | $4,000.00 | -$1,000 | +400% | $7,794,981 | +$991,385 |
| 7 | Texas Materials Group, Inc. | $1,200.00/EA | $1,200.00 | -$3,800 | +50% | $7,795,159 | +$991,563 |
| 8 | Cdm Holdings | $1,500.00/EA | $1,500.00 | -$3,500 | +87.5% | $8,325,506 | +$1,521,910 |
| 9 | Ed Bell Construction Company | $20,000.00/EA | $20,000.00 | +$15,000 | +2,400% | $9,159,173 | +$2,355,578 |
1. Highway 19 Construction LLC
LOW BID · WINNER- Unit price
- $5,000.00/EA
- Extension
- $5,000.00
- Proposal total
- $6,803,596
- Money left on the table
- $438,151 (6.44%)
- vs. engineer’s estimate
- +525%
- Unit price
- $2,000.00/EA
- Extension
- $2,000.00
- Proposal total
- $7,241,746
- vs. low bid
- +$438,151
- vs. engineer’s estimate
- +150%
- Unit price
- $3,500.00/EA
- Extension
- $3,500.00
- Proposal total
- $7,366,754
- vs. low bid
- +$563,159
- vs. engineer’s estimate
- +337.5%
- Unit price
- $1,200.00/EA
- Extension
- $1,200.00
- Proposal total
- $7,400,348
- vs. low bid
- +$596,752
- vs. engineer’s estimate
- +50%
5. Rk Hall, LLC
- Unit price
- $1,260.00/EA
- Extension
- $1,260.00
- Proposal total
- $7,514,717
- vs. low bid
- +$711,122
- vs. engineer’s estimate
- +57.5%
- Unit price
- $4,000.00/EA
- Extension
- $4,000.00
- Proposal total
- $7,794,981
- vs. low bid
- +$991,385
- vs. engineer’s estimate
- +400%
- Unit price
- $1,200.00/EA
- Extension
- $1,200.00
- Proposal total
- $7,795,159
- vs. low bid
- +$991,563
- vs. engineer’s estimate
- +50%
8. Cdm Holdings
- Unit price
- $1,500.00/EA
- Extension
- $1,500.00
- Proposal total
- $8,325,506
- vs. low bid
- +$1,521,910
- vs. engineer’s estimate
- +87.5%
- Unit price
- $20,000.00/EA
- Extension
- $20,000.00
- Proposal total
- $9,159,173
- vs. low bid
- +$2,355,578
- vs. engineer’s estimate
- +2,400%
Proposal 1052-02-098 · let Nov 4, 2026 · Nueces County, Corpus Christi District
Line quantity 1 EA · Engineer’s estimate $1,500/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | J E Construction Services, LLCLOW BID | $2,146.00/EA | $2,146.00 | — | +43.1% | $3,833,265 | $3,958 (0.1%) left on table |
| 2 | Anderson Columbia Co., Inc. | $2,720.00/EA | $2,720.00 | +$574.00 | +81.3% | $3,837,222 | +$3,958 |
| 3 | Ck Newberry, LLC | $10,000.00/EA | $10,000.00 | +$7,854 | +566.7% | $4,616,801 | +$783,537 |
| 4 | Stx Civil | $1,902.28/EA | $1,902.28 | -$243.72 | +26.8% | $4,817,402 | +$984,137 |
| 5 | Texas Materials Group, Inc. | $3,400.00/EA | $3,400.00 | +$1,254 | +126.7% | $4,943,316 | +$1,110,051 |
1. J E Construction Services, LLC
LOW BID · WINNER- Unit price
- $2,146.00/EA
- Extension
- $2,146.00
- Proposal total
- $3,833,265
- Money left on the table
- $3,958 (0.1%)
- vs. engineer’s estimate
- +43.1%
- Unit price
- $2,720.00/EA
- Extension
- $2,720.00
- Proposal total
- $3,837,222
- vs. low bid
- +$3,958
- vs. engineer’s estimate
- +81.3%
- Unit price
- $10,000.00/EA
- Extension
- $10,000.00
- Proposal total
- $4,616,801
- vs. low bid
- +$783,537
- vs. engineer’s estimate
- +566.7%
4. Stx Civil
- Unit price
- $1,902.28/EA
- Extension
- $1,902.28
- Proposal total
- $4,817,402
- vs. low bid
- +$984,137
- vs. engineer’s estimate
- +26.8%
- Unit price
- $3,400.00/EA
- Extension
- $3,400.00
- Proposal total
- $4,943,316
- vs. low bid
- +$1,110,051
- vs. engineer’s estimate
- +126.7%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0262-01-034 | Milam | Bryan | 12 | 7 | Big Creek Construction, Ltd. | $1,500.00 | $2,000.00 |
| 2026-11-04 | 1017-03-040 | Hunt | Paris | 1 | 9 | Highway 19 Construction LLC | $5,000.00 | $800.00 |
| 2026-11-04 | 1052-02-098 | Nueces | Corpus Christi | 1 | 5 | J E Construction Services, LLC | $2,146.00 | $1,500.00 |
| 2026-11-03 | 0616-01-020 | San Patricio | Corpus Christi | 7 | 7 | Lcr Total Transport LLC | $500.00 | $1,100.00 |
| 2026-11-03 | 6497-19-001 | Travis | Austin | 29 | 13 | Road Doctors LLC | $1,000.00 | $1,000.00 |
| 2026-10-28 | 6510-42-001 | Angelina | Lufkin | 50 | 4 | Texas Drainage Inc. | $225.00 | $2,000.00 |
| 2026-10-13 | 6505-28-001 | Anderson | Tyler | 1 | 7 | Icos Management, LLC | $10,000.00 | $7,000.00 |
| 2026-10-08 | 6508-34-001 | Trinity | Lufkin | 50 | 2 | Texas Drainage Inc. | $225.00 | $2,000.00 |
| 2026-10-07 | 0014-23-041 | Hill | Waco | 1 | 5 | Northeastern Pavers, LLC | $4,500.00 | $2,800.00 |
| 2026-10-07 | 0143-03-049 | Wilson | San Antonio | 12 | 8 | Hunter Industries, Ltd. | $3,924.37 | $3,000.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 37 | $2,800.00 | $3,300.00 | $6,000.00 | -9.13% |
| Amarillo | 27 | $5,196.10 | $5,000.00 | $3,000.00 | +42.86% |
| Atlanta | 21 | $765.00 | $1,000.00 | $500.00 | -4.76% |
| Austin | 70 | $1,698.40 | $3,740.00 | $2,000.00 | -19.16% |
| Beaumont | 19 | $250.00 | $2,000.00 | $1,500.00 | — |
| Brownwood | 11 | $1,250.00 | $1,625.00 | $5,000.00 | — |
| Bryan | 84 | $1,500.00 | $1,900.00 | $2,000.00 | -40.71% |
| Childress | 17 | $2,805.00 | $2,600.00 | $2,587.09 | — |
| Corpus Christi | 98 | $900.00 | $1,700.00 | $1,100.00 | +7.3% |
| Dallas | 164 | $1,200.00 | $2,200.00 | $4,263.64 | +16.67% |
| El Paso | 17 | $34,753.00 | $12,500.00 | $4,250.00 | — |
| Fort Worth | 44 | $2,000.00 | $3,000.00 | $2,780.00 | 0% |
| Houston | 23 | $400.00 | $2,000.00 | $5,000.00 | — |
| Laredo | 47 | $750.00 | $5,000.00 | $2,150.00 | -11.11% |
| Lubbock | 42 | $6,650.00 | $5,800.00 | $3,000.00 | +58.64% |
| Lufkin | 121 | $225.00 | $1,000.00 | $2,000.00 | -37.31% |
| Odessa | 119 | $1,200.00 | $3,000.00 | $2,500.00 | +36.82% |
| Paris | 131 | $224.95 | $225.00 | $700.00 | +33.33% |
| Pharr | 32 | $2,420.00 | $3,200.00 | $2,500.00 | +60% |
| San Angelo | 9 | $2,413.00 | $5,000.00 | $6,000.00 | — |
| San Antonio | 208 | $1,214.10 | $2,500.00 | $3,650.00 | -21.31% |
| Tyler | 107 | $1,995.00 | $2,100.00 | $2,500.00 | +3.33% |
| Waco | 55 | $1,000.00 | $2,000.00 | $1,750.00 | -2.69% |
| Wichita Falls | 53 | $4,300.00 | $3,300.00 | $1,422.53 | -5.14% |
| Yoakum | 51 | $20,571.70 | $2,200.00 | $3,000.00 | -34.37% |
Related items
- 467-7308 · SET (TY II) (18 IN) (RCP) (6: 1) (P) ($1,115.55/EA)
- 467-7328 · SET (TY II) (24 IN) (RCP) (6: 1) (P) ($1,900.00/EA)
- 496-7007 · Remov STR (Pipe) ($21.40/LF)
- 464-7005 · RC Pipe (CL III)(24 IN) ($97.64/LF)
- 464-7003 · RC Pipe (CL III)(18 IN) ($75.00/LF)
- 496-7004 · Remov STR (SET) ($450.00/EA)
- 464-7007 · RC Pipe (CL III)(30 IN) ($123.90/LF)
- 464-7009 · RC Pipe (CL III)(36 IN) ($161.00/LF)