Electrical Power Service- Transformer, F&I, 5-10 KVA, Single Phase, Copper Windings (Item 0639 6121): FDOT Unit Price History

14 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA

Weighted average (12 mo)
$3,384.13/EA
Contracts (12 mo)
14
Total quantity (12 mo)
104 EA
Total amount (12 mo)
$351,950

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3116$3,153.6382$258,598
20252025-01-01 – 2025-12-3121$2,723.14178$484,720
Latest 12 months2025-11-01 – 2026-10-3114$3,384.13104$351,950

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
031$4,780.18+41.3%4
051$3,664.00+8.3%9
061$3,048.00-9.9%4
071$3,200.00-5.4%10
084$2,960.57-12.5%16
111$3,803.08+12.4%1
124$3,283.02-3%35

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0639 6121 (Electrical Power Service- Transformer, F&I, 5-10 KVA, Single Phase, Copper Windings) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 14 contracts with a quantity-weighted average of $3,384.13 per EA, on 104 EA worth $351,950 in total.

The same report run for earlier periods shows $3,153.63 in 2024 (16 contracts, 82 EA), $2,723.14 in 2025 (21 contracts, 178 EA), $3,384.13 in the latest 12 months (14 contracts, 104 EA). From 2024 to the latest 12 months the weighted average rose 7.3%.

Quantity let statewide grew 27% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

In the same 12 months, 7 of FDOT's 14 market areas reported this item: area 03 at $4,780.18 (1 contract), area 05 at $3,664.00 (1 contract), area 06 at $3,048.00 (1 contract), area 07 at $3,200.00 (1 contract), area 08 at $2,960.57 (4 contracts), area 11 at $3,803.08 (1 contract), area 12 at $3,283.02 (4 contracts).

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0639: 0639 2 1 Electrical Service Wire, Furnish & Install ($13.20 per LF, 108 contracts); 0639 1122 Electrical Power Service, F&I, Underground, Meter Purchased BY Contractor ($5,545.22 per AS, 84 contracts); 0639 3 11 Electrical Service Disconnect, F&I, Pole Mount ($2,738.60 per EA, 62 contracts); 0639 2 6 Electrical Service Wire, Remove ($1.33 per LF, 50 contracts); 0639 1620 Electrical Power Service, Remove Underground ($990.24 per AS, 32 contracts).

Related items in section 0639

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.