Instl DEL Assm (D-SW)SZ 1(BRF)CTB (BI) (Item 658-7013): TxDOT Unit Price History
1,301 bids · 183 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure EA
TxDOT 658-7013 · INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI) · Unit: EA
- Low bid
- $33.00/EA
- Quantity-weighted median of winning unit prices
- Weighted median
- $30.00/EA
- Quantity-weighted median of every bid
- Engineer’s estimate
- $29.00/EA
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -8.33%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 658-7013 (Instl DEL Assm (D-SW)SZ 1(BRF)CTB (BI)) is measured in EA. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,301 bids for it on 183 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 673 bids was $30.00 per EA, and the winning low bidders priced it at a weighted median of $33.00 per EA.
TxDOT's engineer's estimate for the same lines had a weighted median of $29.00 per EA, so winning bids came in 13.8% above the estimate.
By calendar year, the median bid moved from $30.00 in 2025 (654 bids) to $27.50 in 2026 (610 bids), down 8.3%. The middle half of 2026 bids fell between $20.00 and $42.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 8.33%.
Quantity matters for this item. Lines of 1 to 6 EA had a weighted median of $29.04, while lines above 20 EA had $32.00; larger lines were priced higher here, which is unusual and worth checking against the individual lettings.
Across 175 lines where both a winning and a second-place bid were published, the median winning unit price was $28.00 against $30.00 from the second-lowest bidder, a median gap of 0.31% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 22 TxDOT districts with at least ten bids, Austin had the lowest weighted median ($12.10) and Brownwood the highest ($56.03). The busiest district for this item was Yoakum.
The most recent letting with this item was on Nov 4, 2026 in Webb County, where Stx Civil was the low bidder at $151.13 per EA for 6 EA against an estimate of $100.00.
13 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 658-7019 Instl DEL Assm (D-SW)SZ 1(BRF)GF2(BI) (weighted median $25.00 per EA); 662-7112 WK ZN PAV MRK SHT Term (TAB)TY W (weighted median $1.08 per EA); 662-7114 WK ZN PAV MRK SHT Term (TAB)TY Y-2 (weighted median $1.00 per EA); 662-7038 WK ZN PAV MRK NON-Remov (Y)6"(SLD) (weighted median $0.220 per LF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 37 | 5 | $38.15 | $40.00 | $26.80 | $20.00 | $50.00 |
| 2025 | 654 | 97 | $40.52 | $32.00 | $30.00 | $23.00 | $45.00 |
| 2026 | 610 | 82 | $37.46 | $30.00 | $27.50 | $20.00 | $42.00 |
Quantity bands
| Band | Quantity (EA) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 1–6 | 441 | $39.52 | $29.04 | $21.50–$45.00 |
| Medium | 7–18 | 488 | $39.00 | $30.00 | $22.00–$45.00 |
| Large | 20–628 | 372 | $38.76 | $32.00 | $21.65–$42.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $28.00
- Median second-low unit price
- $30.00
- Median engineer’s estimate
- $35.00
- Median gap, second vs. low
- +0.31%
175 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0922-33-234 · let Nov 4, 2026 · Webb County, Laredo District
Line quantity 6 EA · Engineer’s estimate $100.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Stx CivilLOW BID | $151.13/EA | $906.78 | — | +51.1% | $2,866,785 | $83,215 (2.9%) left on table |
| 2 | Delgado's Contractors, LLC | $130.00/EA | $780.00 | -$126.78 | +30% | $2,950,000 | +$83,215 |
| 3 | Acee Construction LLC. | $131.25/EA | $787.50 | -$119.28 | +31.3% | $3,033,273 | +$166,488 |
| 4 | James Construction Group, LLC | $45.00/EA | $270.00 | -$636.78 | -55% | $3,261,472 | +$394,687 |
| 5 | E-Z Bel Construction, LLC | $125.00/EA | $750.00 | -$156.78 | +25% | $3,270,969 | +$404,184 |
| 6 | Lucania Contractors LLC | $100.00/EA | $600.00 | -$306.78 | 0% | $3,466,015 | +$599,230 |
| 7 | Foremost Paving, Inc. | $90.00/EA | $540.00 | -$366.78 | -10% | $5,083,300 | +$2,216,516 |
1. Stx Civil
LOW BID · WINNER- Unit price
- $151.13/EA
- Extension
- $906.78
- Proposal total
- $2,866,785
- Money left on the table
- $83,215 (2.9%)
- vs. engineer’s estimate
- +51.1%
- Unit price
- $130.00/EA
- Extension
- $780.00
- Proposal total
- $2,950,000
- vs. low bid
- +$83,215
- vs. engineer’s estimate
- +30%
3. Acee Construction LLC.
- Unit price
- $131.25/EA
- Extension
- $787.50
- Proposal total
- $3,033,273
- vs. low bid
- +$166,488
- vs. engineer’s estimate
- +31.3%
- Unit price
- $45.00/EA
- Extension
- $270.00
- Proposal total
- $3,261,472
- vs. low bid
- +$394,687
- vs. engineer’s estimate
- -55%
- Unit price
- $125.00/EA
- Extension
- $750.00
- Proposal total
- $3,270,969
- vs. low bid
- +$404,184
- vs. engineer’s estimate
- +25%
- Unit price
- $100.00/EA
- Extension
- $600.00
- Proposal total
- $3,466,015
- vs. low bid
- +$599,230
- vs. engineer’s estimate
- 0%
- Unit price
- $90.00/EA
- Extension
- $540.00
- Proposal total
- $5,083,300
- vs. low bid
- +$2,216,516
- vs. engineer’s estimate
- -10%
Proposal 0022-03-032 · let Nov 3, 2026 · Terrell County, Odessa District
Line quantity 44 EA · Engineer’s estimate $59.90/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | The Truesdell CorporationLOW BID | $130.00/EA | $5,720.00 | — | +117% | $2,888,888 | $89,789 (3.11%) left on table |
| 2 | Relmco, Inc. | $35.00/EA | $1,540.00 | -$4,180 | -41.6% | $2,978,677 | +$89,789 |
| 3 | Pathfield Investments LLC | $90.00/EA | $3,960.00 | -$1,760 | +50.3% | $3,052,152 | +$163,264 |
| 4 | Structural Integrity Group LLC | $25.00/EA | $1,100.00 | -$4,620 | -58.3% | $3,205,119 | +$316,231 |
| 5 | Massana Construction Inc. | $45.00/EA | $1,980.00 | -$3,740 | -24.9% | $3,332,351 | +$443,463 |
| 6 | Scr Civil Construction, LLC | $42.00/EA | $1,848.00 | -$3,872 | -29.9% | $3,557,553 | +$668,665 |
| 7 | Ragle Construction, Inc. | $35.00/EA | $1,540.00 | -$4,180 | -41.6% | $3,982,565 | +$1,093,677 |
- LOW BID · WINNER
- Unit price
- $130.00/EA
- Extension
- $5,720.00
- Proposal total
- $2,888,888
- Money left on the table
- $89,789 (3.11%)
- vs. engineer’s estimate
- +117%
2. Relmco, Inc.
- Unit price
- $35.00/EA
- Extension
- $1,540.00
- Proposal total
- $2,978,677
- vs. low bid
- +$89,789
- vs. engineer’s estimate
- -41.6%
- Unit price
- $90.00/EA
- Extension
- $3,960.00
- Proposal total
- $3,052,152
- vs. low bid
- +$163,264
- vs. engineer’s estimate
- +50.3%
- Unit price
- $25.00/EA
- Extension
- $1,100.00
- Proposal total
- $3,205,119
- vs. low bid
- +$316,231
- vs. engineer’s estimate
- -58.3%
- Unit price
- $45.00/EA
- Extension
- $1,980.00
- Proposal total
- $3,332,351
- vs. low bid
- +$443,463
- vs. engineer’s estimate
- -24.9%
- Unit price
- $42.00/EA
- Extension
- $1,848.00
- Proposal total
- $3,557,553
- vs. low bid
- +$668,665
- vs. engineer’s estimate
- -29.9%
- Unit price
- $35.00/EA
- Extension
- $1,540.00
- Proposal total
- $3,982,565
- vs. low bid
- +$1,093,677
- vs. engineer’s estimate
- -41.6%
Proposal 0917-30-068 · let Nov 3, 2026 · Burleson County, Bryan District
Line quantity 2 EA · Engineer’s estimate $25.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | C & W Southern LLCLOW BID | $18.00/EA | $36.00 | — | -28% | $721,844 | $6,333 (0.88%) left on table |
| 2 | Thk Construction LLC | $18.90/EA | $37.80 | +$1.80 | -24.4% | $728,177 | +$6,333 |
| 3 | Knife River Corporation - South | $20.00/EA | $40.00 | +$4.00 | -20% | $735,430 | +$13,586 |
| 4 | E-Z Bel Construction, LLC | $25.50/EA | $51.00 | +$15.00 | +2% | $749,950 | +$28,106 |
| 5 | Trevway, Inc. | $10.00/EA | $20.00 | -$16.00 | -60% | $758,500 | +$36,656 |
| 6 | Garret Shields Infrastructure | $20.00/EA | $40.00 | +$4.00 | -20% | $793,429 | +$71,585 |
| 7 | Hodges and Son Construction Company, Inc. | $20.00/EA | $40.00 | +$4.00 | -20% | $832,669 | +$110,825 |
| 8 | Presidio Contracting, LLC | $21.00/EA | $42.00 | +$6.00 | -16% | $843,422 | +$121,578 |
| 9 | Yoko Excavating, LLC | $45.00/EA | $90.00 | +$54.00 | +80% | $847,156 | +$125,312 |
| 10 | Stx Civil | $27.87/EA | $55.74 | +$19.74 | +11.5% | $867,320 | +$145,476 |
| 11 | Taylor Bridge LLC | $100.00/EA | $200.00 | +$164.00 | +300% | $911,373 | +$189,529 |
| 12 | Scott Tucker Construction Company, LLC | $20.00/EA | $40.00 | +$4.00 | -20% | $911,850 | +$190,006 |
| 13 | Rucoba & Maya Construction, LLC | $5.25/EA | $10.50 | -$25.50 | -79% | $954,437 | +$232,593 |
| 14 | Rb Contracting, LLC | $35.00/EA | $70.00 | +$34.00 | +40% | $1,079,985 | +$358,141 |
| 15 | Fuqua Construction Co., Inc. | $78.15/EA | $156.30 | +$120.30 | +212.6% | $1,415,641 | +$693,797 |
- LOW BID · WINNER
- Unit price
- $18.00/EA
- Extension
- $36.00
- Proposal total
- $721,844
- Money left on the table
- $6,333 (0.88%)
- vs. engineer’s estimate
- -28%
- Unit price
- $18.90/EA
- Extension
- $37.80
- Proposal total
- $728,177
- vs. low bid
- +$6,333
- vs. engineer’s estimate
- -24.4%
- Unit price
- $20.00/EA
- Extension
- $40.00
- Proposal total
- $735,430
- vs. low bid
- +$13,586
- vs. engineer’s estimate
- -20%
- Unit price
- $25.50/EA
- Extension
- $51.00
- Proposal total
- $749,950
- vs. low bid
- +$28,106
- vs. engineer’s estimate
- +2%
- Unit price
- $10.00/EA
- Extension
- $20.00
- Proposal total
- $758,500
- vs. low bid
- +$36,656
- vs. engineer’s estimate
- -60%
6. Garret Shields Infrastructure
- Unit price
- $20.00/EA
- Extension
- $40.00
- Proposal total
- $793,429
- vs. low bid
- +$71,585
- vs. engineer’s estimate
- -20%
- Unit price
- $20.00/EA
- Extension
- $40.00
- Proposal total
- $832,669
- vs. low bid
- +$110,825
- vs. engineer’s estimate
- -20%
- Unit price
- $21.00/EA
- Extension
- $42.00
- Proposal total
- $843,422
- vs. low bid
- +$121,578
- vs. engineer’s estimate
- -16%
- Unit price
- $45.00/EA
- Extension
- $90.00
- Proposal total
- $847,156
- vs. low bid
- +$125,312
- vs. engineer’s estimate
- +80%
10. Stx Civil
- Unit price
- $27.87/EA
- Extension
- $55.74
- Proposal total
- $867,320
- vs. low bid
- +$145,476
- vs. engineer’s estimate
- +11.5%
- Unit price
- $100.00/EA
- Extension
- $200.00
- Proposal total
- $911,373
- vs. low bid
- +$189,529
- vs. engineer’s estimate
- +300%
- Unit price
- $20.00/EA
- Extension
- $40.00
- Proposal total
- $911,850
- vs. low bid
- +$190,006
- vs. engineer’s estimate
- -20%
13. Rucoba & Maya Construction, LLC
- Unit price
- $5.25/EA
- Extension
- $10.50
- Proposal total
- $954,437
- vs. low bid
- +$232,593
- vs. engineer’s estimate
- -79%
- Unit price
- $35.00/EA
- Extension
- $70.00
- Proposal total
- $1,079,985
- vs. low bid
- +$358,141
- vs. engineer’s estimate
- +40%
15. Fuqua Construction Co., Inc.
- Unit price
- $78.15/EA
- Extension
- $156.30
- Proposal total
- $1,415,641
- vs. low bid
- +$693,797
- vs. engineer’s estimate
- +212.6%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0922-33-234 | Webb | Laredo | 6 | 7 | Stx Civil | $151.13 | $100.00 |
| 2026-11-03 | 0022-03-032 | Terrell | Odessa | 44 | 7 | The Truesdell Corporation | $130.00 | $59.90 |
| 2026-11-03 | 0917-30-068 | Burleson | Bryan | 2 | 15 | C & W Southern LLC | $18.00 | $25.00 |
| 2026-10-07 | 0022-01-034 | Terrell | Odessa | 13 | 7 | Relmco, Inc. | $38.50 | $40.00 |
| 2026-10-07 | 0200-01-093 | Angelina | Lufkin | 20 | 7 | Longview Bridge and Road, Ltd. | $50.00 | $50.00 |
| 2026-10-06 | 1122-01-034 | Karnes | Corpus Christi | 2 | 7 | Ck Newberry, LLC | $35.00 | $30.00 |
| 2026-09-03 | 0844-04-011 | Collingsworth | Childress | 34 | 7 | Coppell Construction Co., Inc. | $15.00 | $37.94 |
| 2026-09-03 | 0917-31-036 | Madison | Bryan | 16 | 7 | Fuqua Construction Co., Inc. | $44.24 | $10.00 |
| 2026-09-02 | 0427-01-042 | Red River | Paris | 2 | 7 | Highway 19 Construction LLC | $25.00 | $25.00 |
| 2026-09-02 | 0903-28-073 | Montague | Wichita Falls | 24 | 6 | Texas Steel Industrial Placing, LLC | $20.00 | $42.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 57 | $46.50 | $38.50 | $14.83 | +6.9% |
| Amarillo | 17 | $96.30 | $40.00 | $35.00 | — |
| Atlanta | 23 | $46.13 | $47.75 | $45.00 | — |
| Austin | 40 | $10.00 | $12.10 | $15.00 | -54.95% |
| Beaumont | 38 | $20.00 | $25.00 | $22.00 | -22.05% |
| Brownwood | 18 | $57.00 | $56.03 | $20.00 | — |
| Bryan | 84 | $25.00 | $27.00 | $30.00 | -3.57% |
| Childress | 46 | $24.00 | $25.00 | $36.60 | — |
| Corpus Christi | 82 | $45.00 | $47.80 | $70.00 | -33.33% |
| Dallas | 95 | $35.00 | $25.00 | $20.50 | -19.12% |
| El Paso | 4 | $60.00 | $50.00 | $45.00 | — |
| Fort Worth | 87 | $22.00 | $22.00 | $23.00 | -12% |
| Houston | 69 | $33.00 | $50.00 | $30.00 | -1.48% |
| Laredo | 29 | $25.00 | $35.00 | $30.00 | — |
| Lubbock | 2 | $200.00 | $230.00 | $65.00 | — |
| Lufkin | 81 | $28.00 | $40.00 | $24.00 | 0% |
| Odessa | 26 | $130.00 | $42.00 | $59.90 | -10% |
| Paris | 24 | $20.00 | $20.00 | $45.00 | — |
| Pharr | 30 | $50.00 | $36.03 | $35.00 | — |
| San Angelo | 7 | $43.60 | $43.60 | $30.00 | — |
| San Antonio | 31 | $25.00 | $25.00 | $24.00 | +12.48% |
| Tyler | 52 | $33.00 | $22.00 | $27.00 | -30% |
| Waco | 92 | $22.00 | $30.00 | $40.00 | 0% |
| Wichita Falls | 22 | $20.00 | $22.50 | $42.00 | — |
| Yoakum | 245 | $21.00 | $22.00 | $29.00 | -4.2% |
Related items
- 658-7019 · Instl DEL Assm (D-SW)SZ 1(BRF)GF2(BI) ($25.00/EA)
- 662-7112 · WK ZN PAV MRK SHT Term (TAB)TY W ($1.08/EA)
- 662-7114 · WK ZN PAV MRK SHT Term (TAB)TY Y-2 ($1.00/EA)
- 662-7038 · WK ZN PAV MRK NON-Remov (Y)6"(SLD) ($0.220/LF)
- 662-7008 · WK ZN PAV MRK NON-Remov (W)6"(SLD) ($0.250/LF)
- 662-7100 · WK ZN PAV MRK Remov (Y)6"(SLD) ($0.800/LF)
- 662-7068 · WK ZN PAV MRK Remov (W)6"(SLD) ($0.760/LF)
- 666-7024 · Refl PAV MRK TY I (W)8"(SLD)(100MIL) ($0.850/LF)
Is your price for item 658-7013 in line? Benchmark your whole bid tab against TxDOT bid history.