Temporary Barrier, F&I, Anchored (Item 0102 71 15): FDOT Unit Price History

49 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure LF

Weighted average (12 mo)
$22.91/LF
Contracts (12 mo)
49
Total quantity (12 mo)
319,172 LF
Total amount (12 mo)
$7,313,006

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3142$28.04312,278$8,757,785
20252025-01-01 – 2025-12-3152$15.32537,939$8,239,492
Latest 12 months2025-11-01 – 2026-10-3149$22.91319,172$7,313,006

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
012$53.02+131.4%4,946
022$50.58+120.8%1,550
034$56.78+147.8%5,629
046$38.27+67%16,414
053$41.37+80.6%2,592
062$41.69+82%10,486
077$41.68+81.9%47,642
088$37.08+61.9%20,562
091$1.00-95.6%2,600
104$53.45+133.3%9,522
112$31.88+39.2%8,306
127$10.25-55.3%188,623
131$75.00+227.4%300

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0102 71 15 (Temporary Barrier, F&I, Anchored) is measured in LF. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 49 contracts with a quantity-weighted average of $22.91 per LF, on 319,172 LF worth $7,313,006 in total.

The same report run for earlier periods shows $28.04 in 2024 (42 contracts, 312,278 LF), $15.32 in 2025 (52 contracts, 537,939 LF), $22.91 in the latest 12 months (49 contracts, 319,172 LF). From 2024 to the latest 12 months the weighted average fell 18.3%.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 7 market areas with at least three contracts, market area 12 had the lowest weighted average ($10.25 per LF, 7 contracts) and market area 03 the highest ($56.78, 4 contracts), 5.5 times as much. Market area 08 let the most contracts with this item (8). 13 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0102: 0102 1 Maintenance OF Traffic ($1,069.75 per DA, 266 contracts); 0102 60 Work Zone Sign ($0.230 per ED, 265 contracts); 0102 74 1 Channelizing Device- Types I, II, DI, VP, Drum, OR LCD ($0.110 per ED, 263 contracts); 0102 99 Portable Changeable Message Sign, Temporary ($10.81 per ED, 257 contracts); 0102 76 Arrow Board / Advance Warning Arrow Panel ($5.10 per ED, 208 contracts).

Related items in section 0102

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.