Barrier Mounted Work Zone Sign- Index 700-013 (Item 0102 62 13): FDOT Unit Price History

15 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure ED

Weighted average (12 mo)
$0.540/ED
Contracts (12 mo)
15
Total quantity (12 mo)
54,222 ED
Total amount (12 mo)
$29,057

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3114$0.590112,974$67,115
20252025-01-01 – 2025-12-3116$0.490144,810$70,649
Latest 12 months2025-11-01 – 2026-10-3115$0.54054,222$29,057

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
021$0.340-37%882
031$5.53+924.1%180
041$0.400-25.9%1,813
055$0.480-11.1%7,428
072$0.570+5.6%5,708
082$1.44+166.7%5,005
111$0.5400%1,167
122$0.390-27.8%32,039

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0102 62 13 (Barrier Mounted Work Zone Sign- Index 700-013) is measured in ED. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 15 contracts with a quantity-weighted average of $0.540 per ED, on 54,222 ED worth $29,057 in total.

The same report run for earlier periods shows $0.590 in 2024 (14 contracts, 112,974 ED), $0.490 in 2025 (16 contracts, 144,810 ED), $0.540 in the latest 12 months (15 contracts, 54,222 ED). From 2024 to the latest 12 months the weighted average fell 8.5%.

Quantity let statewide shrank 52% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

In the same 12 months, 8 of FDOT's 14 market areas reported this item: area 02 at $0.340 (1 contract), area 03 at $5.53 (1 contract), area 04 at $0.400 (1 contract), area 05 at $0.480 (5 contracts), area 07 at $0.570 (2 contracts), area 08 at $1.44 (2 contracts), area 11 at $0.540 (1 contract), area 12 at $0.390 (2 contracts).

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0102: 0102 1 Maintenance OF Traffic ($1,069.75 per DA, 266 contracts); 0102 60 Work Zone Sign ($0.230 per ED, 265 contracts); 0102 74 1 Channelizing Device- Types I, II, DI, VP, Drum, OR LCD ($0.110 per ED, 263 contracts); 0102 99 Portable Changeable Message Sign, Temporary ($10.81 per ED, 257 contracts); 0102 76 Arrow Board / Advance Warning Arrow Panel ($5.10 per ED, 208 contracts).

Related items in section 0102

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.