Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Thermoplastic, Preformed, White With Black Contrast, Arrow ON Concrete Surface (Item 0711 14570): FDOT Unit Price History

21 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA

Weighted average (12 mo)
$733.15/EA
Contracts (12 mo)
21
Total quantity (12 mo)
205 EA
Total amount (12 mo)
$150,295

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3117$783.36345$270,258
20252025-01-01 – 2025-12-3116$1,068.10595$635,519
Latest 12 months2025-11-01 – 2026-10-3121$733.15205$150,295

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
041$550.00-25%8
055$849.85+15.9%33
061$350.00-52.3%1
072$612.74-16.4%28
085$681.85-7%65
091$818.20+11.6%38
101$210.00-71.4%6
121$703.55-4%6
134$972.50+32.6%20

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0711 14570 (Thermoplastic, Preformed, White With Black Contrast, Arrow ON Concrete Surface) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 21 contracts with a quantity-weighted average of $733.15 per EA, on 205 EA worth $150,295 in total.

The same report run for earlier periods shows $783.36 in 2024 (17 contracts, 345 EA), $1,068.10 in 2025 (16 contracts, 595 EA), $733.15 in the latest 12 months (21 contracts, 205 EA). From 2024 to the latest 12 months the weighted average fell 6.4%.

Quantity let statewide shrank 41% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 3 market areas with at least three contracts, market area 08 had the lowest weighted average ($681.85 per EA, 5 contracts) and market area 13 the highest ($972.50, 4 contracts), 1.4 times as much. Market area 05 let the most contracts with this item (5). 9 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0711: 0711 16201 Thermoplastic, Standard-Other Surfaces, Yellow, Solid, 6" ($5,264.57 per GM, 204 contracts); 0711 16101 Thermoplastic, Standard-Other Surfaces, White, Solid, 6" ($5,320.58 per GM, 202 contracts); 0711 11125 Thermoplastic, Standard, White, Solid, 24" FOR Stop Line AND Crosswalk ($7.00 per LF, 188 contracts); 0711 11170 Thermoplastic, Standard, White, Arrow ($86.63 per EA, 181 contracts); 0711 11124 Thermoplastic, Standard, White, Solid, 18" FOR Diagonals AND Chevrons ($5.52 per LF, 165 contracts).

Related items in section 0711

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.