Performance Turf, SOD AND Soil- Shoulder Treatment Index 570-010 (Item 0570 1 3): FDOT Unit Price History

24 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure SY

Weighted average (12 mo)
$5.44/SY
Contracts (12 mo)
24
Total quantity (12 mo)
204,488 SY
Total amount (12 mo)
$1,112,330

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3145$5.95475,353$2,826,484
20252025-01-01 – 2025-12-3143$6.16247,734$1,527,183
Latest 12 months2025-11-01 – 2026-10-3124$5.44204,488$1,112,330

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
013$5.68+4.4%3,384
021$15.00+175.7%99
031$2.85-47.6%1,501
042$3.77-30.7%36,143
051$1.00-81.6%19,218
075$6.55+20.4%118,332
083$11.15+105%1,360
091$4.80-11.8%22,916
102$63.59+1,068.9%114
121$13.00+139%6
134$16.90+210.7%1,415

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0570 1 3 (Performance Turf, SOD AND Soil- Shoulder Treatment Index 570-010) is measured in SY. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 24 contracts with a quantity-weighted average of $5.44 per SY, on 204,488 SY worth $1,112,330 in total.

The same report run for earlier periods shows $5.95 in 2024 (45 contracts, 475,353 SY), $6.16 in 2025 (43 contracts, 247,734 SY), $5.44 in the latest 12 months (24 contracts, 204,488 SY). From 2024 to the latest 12 months the weighted average fell 8.6%.

Quantity let statewide shrank 57% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 4 market areas with at least three contracts, market area 01 had the lowest weighted average ($5.68 per SY, 3 contracts) and market area 13 the highest ($16.90, 4 contracts), 3.0 times as much. Market area 07 let the most contracts with this item (5). 11 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0570: 0570 1 2 Performance Turf, SOD ($4.31 per SY, 230 contracts); 0570 13 1 Shoulder Drop OFF Soil ($23.73 per CY, 22 contracts); 0570 1 1 Performance Turf ($1.94 per SY, 15 contracts).

Related items in section 0570

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.