Performance Turf (Item 0570 1 1): FDOT Unit Price History

15 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure SY

Weighted average (12 mo)
$1.94/SY
Contracts (12 mo)
15
Total quantity (12 mo)
696,632 SY
Total amount (12 mo)
$1,351,059

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3129$1.931,306,805$2,516,416
20252025-01-01 – 2025-12-3122$2.181,215,009$2,653,699
Latest 12 months2025-11-01 – 2026-10-3115$1.94696,632$1,351,059

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
011$1.93-0.5%5,129
021$1.50-22.7%11,583
032$2.29+18%27,179
041$0.460-76.3%15,962
062$1.93-0.5%27,255
074$1.69-12.9%578,670
081$7.00+260.8%1,039
101$7.20+271.1%29,696
132$12.58+548.5%119

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0570 1 1 (Performance Turf) is measured in SY. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 15 contracts with a quantity-weighted average of $1.94 per SY, on 696,632 SY worth $1,351,059 in total.

The same report run for earlier periods shows $1.93 in 2024 (29 contracts, 1,306,805 SY), $2.18 in 2025 (22 contracts, 1,215,009 SY), $1.94 in the latest 12 months (15 contracts, 696,632 SY). Across those periods the weighted average stayed within three percent.

Quantity let statewide shrank 47% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

In the same 12 months, 9 of FDOT's 14 market areas reported this item: area 01 at $1.93 (1 contract), area 02 at $1.50 (1 contract), area 03 at $2.29 (2 contracts), area 04 at $0.460 (1 contract), area 06 at $1.93 (2 contracts), area 07 at $1.69 (4 contracts), area 08 at $7.00 (1 contract), area 10 at $7.20 (1 contract), area 13 at $12.58 (2 contracts).

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0570: 0570 1 2 Performance Turf, SOD ($4.31 per SY, 230 contracts); 0570 1 3 Performance Turf, SOD AND Soil- Shoulder Treatment Index 570-010 ($5.44 per SY, 24 contracts); 0570 13 1 Shoulder Drop OFF Soil ($23.73 per CY, 22 contracts).

Related items in section 0570

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.