Straight Concrete Endwalls, 24", Single, 0 Degrees, Round (Item 0430524100): FDOT Unit Price History
10 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA
- Weighted average (12 mo)
- $5,107.64/EA
- Contracts (12 mo)
- 10
- Total quantity (12 mo)
- 16 EA
- Total amount (12 mo)
- $81,722
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 5 | $5,181.67 | 12 | $62,180 |
| 2025 | 2025-01-01 – 2025-12-31 | 15 | $6,888.59 | 49 | $337,541 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 10 | $5,107.64 | 16 | $81,722 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 02 | 1 | $6,100.00 | +19.4% | 2 |
| 03 | 2 | $5,190.60 | +1.6% | 2 |
| 06 | 1 | $4,969.00 | -2.7% | 2 |
| 07 | 3 | $5,154.55 | +0.9% | 7 |
| 12 | 3 | $4,373.73 | -14.4% | 3 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0430524100 (Straight Concrete Endwalls, 24", Single, 0 Degrees, Round) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 10 contracts with a quantity-weighted average of $5,107.64 per EA, on 16 EA worth $81,722 in total.
The same report run for earlier periods shows $5,181.67 in 2024 (5 contracts, 12 EA), $6,888.59 in 2025 (15 contracts, 49 EA), $5,107.64 in the latest 12 months (10 contracts, 16 EA). Across those periods the weighted average stayed within three percent.
Quantity let statewide grew 33% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
In the same 12 months, 5 of FDOT's 14 market areas reported this item: area 02 at $6,100.00 (1 contract), area 03 at $5,190.60 (2 contracts), area 06 at $4,969.00 (1 contract), area 07 at $5,154.55 (3 contracts), area 12 at $4,373.73 (3 contracts).
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.