RE PM TY II (Y) 6" (SLD) (Item 666-7213): TxDOT Unit Price History
1,321 bids · 253 bid lines · Sep 6, 2024 to Oct 14, 2026 · unit of measure LF
TxDOT 666-7213 · RE PM TY II (Y) 6" (SLD) · Unit: LF
- Low bid
- $0.150/LF
- Quantity-weighted median of winning unit prices
- Weighted median
- $0.170/LF
- Quantity-weighted median of every bid
- Engineer’s estimate
- $0.190/LF
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- +12.68%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Sep 6, 2024–Oct 14, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 666-7213 (RE PM TY II (Y) 6" (SLD)) is measured in LF. Between Sep 6, 2024 and Oct 14, 2026, contractors entered 1,321 bids for it on 253 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 685 bids was $0.170 per LF, and the winning low bidders priced it at a weighted median of $0.150 per LF.
TxDOT's engineer's estimate for the same lines had a weighted median of $0.190 per LF, so winning bids came in 21.1% below the estimate.
By calendar year, the median bid moved from $0.350 in 2025 (632 bids) to $0.440 in 2026 (616 bids), up 25.7%. The middle half of 2026 bids fell between $0.250 and $1.11.
Comparing the last 12 months with the 12 months before, the median unit price rose 12.68%.
Quantity matters for this item. Lines of 64 to 4,482 LF had a weighted median of $1.15, while lines above 32,082 LF had $0.170, a 85% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 248 lines where both a winning and a second-place bid were published, the median winning unit price was $0.310 against $0.330 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 22 TxDOT districts with at least ten bids, Abilene had the lowest weighted median ($0.120) and Brownwood the highest ($1.65). The busiest district for this item was Austin.
The most recent letting with this item was on Oct 14, 2026 in Ellis County, where Stripe-A-Zone, LLC was the low bidder at $0.270 per LF for 150,000 LF against an estimate of $0.200.
1 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 666-7024 Refl PAV MRK TY I (W)8"(SLD)(100MIL) (weighted median $0.850 per LF); 666-7423 Refl PAV MRK TY I (Y)6"(SLD)(100MIL) (weighted median $0.450 per LF); 666-7036 Refl PAV MRK TY I (W)24"(SLD)(100MIL) (weighted median $7.00 per LF); 666-7411 Refl PAV MRK TY I (W)6"(SLD)(100MIL) (weighted median $0.450 per LF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 73 | 23 | $0.200 | $0.170 | $0.200 | $0.170 | $0.500 |
| 2025 | 632 | 127 | $0.210 | $0.160 | $0.350 | $0.230 | $1.00 |
| 2026 | 616 | 105 | $0.220 | $0.180 | $0.440 | $0.250 | $1.11 |
Quantity bands
| Band | Quantity (LF) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 64–4,482 | 441 | $1.66 | $1.15 | $0.750–$2.49 |
| Medium | 4,543–31,037 | 446 | $0.460 | $0.310 | $0.270–$0.500 |
| Large | 32,082–2,646,997 | 434 | $0.200 | $0.170 | $0.170–$0.270 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $0.310
- Median second-low unit price
- $0.330
- Median engineer’s estimate
- $0.350
- Median gap, second vs. low
- +0%
248 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0049-14-015 · let Oct 7, 2026 · Robertson County, Bryan District
Line quantity 2,646,997 LF · Engineer’s estimate $0.180/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Clark Construction of Texas, Inc.LOW BID | $0.13/LF | $344,109.61 | — | -27.8% | $19,126,405 | $1,289,164 (6.74%) left on table |
| 2 | Hayden Paving, Inc. | $0.13/LF | $344,109.61 | $0.000 | -27.8% | $20,415,569 | +$1,289,164 |
| 3 | Ronald R. Wagner & Co., LP | $0.13/LF | $344,109.61 | $0.000 | -27.8% | $21,668,037 | +$2,541,632 |
| 4 | Ck Newberry, LLC | $0.15/LF | $397,049.55 | +$52,940 | -16.7% | $22,126,611 | +$3,000,206 |
1. Clark Construction of Texas, Inc.
LOW BID · WINNER- Unit price
- $0.13/LF
- Extension
- $344,109.61
- Proposal total
- $19,126,405
- Money left on the table
- $1,289,164 (6.74%)
- vs. engineer’s estimate
- -27.8%
2. Hayden Paving, Inc.
- Unit price
- $0.13/LF
- Extension
- $344,109.61
- Proposal total
- $20,415,569
- vs. low bid
- +$1,289,164
- vs. engineer’s estimate
- -27.8%
- Unit price
- $0.13/LF
- Extension
- $344,109.61
- Proposal total
- $21,668,037
- vs. low bid
- +$2,541,632
- vs. engineer’s estimate
- -27.8%
- Unit price
- $0.15/LF
- Extension
- $397,049.55
- Proposal total
- $22,126,611
- vs. low bid
- +$3,000,206
- vs. engineer’s estimate
- -16.7%
Proposal 0303-04-039 · let Oct 7, 2026 · Briscoe County, Childress District
Line quantity 363,666 LF · Engineer’s estimate $0.240/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Northeastern Pavers, LLCLOW BID | $0.13/LF | $47,276.58 | — | -45.8% | $6,256,780 | $19,570 (0.31%) left on table |
| 2 | Ronald R. Wagner & Co., LP | $0.13/LF | $47,276.58 | $0.000 | -45.8% | $6,276,350 | +$19,570 |
| 3 | Breedon Investments USA Inc. | $0.13/LF | $47,276.58 | $0.000 | -45.8% | $6,362,254 | +$105,475 |
| 4 | Clark Construction of Texas, Inc. | $0.18/LF | $65,459.88 | +$18,183 | -25% | $7,809,282 | +$1,552,502 |
- LOW BID · WINNER
- Unit price
- $0.13/LF
- Extension
- $47,276.58
- Proposal total
- $6,256,780
- Money left on the table
- $19,570 (0.31%)
- vs. engineer’s estimate
- -45.8%
- Unit price
- $0.13/LF
- Extension
- $47,276.58
- Proposal total
- $6,276,350
- vs. low bid
- +$19,570
- vs. engineer’s estimate
- -45.8%
3. Breedon Investments USA Inc.
- Unit price
- $0.13/LF
- Extension
- $47,276.58
- Proposal total
- $6,362,254
- vs. low bid
- +$105,475
- vs. engineer’s estimate
- -45.8%
- Unit price
- $0.18/LF
- Extension
- $65,459.88
- Proposal total
- $7,809,282
- vs. low bid
- +$1,552,502
- vs. engineer’s estimate
- -25%
Proposal 0009-11-248 · let Oct 6, 2026 · Dallas County, Dallas District
Line quantity 16,813 LF · Engineer’s estimate $0.340/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Ragle Construction, Inc.LOW BID | $0.22/LF | $3,698.86 | — | -35.3% | $54,378,798 | $3,607,302 (6.63%) left on table |
| 2 | Webber, LLC | $0.20/LF | $3,362.60 | -$336.26 | -41.2% | $57,986,100 | +$3,607,302 |
| 3 | Pulice Construction, Inc. | $0.19/LF | $3,194.47 | -$504.39 | -44.1% | $59,712,296 | +$5,333,497 |
| 4 | Reyes TX, Inc. | $0.15/LF | $2,521.95 | -$1,177 | -55.9% | $59,000,000 | +$4,621,202 |
| 5 | James Construction Group, LLC | $0.22/LF | $3,698.86 | $0.000 | -35.3% | $58,969,550 | +$4,590,752 |
| 6 | Balfour Beatty Infrastructure, Inc. | $0.37/LF | $6,220.81 | +$2,522 | +8.8% | $71,960,515 | +$17,581,716 |
| 7 | Mario Sinacola & Sons Excavating, Inc. | $0.20/LF | $3,362.60 | -$336.26 | -41.2% | $80,575,143 | +$26,196,345 |
- LOW BID · WINNER
- Unit price
- $0.22/LF
- Extension
- $3,698.86
- Proposal total
- $54,378,798
- Money left on the table
- $3,607,302 (6.63%)
- vs. engineer’s estimate
- -35.3%
2. Webber, LLC
- Unit price
- $0.20/LF
- Extension
- $3,362.60
- Proposal total
- $57,986,100
- vs. low bid
- +$3,607,302
- vs. engineer’s estimate
- -41.2%
3. Pulice Construction, Inc.
- Unit price
- $0.19/LF
- Extension
- $3,194.47
- Proposal total
- $59,712,296
- vs. low bid
- +$5,333,497
- vs. engineer’s estimate
- -44.1%
4. Reyes TX, Inc.
- Unit price
- $0.15/LF
- Extension
- $2,521.95
- Proposal total
- $59,000,000
- vs. low bid
- +$4,621,202
- vs. engineer’s estimate
- -55.9%
- Unit price
- $0.22/LF
- Extension
- $3,698.86
- Proposal total
- $58,969,550
- vs. low bid
- +$4,590,752
- vs. engineer’s estimate
- -35.3%
6. Balfour Beatty Infrastructure, Inc.
- Unit price
- $0.37/LF
- Extension
- $6,220.81
- Proposal total
- $71,960,515
- vs. low bid
- +$17,581,716
- vs. engineer’s estimate
- +8.8%
- Unit price
- $0.20/LF
- Extension
- $3,362.60
- Proposal total
- $80,575,143
- vs. low bid
- +$26,196,345
- vs. engineer’s estimate
- -41.2%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-10-14 | 6502-76-001 | Ellis | Dallas | 150,000 | 2 | Stripe-A-Zone, LLC | $0.270 | $0.200 |
| 2026-10-07 | 0049-14-015 | Robertson | Bryan | 2,646,997 | 4 | Clark Construction of Texas, Inc. | $0.130 | $0.180 |
| 2026-10-07 | 0092-05-058 | Ellis | Dallas | 1,191,001 | 1 | Clark Construction of Texas, Inc. | $0.150 | $0.220 |
| 2026-10-07 | 0303-04-039 | Briscoe | Childress | 363,666 | 4 | Northeastern Pavers, LLC | $0.130 | $0.240 |
| 2026-10-06 | 0009-11-248 | Dallas | Dallas | 16,813 | 7 | Ragle Construction, Inc. | $0.220 | $0.340 |
| 2026-10-06 | 0010-08-061 | Morris | Atlanta | 177,504 | 6 | Select Maintenance, L.L.C. | $0.400 | $0.170 |
| 2026-10-06 | 0095-03-100 | Kaufman | Dallas | 3,124 | 10 | Highway 19 Construction LLC | $0.750 | $0.500 |
| 2026-10-06 | 6496-83-001 | Gregg | Tyler | 550,000 | 2 | Striping Technology, L.P. | $0.160 | $0.250 |
| 2026-09-03 | 0028-05-057 | Liberty | Beaumont | 627,974 | 6 | Select Maintenance, L.L.C. | $0.250 | $0.300 |
| 2026-09-03 | 0039-10-095 | Cameron | Pharr | 238,705 | 3 | Ronald R. Wagner & Co., LP | $0.150 | $0.280 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 19 | $0.120 | $0.120 | $0.160 | — |
| Amarillo | 16 | $0.660 | $0.660 | $0.500 | — |
| Atlanta | 16 | $0.400 | $0.300 | $0.170 | — |
| Austin | 281 | $0.180 | $0.200 | $0.240 | -13.04% |
| Beaumont | 9 | $0.250 | $0.250 | $0.300 | — |
| Brownwood | 51 | $1.00 | $1.65 | $1.10 | +243.43% |
| Bryan | 46 | $0.130 | $0.180 | $0.180 | — |
| Childress | 11 | $0.240 | $0.200 | $0.300 | — |
| Corpus Christi | 48 | $0.110 | $0.130 | $0.170 | -11.43% |
| Dallas | 175 | $0.150 | $0.200 | $0.220 | -15.25% |
| El Paso | 48 | $0.180 | $0.200 | $0.350 | -27.27% |
| Fort Worth | 108 | $0.130 | $0.140 | $0.190 | -75% |
| Houston | 100 | $0.250 | $0.200 | $0.300 | +139.13% |
| Laredo | 20 | $0.750 | $0.750 | $1.20 | — |
| Lubbock | 30 | $0.210 | $0.300 | $0.300 | +952.63% |
| Lufkin | 17 | $0.150 | $0.200 | $0.200 | — |
| Odessa | 37 | $0.190 | $0.190 | $0.170 | — |
| Paris | 35 | $0.250 | $0.300 | $1.00 | +636.84% |
| Pharr | 38 | $0.220 | $0.220 | $0.280 | -25.93% |
| San Angelo | 58 | $0.120 | $0.130 | $0.170 | +303.85% |
| San Antonio | 24 | $0.350 | $0.350 | $0.160 | +171.88% |
| Tyler | 46 | $0.130 | $0.160 | $0.170 | +120% |
| Waco | 5 | $1.78 | $0.420 | $0.480 | — |
| Wichita Falls | 6 | $0.200 | $0.180 | $0.300 | — |
| Yoakum | 77 | $1.00 | $0.950 | $0.200 | -50% |
Related items
- 666-7024 · Refl PAV MRK TY I (W)8"(SLD)(100MIL) ($0.850/LF)
- 666-7423 · Refl PAV MRK TY I (Y)6"(SLD)(100MIL) ($0.450/LF)
- 666-7036 · Refl PAV MRK TY I (W)24"(SLD)(100MIL) ($7.00/LF)
- 666-7411 · Refl PAV MRK TY I (W)6"(SLD)(100MIL) ($0.450/LF)
- 666-7408 · Refl PAV MRK TY I (W)6"(BRK)(100MIL) ($0.520/LF)
- 666-7347 · Pavement Sler 6" ($0.190/LF)
- 666-7420 · Refl PAV MRK TY I (Y)6"(BRK)(100MIL) ($0.450/LF)
- 666-7042 · Refl PAV MRK TY I (W)(Arrow)(100MIL) ($150.00/EA)
Is your price for item 666-7213 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.