RE PM TY II (Y) 6" (SLD) (Item 666-7213): TxDOT Unit Price History

1,321 bids · 253 bid lines · Sep 6, 2024 to Oct 14, 2026 · unit of measure LF

TxDOT 666-7213 · RE PM TY II (Y) 6" (SLD) · Unit: LF

Low bid
$0.150/LF
Quantity-weighted median of winning unit prices
Weighted median
$0.170/LF
Quantity-weighted median of every bid
Engineer’s estimate
$0.190/LF
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
+12.68%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$2.00$4.00$6.00$8.00101001K10K100K1M10MQuantity (LF), log scaleUnit price ($/LF)
Winning (low) bid Other bid Fitted price curve (ln price = 2.34 − 0.322·ln qty, R² 0.58)320 plotted bids, 6 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Sep 6, 2024–Oct 14, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 666-7213 (RE PM TY II (Y) 6" (SLD)) is measured in LF. Between Sep 6, 2024 and Oct 14, 2026, contractors entered 1,321 bids for it on 253 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 685 bids was $0.170 per LF, and the winning low bidders priced it at a weighted median of $0.150 per LF.

TxDOT's engineer's estimate for the same lines had a weighted median of $0.190 per LF, so winning bids came in 21.1% below the estimate.

By calendar year, the median bid moved from $0.350 in 2025 (632 bids) to $0.440 in 2026 (616 bids), up 25.7%. The middle half of 2026 bids fell between $0.250 and $1.11.

Comparing the last 12 months with the 12 months before, the median unit price rose 12.68%.

Quantity matters for this item. Lines of 64 to 4,482 LF had a weighted median of $1.15, while lines above 32,082 LF had $0.170, a 85% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 248 lines where both a winning and a second-place bid were published, the median winning unit price was $0.310 against $0.330 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 22 TxDOT districts with at least ten bids, Abilene had the lowest weighted median ($0.120) and Brownwood the highest ($1.65). The busiest district for this item was Austin.

The most recent letting with this item was on Oct 14, 2026 in Ellis County, where Stripe-A-Zone, LLC was the low bidder at $0.270 per LF for 150,000 LF against an estimate of $0.200.

1 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 666-7024 Refl PAV MRK TY I (W)8"(SLD)(100MIL) (weighted median $0.850 per LF); 666-7423 Refl PAV MRK TY I (Y)6"(SLD)(100MIL) (weighted median $0.450 per LF); 666-7036 Refl PAV MRK TY I (W)24"(SLD)(100MIL) (weighted median $7.00 per LF); 666-7411 Refl PAV MRK TY I (W)6"(SLD)(100MIL) (weighted median $0.450 per LF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
20247323$0.200$0.170$0.200$0.170$0.500
2025632127$0.210$0.160$0.350$0.230$1.00
2026616105$0.220$0.180$0.440$0.250$1.11

Quantity bands

BandQuantity (LF)BidsWeighted avgWeighted median25th–75th pct
Small64–4,482441$1.66$1.15$0.750–$2.49
Medium4,543–31,037446$0.460$0.310$0.270–$0.500
Large32,082–2,646,997434$0.200$0.170$0.170–$0.270

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$0.310
Median second-low unit price
$0.330
Median engineer’s estimate
$0.350
Median gap, second vs. low
+0%

248 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0049-14-015 · let Oct 7, 2026 · Robertson County, Bryan District

Line quantity 2,646,997 LF · Engineer’s estimate $0.180/LF

  • Unit price
    $0.13/LF
    Extension
    $344,109.61
    Proposal total
    $19,126,405
    Money left on the table
    $1,289,164 (6.74%)
    vs. engineer’s estimate
    -27.8%
  • 2. Hayden Paving, Inc.

    Unit price
    $0.13/LF
    Extension
    $344,109.61
    Proposal total
    $20,415,569
    vs. low bid
    +$1,289,164
    vs. engineer’s estimate
    -27.8%
  • Unit price
    $0.13/LF
    Extension
    $344,109.61
    Proposal total
    $21,668,037
    vs. low bid
    +$2,541,632
    vs. engineer’s estimate
    -27.8%
  • Unit price
    $0.15/LF
    Extension
    $397,049.55
    Proposal total
    $22,126,611
    vs. low bid
    +$3,000,206
    vs. engineer’s estimate
    -16.7%

Proposal 0303-04-039 · let Oct 7, 2026 · Briscoe County, Childress District

Line quantity 363,666 LF · Engineer’s estimate $0.240/LF

  • 1. Northeastern Pavers, LLC

    LOW BID · WINNER
    Unit price
    $0.13/LF
    Extension
    $47,276.58
    Proposal total
    $6,256,780
    Money left on the table
    $19,570 (0.31%)
    vs. engineer’s estimate
    -45.8%
  • Unit price
    $0.13/LF
    Extension
    $47,276.58
    Proposal total
    $6,276,350
    vs. low bid
    +$19,570
    vs. engineer’s estimate
    -45.8%
  • 3. Breedon Investments USA Inc.

    Unit price
    $0.13/LF
    Extension
    $47,276.58
    Proposal total
    $6,362,254
    vs. low bid
    +$105,475
    vs. engineer’s estimate
    -45.8%
  • Unit price
    $0.18/LF
    Extension
    $65,459.88
    Proposal total
    $7,809,282
    vs. low bid
    +$1,552,502
    vs. engineer’s estimate
    -25%

Proposal 0009-11-248 · let Oct 6, 2026 · Dallas County, Dallas District

Line quantity 16,813 LF · Engineer’s estimate $0.340/LF

  • 1. Ragle Construction, Inc.

    LOW BID · WINNER
    Unit price
    $0.22/LF
    Extension
    $3,698.86
    Proposal total
    $54,378,798
    Money left on the table
    $3,607,302 (6.63%)
    vs. engineer’s estimate
    -35.3%
  • Unit price
    $0.20/LF
    Extension
    $3,362.60
    Proposal total
    $57,986,100
    vs. low bid
    +$3,607,302
    vs. engineer’s estimate
    -41.2%
  • 3. Pulice Construction, Inc.

    Unit price
    $0.19/LF
    Extension
    $3,194.47
    Proposal total
    $59,712,296
    vs. low bid
    +$5,333,497
    vs. engineer’s estimate
    -44.1%
  • 4. Reyes TX, Inc.

    Unit price
    $0.15/LF
    Extension
    $2,521.95
    Proposal total
    $59,000,000
    vs. low bid
    +$4,621,202
    vs. engineer’s estimate
    -55.9%
  • Unit price
    $0.22/LF
    Extension
    $3,698.86
    Proposal total
    $58,969,550
    vs. low bid
    +$4,590,752
    vs. engineer’s estimate
    -35.3%
  • 6. Balfour Beatty Infrastructure, Inc.

    Unit price
    $0.37/LF
    Extension
    $6,220.81
    Proposal total
    $71,960,515
    vs. low bid
    +$17,581,716
    vs. engineer’s estimate
    +8.8%
  • Unit price
    $0.20/LF
    Extension
    $3,362.60
    Proposal total
    $80,575,143
    vs. low bid
    +$26,196,345
    vs. engineer’s estimate
    -41.2%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-10-146502-76-001EllisDallas150,0002Stripe-A-Zone, LLC$0.270$0.200
2026-10-070049-14-015RobertsonBryan2,646,9974Clark Construction of Texas, Inc.$0.130$0.180
2026-10-070092-05-058EllisDallas1,191,0011Clark Construction of Texas, Inc.$0.150$0.220
2026-10-070303-04-039BriscoeChildress363,6664Northeastern Pavers, LLC$0.130$0.240
2026-10-060009-11-248DallasDallas16,8137Ragle Construction, Inc.$0.220$0.340
2026-10-060010-08-061MorrisAtlanta177,5046Select Maintenance, L.L.C.$0.400$0.170
2026-10-060095-03-100KaufmanDallas3,12410Highway 19 Construction LLC$0.750$0.500
2026-10-066496-83-001GreggTyler550,0002Striping Technology, L.P.$0.160$0.250
2026-09-030028-05-057LibertyBeaumont627,9746Select Maintenance, L.L.C.$0.250$0.300
2026-09-030039-10-095CameronPharr238,7053Ronald R. Wagner & Co., LP$0.150$0.280

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene19$0.120$0.120$0.160—
Amarillo16$0.660$0.660$0.500—
Atlanta16$0.400$0.300$0.170—
Austin281$0.180$0.200$0.240-13.04%
Beaumont9$0.250$0.250$0.300—
Brownwood51$1.00$1.65$1.10+243.43%
Bryan46$0.130$0.180$0.180—
Childress11$0.240$0.200$0.300—
Corpus Christi48$0.110$0.130$0.170-11.43%
Dallas175$0.150$0.200$0.220-15.25%
El Paso48$0.180$0.200$0.350-27.27%
Fort Worth108$0.130$0.140$0.190-75%
Houston100$0.250$0.200$0.300+139.13%
Laredo20$0.750$0.750$1.20—
Lubbock30$0.210$0.300$0.300+952.63%
Lufkin17$0.150$0.200$0.200—
Odessa37$0.190$0.190$0.170—
Paris35$0.250$0.300$1.00+636.84%
Pharr38$0.220$0.220$0.280-25.93%
San Angelo58$0.120$0.130$0.170+303.85%
San Antonio24$0.350$0.350$0.160+171.88%
Tyler46$0.130$0.160$0.170+120%
Waco5$1.78$0.420$0.480—
Wichita Falls6$0.200$0.180$0.300—
Yoakum77$1.00$0.950$0.200-50%

Related items

Is your price for item 666-7213 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.