Bonding Course (Item 3007-7001): TxDOT Unit Price History
1,204 bids · 224 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure GAL
TxDOT 3007-7001 · BONDING COURSE · Unit: GAL
- Low bid
- $3.24/GAL
- Quantity-weighted median of winning unit prices
- Weighted median
- $4.00/GAL
- Quantity-weighted median of every bid
- Engineer’s estimate
- $3.50/GAL
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -1.82%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 3007-7001 (Bonding Course) is measured in GAL. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,204 bids for it on 224 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 653 bids was $4.00 per GAL, and the winning low bidders priced it at a weighted median of $3.24 per GAL.
TxDOT's engineer's estimate for the same lines had a weighted median of $3.50 per GAL, so winning bids came in 7.4% below the estimate.
By calendar year, the median bid moved from $4.25 in 2025 (579 bids) to $4.07 in 2026 (589 bids), down 4.2%. The middle half of 2026 bids fell between $3.46 and $5.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 1.82%.
Quantity matters for this item. Lines of 39 to 4,471 GAL had a weighted median of $4.60, while lines above 17,707 GAL had $4.00, a 13% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 200 lines where both a winning and a second-place bid were published, the median winning unit price was $4.00 against $4.00 from the second-lowest bidder, a median gap of 1.25% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 10 TxDOT districts with at least ten bids, Laredo had the lowest weighted median ($3.24) and Paris the highest ($5.50). The busiest district for this item was Austin.
The most recent letting with this item was on Nov 4, 2026 in Hays County, where Bobcat Services, Inc. was the low bidder at $4.20 per GAL for 21,627 GAL against an estimate of $3.25.
72 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 752-7005 Tree Removal (4" - 12" DIA) (weighted median $75.00 per EA); 688-7001 PED Detect Push Button (APS) (weighted median $1,020.00 per EA); 687-7001 PED Pole Assembly (weighted median $2,860.00 per EA); 682-7003 VEH SIG SEC (12")LED(YEL) (weighted median $345.00 per EA).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 36 | 7 | $4.86 | $5.00 | $4.71 | $4.00 | $5.12 |
| 2025 | 579 | 110 | $4.11 | $4.00 | $4.25 | $3.69 | $5.52 |
| 2026 | 589 | 107 | $3.97 | $4.00 | $4.07 | $3.46 | $5.00 |
Quantity bands
| Band | Quantity (GAL) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 39–4,471 | 409 | $5.18 | $4.60 | $3.96–$6.80 |
| Medium | 4,519–17,666 | 396 | $4.51 | $4.00 | $3.50–$5.00 |
| Large | 17,707–203,597 | 399 | $3.94 | $4.00 | $3.29–$4.79 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $4.00
- Median second-low unit price
- $4.00
- Median engineer’s estimate
- $4.18
- Median gap, second vs. low
- +1.25%
200 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0016-03-125 · let Nov 4, 2026 · Hays County, Austin District
Line quantity 21,627 GAL · Engineer’s estimate $3.25/GAL
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Bobcat Services, Inc.LOW BID | $4.20/GAL | $90,833.40 | — | +29.2% | $2,797,454 | $386,828 (13.83%) left on table |
| 2 | Hunter Industries, Ltd. | $3.75/GAL | $81,101.25 | -$9,732 | +15.4% | $3,184,282 | +$386,828 |
| 3 | Dean Word Company, Ltd. | $3.75/GAL | $81,101.25 | -$9,732 | +15.4% | $3,495,937 | +$698,482 |
| 4 | Texas Materials Group, Inc. | $4.00/GAL | $86,508.00 | -$4,325 | +23.1% | $3,586,449 | +$788,995 |
| 5 | Lone Star Paving Company | $3.25/GAL | $70,287.75 | -$20,546 | 0% | $3,801,261 | +$1,003,807 |
| 6 | Clark Construction of Texas, Inc. | $4.50/GAL | $97,321.50 | +$6,488 | +38.5% | $3,825,058 | +$1,027,604 |
1. Bobcat Services, Inc.
LOW BID · WINNER- Unit price
- $4.20/GAL
- Extension
- $90,833.40
- Proposal total
- $2,797,454
- Money left on the table
- $386,828 (13.83%)
- vs. engineer’s estimate
- +29.2%
- Unit price
- $3.75/GAL
- Extension
- $81,101.25
- Proposal total
- $3,184,282
- vs. low bid
- +$386,828
- vs. engineer’s estimate
- +15.4%
- Unit price
- $3.75/GAL
- Extension
- $81,101.25
- Proposal total
- $3,495,937
- vs. low bid
- +$698,482
- vs. engineer’s estimate
- +15.4%
- Unit price
- $4.00/GAL
- Extension
- $86,508.00
- Proposal total
- $3,586,449
- vs. low bid
- +$788,995
- vs. engineer’s estimate
- +23.1%
- Unit price
- $3.25/GAL
- Extension
- $70,287.75
- Proposal total
- $3,801,261
- vs. low bid
- +$1,003,807
- vs. engineer’s estimate
- 0%
- Unit price
- $4.50/GAL
- Extension
- $97,321.50
- Proposal total
- $3,825,058
- vs. low bid
- +$1,027,604
- vs. engineer’s estimate
- +38.5%
Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District
Line quantity 24,419 GAL · Engineer’s estimate $5.50/GAL
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Fluor Enterprises, Inc.LOW BID | $4.20/GAL | $102,559.80 | — | -23.6% | $30,209,876 | $2,977,718 (9.86%) left on table |
| 2 | Big Creek Construction, Ltd. | $4.00/GAL | $97,676.00 | -$4,884 | -27.3% | $33,187,594 | +$2,977,718 |
| 3 | Knife River Corporation - South | $3.78/GAL | $92,303.82 | -$10,256 | -31.3% | $33,911,798 | +$3,701,922 |
| 4 | R Construction Civil, LLC | $4.50/GAL | $109,885.50 | +$7,326 | -18.2% | $34,862,676 | +$4,652,800 |
| 5 | James Construction Group, LLC | $4.24/GAL | $103,536.56 | +$976.76 | -22.9% | $39,237,828 | +$9,027,952 |
| 6 | Texas Materials Group, Inc. | $4.40/GAL | $107,443.60 | +$4,884 | -20% | $39,562,405 | +$9,352,529 |
| 7 | A. L. Helmcamp, Inc. | $5.00/GAL | $122,095.00 | +$19,535 | -9.1% | $39,630,699 | +$9,420,823 |
| 8 | Posillico Civil, Inc. | $6.85/GAL | $167,270.15 | +$64,710 | +24.5% | $39,994,995 | +$9,785,119 |
| 9 | Zachry Construction Corporation | $3.78/GAL | $92,303.82 | -$10,256 | -31.3% | $42,444,061 | +$12,234,185 |
| 10 | Brizo Construction, LLC | $4.64/GAL | $113,304.16 | +$10,744 | -15.6% | $43,708,350 | +$13,498,474 |
| 11 | Granite Construction Company | $4.05/GAL | $98,896.95 | -$3,663 | -26.4% | $44,387,970 | +$14,178,094 |
| 12 | Isi Contracting, Inc. | $5.26/GAL | $128,443.94 | +$25,884 | -4.4% | $48,396,973 | +$18,187,097 |
1. Fluor Enterprises, Inc.
LOW BID · WINNER- Unit price
- $4.20/GAL
- Extension
- $102,559.80
- Proposal total
- $30,209,876
- Money left on the table
- $2,977,718 (9.86%)
- vs. engineer’s estimate
- -23.6%
- Unit price
- $4.00/GAL
- Extension
- $97,676.00
- Proposal total
- $33,187,594
- vs. low bid
- +$2,977,718
- vs. engineer’s estimate
- -27.3%
- Unit price
- $3.78/GAL
- Extension
- $92,303.82
- Proposal total
- $33,911,798
- vs. low bid
- +$3,701,922
- vs. engineer’s estimate
- -31.3%
- Unit price
- $4.50/GAL
- Extension
- $109,885.50
- Proposal total
- $34,862,676
- vs. low bid
- +$4,652,800
- vs. engineer’s estimate
- -18.2%
- Unit price
- $4.24/GAL
- Extension
- $103,536.56
- Proposal total
- $39,237,828
- vs. low bid
- +$9,027,952
- vs. engineer’s estimate
- -22.9%
- Unit price
- $4.40/GAL
- Extension
- $107,443.60
- Proposal total
- $39,562,405
- vs. low bid
- +$9,352,529
- vs. engineer’s estimate
- -20%
- Unit price
- $5.00/GAL
- Extension
- $122,095.00
- Proposal total
- $39,630,699
- vs. low bid
- +$9,420,823
- vs. engineer’s estimate
- -9.1%
- Unit price
- $6.85/GAL
- Extension
- $167,270.15
- Proposal total
- $39,994,995
- vs. low bid
- +$9,785,119
- vs. engineer’s estimate
- +24.5%
9. Zachry Construction Corporation
- Unit price
- $3.78/GAL
- Extension
- $92,303.82
- Proposal total
- $42,444,061
- vs. low bid
- +$12,234,185
- vs. engineer’s estimate
- -31.3%
10. Brizo Construction, LLC
- Unit price
- $4.64/GAL
- Extension
- $113,304.16
- Proposal total
- $43,708,350
- vs. low bid
- +$13,498,474
- vs. engineer’s estimate
- -15.6%
- Unit price
- $4.05/GAL
- Extension
- $98,896.95
- Proposal total
- $44,387,970
- vs. low bid
- +$14,178,094
- vs. engineer’s estimate
- -26.4%
- Unit price
- $5.26/GAL
- Extension
- $128,443.94
- Proposal total
- $48,396,973
- vs. low bid
- +$18,187,097
- vs. engineer’s estimate
- -4.4%
Proposal 0922-33-234 · let Nov 4, 2026 · Webb County, Laredo District
Line quantity 315 GAL · Engineer’s estimate $5.00/GAL
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Stx CivilLOW BID | $12.94/GAL | $4,076.10 | — | +158.8% | $2,866,785 | $83,215 (2.9%) left on table |
| 2 | Delgado's Contractors, LLC | $6.00/GAL | $1,890.00 | -$2,186 | +20% | $2,950,000 | +$83,215 |
| 3 | Acee Construction LLC. | $5.45/GAL | $1,716.75 | -$2,359 | +9% | $3,033,273 | +$166,488 |
| 4 | James Construction Group, LLC | $5.00/GAL | $1,575.00 | -$2,501 | 0% | $3,261,472 | +$394,687 |
| 5 | E-Z Bel Construction, LLC | $20.00/GAL | $6,300.00 | +$2,224 | +300% | $3,270,969 | +$404,184 |
| 6 | Lucania Contractors LLC | $10.00/GAL | $3,150.00 | -$926.10 | +100% | $3,466,015 | +$599,230 |
| 7 | Foremost Paving, Inc. | $3.40/GAL | $1,071.00 | -$3,005 | -32% | $5,083,300 | +$2,216,516 |
1. Stx Civil
LOW BID · WINNER- Unit price
- $12.94/GAL
- Extension
- $4,076.10
- Proposal total
- $2,866,785
- Money left on the table
- $83,215 (2.9%)
- vs. engineer’s estimate
- +158.8%
- Unit price
- $6.00/GAL
- Extension
- $1,890.00
- Proposal total
- $2,950,000
- vs. low bid
- +$83,215
- vs. engineer’s estimate
- +20%
3. Acee Construction LLC.
- Unit price
- $5.45/GAL
- Extension
- $1,716.75
- Proposal total
- $3,033,273
- vs. low bid
- +$166,488
- vs. engineer’s estimate
- +9%
- Unit price
- $5.00/GAL
- Extension
- $1,575.00
- Proposal total
- $3,261,472
- vs. low bid
- +$394,687
- vs. engineer’s estimate
- 0%
- Unit price
- $20.00/GAL
- Extension
- $6,300.00
- Proposal total
- $3,270,969
- vs. low bid
- +$404,184
- vs. engineer’s estimate
- +300%
- Unit price
- $10.00/GAL
- Extension
- $3,150.00
- Proposal total
- $3,466,015
- vs. low bid
- +$599,230
- vs. engineer’s estimate
- +100%
- Unit price
- $3.40/GAL
- Extension
- $1,071.00
- Proposal total
- $5,083,300
- vs. low bid
- +$2,216,516
- vs. engineer’s estimate
- -32%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0016-03-125 | Hays | Austin | 21,627 | 6 | Bobcat Services, Inc. | $4.20 | $3.25 |
| 2026-11-04 | 0212-03-058 | Brazos | Bryan | 24,419 | 12 | Fluor Enterprises, Inc. | $4.20 | $5.50 |
| 2026-11-04 | 0922-33-234 | Webb | Laredo | 315 | 7 | Stx Civil | $12.94 | $5.00 |
| 2026-11-04 | 1017-03-040 | Hunt | Paris | 2,877 | 9 | Highway 19 Construction LLC | $5.00 | $4.50 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 54,084 | 6 | Austin Bridge & Road Services, LP | $5.00 | $2.97 |
| 2026-11-03 | 0220-01-038 | Hidalgo | Pharr | 29,518 | 2 | Foremost Paving, Inc. | $2.83 | $3.20 |
| 2026-10-07 | 0143-03-049 | Wilson | San Antonio | 19,376 | 8 | Hunter Industries, Ltd. | $2.87 | $4.00 |
| 2026-10-07 | 0200-01-093 | Angelina | Lufkin | 19,394 | 7 | Longview Bridge and Road, Ltd. | $5.00 | $6.00 |
| 2026-09-30 | 6506-32-001 | Nacogdoches | Lufkin | 1,819 | 2 | Texas Materials Group, Inc. | $4.12 | $5.00 |
| 2026-09-03 | 0573-02-008 | Caldwell | Austin | 15,724 | 8 | Hunter Industries, Ltd. | $3.37 | $3.25 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 8 | $4.00 | $4.34 | $6.00 | — |
| Atlanta | 5 | $6.00 | $6.00 | $3.50 | — |
| Austin | 357 | $3.65 | $4.00 | $3.35 | 0% |
| Brownwood | 37 | $5.00 | $4.00 | $3.50 | 0% |
| Bryan | 78 | $4.20 | $4.24 | $5.50 | -0.99% |
| Fort Worth | 7 | $4.40 | $4.75 | $6.00 | — |
| Houston | 7 | $3.00 | $3.65 | $4.00 | — |
| Laredo | 74 | $3.11 | $3.24 | $3.25 | +3.9% |
| Lufkin | 103 | $4.00 | $4.75 | $6.00 | -9.31% |
| Odessa | 149 | $3.00 | $4.50 | $3.00 | -4.68% |
| Paris | 29 | $4.51 | $5.50 | $3.50 | -0.9% |
| Pharr | 131 | $3.00 | $4.00 | $3.50 | -2.68% |
| San Antonio | 157 | $3.70 | $3.65 | $3.69 | +6.1% |
| Waco | 4 | $1.00 | $4.00 | $5.00 | — |
| Wichita Falls | 58 | $5.80 | $4.20 | $4.00 | -11.11% |
Related items
- 752-7005 · Tree Removal (4" - 12" DIA) ($75.00/EA)
- 688-7001 · PED Detect Push Button (APS) ($1,020.00/EA)
- 687-7001 · PED Pole Assembly ($2,860.00/EA)
- 682-7003 · VEH SIG SEC (12")LED(YEL) ($345.00/EA)
- 682-7005 · VEH SIG SEC (12")LED(RED) ($345.00/EA)
- 682-7002 · VEH SIG SEC (12")LED(GRN ARW) ($345.00/EA)
- 682-7004 · VEH SIG SEC (12")LED(YEL ARW) ($343.00/EA)
- 682-7001 · VEH SIG SEC (12")LED(GRN) ($345.00/EA)