Tree Removal (4" - 12" DIA) (Item 752-7005): TxDOT Unit Price History
1,234 bids · 184 bid lines · Nov 6, 2024 to Nov 19, 2026 · unit of measure EA
TxDOT 752-7005 · TREE REMOVAL (4" - 12" DIA) · Unit: EA
- Low bid
- $45.00/EA
- Quantity-weighted median of winning unit prices
- Weighted median
- $75.00/EA
- Quantity-weighted median of every bid
- Engineer’s estimate
- $56.44/EA
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- +56.82%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 19, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 752-7005 (Tree Removal (4" - 12" DIA)) is measured in EA. Between Nov 6, 2024 and Nov 19, 2026, contractors entered 1,234 bids for it on 184 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 596 bids was $75.00 per EA, and the winning low bidders priced it at a weighted median of $45.00 per EA.
TxDOT's engineer's estimate for the same lines had a weighted median of $56.44 per EA, so winning bids came in 20.3% below the estimate.
By calendar year, the median bid moved from $110.00 in 2025 (582 bids) to $175.00 in 2026 (565 bids), up 59.1%. The middle half of 2026 bids fell between $90.00 and $490.00.
Comparing the last 12 months with the 12 months before, the median unit price rose 56.82%.
Quantity matters for this item. Lines of 1 to 15 EA had a weighted median of $500.00, while lines above 358 EA had $60.00, a 88% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 185 lines where both a winning and a second-place bid were published, the median winning unit price was $110.00 against $100.00 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 20 TxDOT districts with at least ten bids, Lufkin had the lowest weighted median ($45.00) and Wichita Falls the highest ($800.00). The busiest district for this item was Lufkin.
The most recent letting with this item was on Nov 19, 2026 in Kimble County, where Allies Land Clearing was the low bidder at $175.00 per EA for 128 EA against an estimate of $100.00.
Related items: 688-7001 PED Detect Push Button (APS) (weighted median $1,020.00 per EA); 687-7001 PED Pole Assembly (weighted median $2,860.00 per EA); 682-7003 VEH SIG SEC (12")LED(YEL) (weighted median $345.00 per EA); 682-7005 VEH SIG SEC (12")LED(RED) (weighted median $345.00 per EA).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 87 | 16 | $114.02 | $100.00 | $180.00 | $90.50 | $450.00 |
| 2025 | 582 | 81 | $76.65 | $55.00 | $110.00 | $65.00 | $400.00 |
| 2026 | 565 | 87 | $112.90 | $75.00 | $175.00 | $90.00 | $490.00 |
Quantity bands
| Band | Quantity (EA) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 1–15 | 412 | $694.65 | $500.00 | $250.00–$1,000.00 |
| Medium | 20–350 | 411 | $199.63 | $125.00 | $100.00–$300.00 |
| Large | 358–7,599 | 411 | $80.05 | $60.00 | $50.00–$100.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $110.00
- Median second-low unit price
- $100.00
- Median engineer’s estimate
- $118.63
- Median gap, second vs. low
- +0%
185 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 6512-46-001 · let Nov 19, 2026 · Kimble County, San Angelo District
Line quantity 128 EA · Engineer’s estimate $100.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Allies Land ClearingLOW BID | $175.00/EA | $22,400.00 | — | +75% | $159,400 | $3,250 (2.04%) left on table |
| 2 | Boen Landscaping & Irrigation, LLC | $250.00/EA | $32,000.00 | +$9,600 | +150% | $162,650 | +$3,250 |
| 3 | Claw Contractors, LLC | $100.00/EA | $12,800.00 | -$9,600 | 0% | $181,508 | +$22,108 |
| 4 | Austin Barricade Company, L.L.C. | $500.00/EA | $64,000.00 | +$41,600 | +400% | $189,299 | +$29,899 |
| 5 | Jackson Excavation, LLC | $100.00/EA | $12,800.00 | -$9,600 | 0% | $203,300 | +$43,900 |
| 6 | Looks Great Services of Ms, Inc. | $145.00/EA | $18,560.00 | -$3,840 | +45% | $236,160 | +$76,760 |
| 7 | Western Certified Arborists | $250.00/EA | $32,000.00 | +$9,600 | +150% | $332,650 | +$173,250 |
| 8 | Abescape Landscaping, LLC | $350.00/EA | $44,800.00 | +$22,400 | +250% | $369,016 | +$209,616 |
1. Allies Land Clearing
LOW BID · WINNER- Unit price
- $175.00/EA
- Extension
- $22,400.00
- Proposal total
- $159,400
- Money left on the table
- $3,250 (2.04%)
- vs. engineer’s estimate
- +75%
- Unit price
- $250.00/EA
- Extension
- $32,000.00
- Proposal total
- $162,650
- vs. low bid
- +$3,250
- vs. engineer’s estimate
- +150%
3. Claw Contractors, LLC
- Unit price
- $100.00/EA
- Extension
- $12,800.00
- Proposal total
- $181,508
- vs. low bid
- +$22,108
- vs. engineer’s estimate
- 0%
- Unit price
- $500.00/EA
- Extension
- $64,000.00
- Proposal total
- $189,299
- vs. low bid
- +$29,899
- vs. engineer’s estimate
- +400%
- Unit price
- $100.00/EA
- Extension
- $12,800.00
- Proposal total
- $203,300
- vs. low bid
- +$43,900
- vs. engineer’s estimate
- 0%
- Unit price
- $145.00/EA
- Extension
- $18,560.00
- Proposal total
- $236,160
- vs. low bid
- +$76,760
- vs. engineer’s estimate
- +45%
7. Western Certified Arborists
- Unit price
- $250.00/EA
- Extension
- $32,000.00
- Proposal total
- $332,650
- vs. low bid
- +$173,250
- vs. engineer’s estimate
- +150%
- Unit price
- $350.00/EA
- Extension
- $44,800.00
- Proposal total
- $369,016
- vs. low bid
- +$209,616
- vs. engineer’s estimate
- +250%
Proposal 6508-25-001 · let Nov 17, 2026 · Jefferson County, Beaumont District
Line quantity 100 EA · Engineer’s estimate $350.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Ace Contractors, Inc.LOW BID | $100.00/EA | $10,000.00 | — | -71.4% | $360,270 | $28,480 (7.91%) left on table |
| 2 | Row Contractors LLC | $100.00/EA | $10,000.00 | $0.000 | -71.4% | $388,750 | +$28,480 |
| 3 | Jackson Excavation, LLC | $200.00/EA | $20,000.00 | +$10,000 | -42.9% | $490,500 | +$130,230 |
| 4 | Abescape Landscaping, LLC | $300.00/EA | $30,000.00 | +$20,000 | -14.3% | $525,540 | +$165,270 |
| 5 | Looks Great Services of Ms, Inc. | $350.00/EA | $35,000.00 | +$25,000 | 0% | $548,425 | +$188,155 |
| 6 | Western Certified Arborists | $250.00/EA | $25,000.00 | +$15,000 | -28.6% | $573,750 | +$213,480 |
| 7 | Yellowstone Landscape - Central, Inc. | $101.00/EA | $10,100.00 | +$100.00 | -71.1% | $812,510 | +$452,240 |
- LOW BID · WINNER
- Unit price
- $100.00/EA
- Extension
- $10,000.00
- Proposal total
- $360,270
- Money left on the table
- $28,480 (7.91%)
- vs. engineer’s estimate
- -71.4%
2. Row Contractors LLC
- Unit price
- $100.00/EA
- Extension
- $10,000.00
- Proposal total
- $388,750
- vs. low bid
- +$28,480
- vs. engineer’s estimate
- -71.4%
- Unit price
- $200.00/EA
- Extension
- $20,000.00
- Proposal total
- $490,500
- vs. low bid
- +$130,230
- vs. engineer’s estimate
- -42.9%
- Unit price
- $300.00/EA
- Extension
- $30,000.00
- Proposal total
- $525,540
- vs. low bid
- +$165,270
- vs. engineer’s estimate
- -14.3%
- Unit price
- $350.00/EA
- Extension
- $35,000.00
- Proposal total
- $548,425
- vs. low bid
- +$188,155
- vs. engineer’s estimate
- 0%
6. Western Certified Arborists
- Unit price
- $250.00/EA
- Extension
- $25,000.00
- Proposal total
- $573,750
- vs. low bid
- +$213,480
- vs. engineer’s estimate
- -28.6%
- Unit price
- $101.00/EA
- Extension
- $10,100.00
- Proposal total
- $812,510
- vs. low bid
- +$452,240
- vs. engineer’s estimate
- -71.1%
Proposal 6508-77-001 · let Nov 17, 2026 · Liberty County, Beaumont District
Line quantity 55 EA · Engineer’s estimate $350.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | L & M Mowing Contractors, LLCLOW BID | $300.00/EA | $16,500.00 | — | -14.3% | $191,770 | $20,285 (10.58%) left on table |
| 2 | Ace Contractors, Inc. | $100.00/EA | $5,500.00 | -$11,000 | -71.4% | $212,055 | +$20,285 |
| 3 | Row Contractors LLC | $50.00/EA | $2,750.00 | -$13,750 | -85.7% | $220,320 | +$28,550 |
| 4 | Looks Great Services of Ms, Inc. | $250.00/EA | $13,750.00 | -$2,750 | -28.6% | $282,750 | +$90,980 |
| 5 | Jackson Excavation, LLC | $100.00/EA | $5,500.00 | -$11,000 | -71.4% | $286,250 | +$94,480 |
| 6 | Abescape Landscaping, LLC | $300.00/EA | $16,500.00 | $0.000 | -14.3% | $313,020 | +$121,250 |
| 7 | Gv Landscape and Construction LLC | $150.00/EA | $8,250.00 | -$8,250 | -57.1% | $322,500 | +$130,730 |
| 8 | Western Certified Arborists | $250.00/EA | $13,750.00 | -$2,750 | -28.6% | $497,500 | +$305,730 |
| 9 | Yellowstone Landscape - Central, Inc. | $101.00/EA | $5,555.00 | -$10,945 | -71.1% | $689,930 | +$498,160 |
1. L & M Mowing Contractors, LLC
LOW BID · WINNER- Unit price
- $300.00/EA
- Extension
- $16,500.00
- Proposal total
- $191,770
- Money left on the table
- $20,285 (10.58%)
- vs. engineer’s estimate
- -14.3%
- Unit price
- $100.00/EA
- Extension
- $5,500.00
- Proposal total
- $212,055
- vs. low bid
- +$20,285
- vs. engineer’s estimate
- -71.4%
3. Row Contractors LLC
- Unit price
- $50.00/EA
- Extension
- $2,750.00
- Proposal total
- $220,320
- vs. low bid
- +$28,550
- vs. engineer’s estimate
- -85.7%
- Unit price
- $250.00/EA
- Extension
- $13,750.00
- Proposal total
- $282,750
- vs. low bid
- +$90,980
- vs. engineer’s estimate
- -28.6%
- Unit price
- $100.00/EA
- Extension
- $5,500.00
- Proposal total
- $286,250
- vs. low bid
- +$94,480
- vs. engineer’s estimate
- -71.4%
- Unit price
- $300.00/EA
- Extension
- $16,500.00
- Proposal total
- $313,020
- vs. low bid
- +$121,250
- vs. engineer’s estimate
- -14.3%
- Unit price
- $150.00/EA
- Extension
- $8,250.00
- Proposal total
- $322,500
- vs. low bid
- +$130,730
- vs. engineer’s estimate
- -57.1%
8. Western Certified Arborists
- Unit price
- $250.00/EA
- Extension
- $13,750.00
- Proposal total
- $497,500
- vs. low bid
- +$305,730
- vs. engineer’s estimate
- -28.6%
- Unit price
- $101.00/EA
- Extension
- $5,555.00
- Proposal total
- $689,930
- vs. low bid
- +$498,160
- vs. engineer’s estimate
- -71.1%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-19 | 6512-46-001 | Kimble | San Angelo | 128 | 8 | Allies Land Clearing | $175.00 | $100.00 |
| 2026-11-17 | 6508-25-001 | Jefferson | Beaumont | 100 | 7 | Ace Contractors, Inc. | $100.00 | $350.00 |
| 2026-11-17 | 6508-77-001 | Liberty | Beaumont | 55 | 9 | L & M Mowing Contractors, LLC | $300.00 | $350.00 |
| 2026-11-17 | 6508-79-001 | Jasper | Beaumont | 150 | 8 | Ace Contractors, Inc. | $100.00 | $350.00 |
| 2026-11-12 | 6504-61-001 | Potter | Amarillo | 15 | 7 | Ti-Zack Concrete, LLC | $411.25 | $600.00 |
| 2026-11-12 | 6510-59-001 | Hemphill | Amarillo | 116 | 8 | Allies Land Clearing | $175.00 | $200.00 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 115 | 6 | Austin Bridge & Road Services, LP | $66.52 | $95.70 |
| 2026-10-28 | 6510-51-001 | San Augustine | Lufkin | 1,000 | 4 | Ace Contractors, Inc. | $40.00 | $50.00 |
| 2026-10-14 | 6501-52-001 | Ellis | Dallas | 71 | 8 | Gv Landscape and Construction LLC | $120.00 | $68.92 |
| 2026-10-08 | 6509-34-001 | Colorado | Yoakum | 150 | 6 | Row Contractors LLC | $50.00 | $70.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 22 | $107.00 | $120.00 | $125.00 | — |
| Amarillo | 24 | $175.00 | $185.00 | $200.00 | — |
| Atlanta | 53 | $100.00 | $100.00 | $175.00 | +42.86% |
| Austin | 70 | $100.00 | $175.00 | $100.00 | -60% |
| Beaumont | 61 | $100.00 | $200.00 | $350.00 | 0% |
| Brownwood | 47 | $125.00 | $150.00 | $99.87 | — |
| Bryan | 84 | $100.00 | $110.00 | $100.00 | -30% |
| Childress | 7 | $30.00 | $55.00 | $52.00 | — |
| Corpus Christi | 62 | $100.00 | $200.00 | $150.00 | +84.62% |
| Dallas | 125 | $80.00 | $90.00 | $100.00 | -9.09% |
| Fort Worth | 126 | $50.00 | $100.00 | $70.84 | -25% |
| Houston | 30 | $300.00 | $325.00 | $100.00 | — |
| Laredo | 9 | $400.00 | $500.00 | $400.00 | — |
| Lufkin | 133 | $45.00 | $45.00 | $50.00 | 0% |
| Odessa | 6 | $250.00 | $607.50 | $400.00 | — |
| Paris | 84 | $40.00 | $80.00 | $55.00 | -53% |
| Pharr | 14 | $250.00 | $150.00 | $80.00 | — |
| San Angelo | 26 | $175.00 | $212.50 | $100.00 | — |
| San Antonio | 75 | $206.00 | $206.00 | $125.00 | -40% |
| Tyler | 33 | $30.00 | $45.00 | $45.00 | — |
| Waco | 59 | $75.00 | $150.00 | $125.00 | +100% |
| Wichita Falls | 62 | $500.00 | $800.00 | $100.00 | +60.35% |
| Yoakum | 22 | $50.00 | $120.00 | $70.00 | — |
Related items
- 688-7001 · PED Detect Push Button (APS) ($1,020.00/EA)
- 687-7001 · PED Pole Assembly ($2,860.00/EA)
- 682-7003 · VEH SIG SEC (12")LED(YEL) ($345.00/EA)
- 682-7005 · VEH SIG SEC (12")LED(RED) ($345.00/EA)
- 682-7002 · VEH SIG SEC (12")LED(GRN ARW) ($345.00/EA)
- 682-7004 · VEH SIG SEC (12")LED(YEL ARW) ($343.00/EA)
- 682-7001 · VEH SIG SEC (12")LED(GRN) ($345.00/EA)
- 682-7006 · VEH SIG SEC (12")LED(RED ARW) ($345.00/EA)
Is your price for item 752-7005 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.