Plain Neoprene Bearing Pads (Item 0400148): FDOT Unit Price History
13 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure CF
- Weighted average (12 mo)
- $1,441.36/CF
- Contracts (12 mo)
- 13
- Total quantity (12 mo)
- 182 CF
- Total amount (12 mo)
- $262,327
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 12 | $1,678.92 | 304.7 | $511,566 |
| 2025 | 2025-01-01 – 2025-12-31 | 9 | $1,517.52 | 136.7 | $207,445 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 13 | $1,441.36 | 182 | $262,327 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 5 | $1,731.13 | +20.1% | 63.8 |
| 02 | 1 | $1,200.00 | -16.7% | 22 |
| 03 | 3 | $1,338.13 | -7.2% | 50.3 |
| 04 | 2 | $1,116.80 | -22.5% | 35 |
| 09 | 1 | $2,695.07 | +87% | 2.7 |
| 11 | 1 | $1,440.00 | -0.1% | 8.2 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0400148 (Plain Neoprene Bearing Pads) is measured in CF. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 13 contracts with a quantity-weighted average of $1,441.36 per CF, on 182 CF worth $262,327 in total.
The same report run for earlier periods shows $1,678.92 in 2024 (12 contracts, 304.7 CF), $1,517.52 in 2025 (9 contracts, 136.7 CF), $1,441.36 in the latest 12 months (13 contracts, 182 CF). From 2024 to the latest 12 months the weighted average fell 14.1%.
Quantity let statewide shrank 40% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
In the same 12 months, 6 of FDOT's 14 market areas reported this item: area 01 at $1,731.13 (5 contracts), area 02 at $1,200.00 (1 contract), area 03 at $1,338.13 (3 contracts), area 04 at $1,116.80 (2 contracts), area 09 at $2,695.07 (1 contract), area 11 at $1,440.00 (1 contract).
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.