Pavement Sler 8" (Item 666-7348): TxDOT Unit Price History
1,294 bids · 258 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure LF
TxDOT 666-7348 · PAVEMENT SLER 8" · Unit: LF
- Low bid
- $0.210/LF
- Quantity-weighted median of winning unit prices
- Weighted median
- $0.290/LF
- Quantity-weighted median of every bid
- Engineer’s estimate
- $0.320/LF
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -20%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 666-7348 (Pavement Sler 8") is measured in LF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,294 bids for it on 258 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 700 bids was $0.290 per LF, and the winning low bidders priced it at a weighted median of $0.210 per LF.
TxDOT's engineer's estimate for the same lines had a weighted median of $0.320 per LF, so winning bids came in 34.4% below the estimate.
By calendar year, the median bid moved from $0.500 in 2025 (578 bids) to $0.400 in 2026 (673 bids), down 20.0%. The middle half of 2026 bids fell between $0.280 and $0.650.
Comparing the last 12 months with the 12 months before, the median unit price fell 20%.
Quantity matters for this item. Lines of 10 to 756 LF had a weighted median of $0.650, while lines above 4,729 LF had $0.300, a 54% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 252 lines where both a winning and a second-place bid were published, the median winning unit price was $0.460 against $0.490 from the second-lowest bidder, a median gap of 3% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 16 TxDOT districts with at least ten bids, Houston had the lowest weighted median ($0.240) and Abilene the highest ($2.00). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 4, 2026 in Collin County, where Mario Sinacola & Sons Excavating, Inc. was the low bidder at $0.250 per LF for 11,428 LF against an estimate of $0.290.
1 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 666-7024 Refl PAV MRK TY I (W)8"(SLD)(100MIL) (weighted median $0.850 per LF); 666-7423 Refl PAV MRK TY I (Y)6"(SLD)(100MIL) (weighted median $0.450 per LF); 666-7036 Refl PAV MRK TY I (W)24"(SLD)(100MIL) (weighted median $7.00 per LF); 666-7411 Refl PAV MRK TY I (W)6"(SLD)(100MIL) (weighted median $0.450 per LF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 43 | 10 | $0.560 | $0.400 | $0.500 | $0.400 | $1.10 |
| 2025 | 578 | 118 | $0.480 | $0.350 | $0.500 | $0.320 | $1.00 |
| 2026 | 673 | 130 | $0.350 | $0.290 | $0.400 | $0.280 | $0.650 |
Quantity bands
| Band | Quantity (LF) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 10–756 | 433 | $1.22 | $0.650 | $0.450–$1.38 |
| Medium | 763–4,556 | 431 | $0.700 | $0.480 | $0.300–$0.800 |
| Large | 4,729–293,304 | 430 | $0.350 | $0.300 | $0.250–$0.480 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $0.460
- Median second-low unit price
- $0.490
- Median engineer’s estimate
- $0.600
- Median gap, second vs. low
- +3%
252 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District
Line quantity 11,428 LF · Engineer’s estimate $0.290/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Mario Sinacola & Sons Excavating, Inc.LOW BID | $0.25/LF | $2,857.00 | — | -13.8% | $35,766,135 | $890,797 (2.49%) left on table |
| 2 | Ed Bell Construction Company | $0.47/LF | $5,371.16 | +$2,514 | +62.1% | $36,656,931 | +$890,797 |
| 3 | Tiseo Paving Company, LLC | $0.50/LF | $5,714.00 | +$2,857 | +72.4% | $38,169,956 | +$2,403,821 |
| 4 | Harper Brothers Construction LLC | $0.28/LF | $3,199.84 | +$342.84 | -3.4% | $40,441,503 | +$4,675,368 |
1. Mario Sinacola & Sons Excavating, Inc.
LOW BID · WINNER- Unit price
- $0.25/LF
- Extension
- $2,857.00
- Proposal total
- $35,766,135
- Money left on the table
- $890,797 (2.49%)
- vs. engineer’s estimate
- -13.8%
- Unit price
- $0.47/LF
- Extension
- $5,371.16
- Proposal total
- $36,656,931
- vs. low bid
- +$890,797
- vs. engineer’s estimate
- +62.1%
3. Tiseo Paving Company, LLC
- Unit price
- $0.50/LF
- Extension
- $5,714.00
- Proposal total
- $38,169,956
- vs. low bid
- +$2,403,821
- vs. engineer’s estimate
- +72.4%
4. Harper Brothers Construction LLC
- Unit price
- $0.28/LF
- Extension
- $3,199.84
- Proposal total
- $40,441,503
- vs. low bid
- +$4,675,368
- vs. engineer’s estimate
- -3.4%
Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District
Line quantity 12,510 LF · Engineer’s estimate $0.200/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc.LOW BID | $0.30/LF | $3,753.00 | — | +50% | $138,145,038 | $5,131,824 (3.71%) left on table |
| 2 | Rpm Xconstruction, LLC | $0.30/LF | $3,753.00 | $0.000 | +50% | $143,276,861 | +$5,131,824 |
| 3 | Mario Sinacola & Sons Excavating, Inc. | $0.35/LF | $4,378.50 | +$625.50 | +75% | $152,579,077 | +$14,434,039 |
| 4 | Webber, LLC | $0.26/LF | $3,252.60 | -$500.40 | +30% | $153,499,152 | +$15,354,114 |
| 5 | Sema Construction, Inc. | $0.26/LF | $3,252.60 | -$500.40 | +30% | $154,136,028 | +$15,990,990 |
| 6 | Zachry Construction Corporation | $0.27/LF | $3,377.70 | -$375.30 | +35% | $154,873,429 | +$16,728,392 |
- LOW BID · WINNER
- Unit price
- $0.30/LF
- Extension
- $3,753.00
- Proposal total
- $138,145,038
- Money left on the table
- $5,131,824 (3.71%)
- vs. engineer’s estimate
- +50%
2. Rpm Xconstruction, LLC
- Unit price
- $0.30/LF
- Extension
- $3,753.00
- Proposal total
- $143,276,861
- vs. low bid
- +$5,131,824
- vs. engineer’s estimate
- +50%
- Unit price
- $0.35/LF
- Extension
- $4,378.50
- Proposal total
- $152,579,077
- vs. low bid
- +$14,434,039
- vs. engineer’s estimate
- +75%
4. Webber, LLC
- Unit price
- $0.26/LF
- Extension
- $3,252.60
- Proposal total
- $153,499,152
- vs. low bid
- +$15,354,114
- vs. engineer’s estimate
- +30%
5. Sema Construction, Inc.
- Unit price
- $0.26/LF
- Extension
- $3,252.60
- Proposal total
- $154,136,028
- vs. low bid
- +$15,990,990
- vs. engineer’s estimate
- +30%
6. Zachry Construction Corporation
- Unit price
- $0.27/LF
- Extension
- $3,377.70
- Proposal total
- $154,873,429
- vs. low bid
- +$16,728,392
- vs. engineer’s estimate
- +35%
Proposal 0015-13-432 · let Nov 3, 2026 · Travis County, Austin District
Line quantity 38,103 LF · Engineer’s estimate $0.900/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Austin Bridge & Road Services, LPLOW BID | $0.22/LF | $8,382.66 | — | -75.6% | $412,233,374 | $3,506,193 (0.85%) left on table |
| 2 | Pulice Construction, Inc. | $0.71/LF | $27,053.13 | +$18,670 | -21.1% | $415,739,567 | +$3,506,193 |
| 3 | Fluor Enterprises, Inc. | $0.75/LF | $28,577.25 | +$20,195 | -16.7% | $473,353,333 | +$61,119,959 |
| 4 | Harper Brothers Construction LLC | $0.50/LF | $19,051.50 | +$10,669 | -44.4% | $477,550,553 | +$65,317,180 |
| 5 | Webber, LLC | $0.70/LF | $26,672.10 | +$18,289 | -22.2% | $477,564,067 | +$65,330,694 |
| 6 | Balfour Beatty Infrastructure, Inc. | $0.22/LF | $8,382.66 | $0.000 | -75.6% | $492,134,823 | +$79,901,450 |
1. Austin Bridge & Road Services, LP
LOW BID · WINNER- Unit price
- $0.22/LF
- Extension
- $8,382.66
- Proposal total
- $412,233,374
- Money left on the table
- $3,506,193 (0.85%)
- vs. engineer’s estimate
- -75.6%
2. Pulice Construction, Inc.
- Unit price
- $0.71/LF
- Extension
- $27,053.13
- Proposal total
- $415,739,567
- vs. low bid
- +$3,506,193
- vs. engineer’s estimate
- -21.1%
3. Fluor Enterprises, Inc.
- Unit price
- $0.75/LF
- Extension
- $28,577.25
- Proposal total
- $473,353,333
- vs. low bid
- +$61,119,959
- vs. engineer’s estimate
- -16.7%
4. Harper Brothers Construction LLC
- Unit price
- $0.50/LF
- Extension
- $19,051.50
- Proposal total
- $477,550,553
- vs. low bid
- +$65,317,180
- vs. engineer’s estimate
- -44.4%
5. Webber, LLC
- Unit price
- $0.70/LF
- Extension
- $26,672.10
- Proposal total
- $477,564,067
- vs. low bid
- +$65,330,694
- vs. engineer’s estimate
- -22.2%
6. Balfour Beatty Infrastructure, Inc.
- Unit price
- $0.22/LF
- Extension
- $8,382.66
- Proposal total
- $492,134,823
- vs. low bid
- +$79,901,450
- vs. engineer’s estimate
- -75.6%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0047-04-032 | Collin | Dallas | 11,428 | 4 | Mario Sinacola & Sons Excavating, Inc. | $0.250 | $0.290 |
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 12,510 | 6 | Indus Road & Bridge, Inc. | $0.300 | $0.200 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 38,103 | 6 | Austin Bridge & Road Services, LP | $0.220 | $0.900 |
| 2026-11-03 | 0038-01-107 | Webb | Laredo | 90 | 4 | Hjc Farms, Inc. | $1.05 | $0.250 |
| 2026-11-03 | 3330-01-011 | McLennan | Waco | 592 | 9 | The Levy Company, LLC | $0.630 | $0.500 |
| 2026-10-14 | 6502-76-001 | Ellis | Dallas | 5,000 | 2 | Stripe-A-Zone, LLC | $0.400 | $0.350 |
| 2026-10-07 | 0143-03-049 | Wilson | San Antonio | 32,363 | 8 | Hunter Industries, Ltd. | $0.250 | $0.310 |
| 2026-10-07 | 0907-00-217 | Tom Green | San Angelo | 1,242 | 7 | Flat Line, Inc. | $1.00 | $1.39 |
| 2026-10-07 | 6507-19-001 | Medina | San Antonio | 2,308 | 3 | Ronald R. Wagner & Co., LP | $0.250 | $0.750 |
| 2026-10-06 | 6496-83-001 | Gregg | Tyler | 100 | 2 | Striping Technology, L.P. | $1.00 | $0.300 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 14 | $2.00 | $2.00 | $0.570 | — |
| Amarillo | 3 | $0.450 | $0.450 | $0.400 | — |
| Atlanta | 13 | $0.540 | $0.550 | $0.600 | — |
| Austin | 52 | $0.220 | $0.550 | $0.900 | -26.32% |
| Beaumont | 52 | $0.140 | $0.250 | $0.250 | -50% |
| Brownwood | 6 | $0.200 | $0.260 | $0.550 | — |
| Bryan | 42 | $0.250 | $0.600 | $0.250 | — |
| Childress | 3 | $2.00 | $2.50 | $0.500 | — |
| Dallas | 309 | $0.280 | $0.280 | $0.300 | -22.22% |
| Fort Worth | 135 | $0.250 | $0.270 | $0.250 | -20% |
| Houston | 65 | $0.280 | $0.240 | $0.200 | +16.67% |
| Laredo | 67 | $0.600 | $0.500 | $0.430 | -19.57% |
| Lubbock | 5 | $0.900 | $0.900 | $1.50 | — |
| Odessa | 24 | $0.550 | $0.400 | $0.550 | -60% |
| Paris | 18 | $0.500 | $0.500 | $0.880 | — |
| Pharr | 56 | $0.900 | $0.700 | $2.80 | -9.09% |
| San Angelo | 18 | $1.00 | $0.500 | $1.39 | — |
| San Antonio | 266 | $0.300 | $0.400 | $0.400 | -20% |
| Tyler | 53 | $0.100 | $0.300 | $0.300 | 0% |
| Waco | 83 | $0.150 | $0.250 | $0.320 | -17.42% |
| Wichita Falls | 7 | $0.240 | $0.450 | $0.500 | — |
| Yoakum | 3 | $0.800 | $0.800 | $0.350 | — |
Related items
- 666-7024 · Refl PAV MRK TY I (W)8"(SLD)(100MIL) ($0.850/LF)
- 666-7423 · Refl PAV MRK TY I (Y)6"(SLD)(100MIL) ($0.450/LF)
- 666-7036 · Refl PAV MRK TY I (W)24"(SLD)(100MIL) ($7.00/LF)
- 666-7411 · Refl PAV MRK TY I (W)6"(SLD)(100MIL) ($0.450/LF)
- 666-7408 · Refl PAV MRK TY I (W)6"(BRK)(100MIL) ($0.520/LF)
- 666-7347 · Pavement Sler 6" ($0.190/LF)
- 666-7420 · Refl PAV MRK TY I (Y)6"(BRK)(100MIL) ($0.450/LF)
- 666-7042 · Refl PAV MRK TY I (W)(Arrow)(100MIL) ($150.00/EA)